Volumn 235, Issue 1, 2014, Pages 62-72

An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances

Author keywords

Metaheuristics; Multi mode; Project scheduling

Indexed keywords


EID: 84895063779     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2013.10.012     Document Type: Article
Times cited : (143)

References (60)
  • 1
    • 0038209741 scopus 로고    scopus 로고
    • Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    • J. Alcaraz, C. Maroto, and R. Ruiz Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms Journal of the Operational Research Society 54 2003 614 626
    • (2003) Journal of the Operational Research Society , vol.54 , pp. 614-626
    • Alcaraz, J.1    Maroto, C.2    Ruiz, R.3
  • 2
    • 0034561509 scopus 로고    scopus 로고
    • A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and resource flexibility
    • C. Artigues, and F. Roubellat A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and resource flexibility European Journal of Operational Research 127 2000 297 316
    • (2000) European Journal of Operational Research , vol.127 , pp. 297-316
    • Artigues, C.1    Roubellat, F.2
  • 4
    • 0019342681 scopus 로고
    • Scheduling subject to resource constraints: Classification and complexity
    • J. Blazewicz, J. Lenstra, and A. Rinnooy Kan Scheduling subject to resource constraints: Classification and complexity Discrete Applied Mathematics 5 1983 11 24
    • (1983) Discrete Applied Mathematics , vol.5 , pp. 11-24
    • Blazewicz, J.1    Lenstra, J.2    Rinnooy Kan, A.3
  • 5
    • 0027694317 scopus 로고
    • Heuristics for scheduling projects with resource restrictions and several resource-duration modes
    • F. Boctor Heuristics for scheduling projects with resource restrictions and several resource-duration modes International Journal of Production Research 31 1993 2547 2558
    • (1993) International Journal of Production Research , vol.31 , pp. 2547-2558
    • Boctor, F.1
  • 6
    • 0030216966 scopus 로고    scopus 로고
    • An adaption of the simulated annealing for solving resource-constrained project scheduling problems
    • F. Boctor An adaption of the simulated annealing for solving resource-constrained project scheduling problems International Journal of Production Research 34 1996 2335 2351
    • (1996) International Journal of Production Research , vol.34 , pp. 2335-2351
    • Boctor, F.1
  • 7
    • 0030124780 scopus 로고    scopus 로고
    • A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
    • F. Boctor A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes European Journal of Operational Research 90 1996 349 361
    • (1996) European Journal of Operational Research , vol.90 , pp. 349-361
    • Boctor, F.1
  • 8
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • K. Bouleimen, and H. Lecocq A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version European Journal of Operational Research 149 2003 268 281
    • (2003) European Journal of Operational Research , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 10
    • 55349145233 scopus 로고    scopus 로고
    • Ant colony optimization with parameter adaptation for multi-mode resource-constrained project scheduling
    • C. Chiang, Y. Huang, and W. Wang Ant colony optimization with parameter adaptation for multi-mode resource-constrained project scheduling Journal of Intelligent and Fuzzy Systems 29 2008 345 358
    • (2008) Journal of Intelligent and Fuzzy Systems , vol.29 , pp. 345-358
    • Chiang, C.1    Huang, Y.2    Wang, W.3
  • 11
    • 79955596531 scopus 로고    scopus 로고
    • Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
    • J. Coelho, and M. Vanhoucke Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers European Journal of Operational Research 213 2011 73 82
    • (2011) European Journal of Operational Research , vol.213 , pp. 73-82
    • Coelho, J.1    Vanhoucke, M.2
  • 12
    • 60349124753 scopus 로고    scopus 로고
    • Differential evolution for solving multi-mode resource-constrained project scheduling problems
    • N. Damak, B. Jarboui, P. Siarry, and T. Loukil Differential evolution for solving multi-mode resource-constrained project scheduling problems Computers and Operations Research 36 2009 2653 2659
    • (2009) Computers and Operations Research , vol.36 , pp. 2653-2659
    • Damak, N.1    Jarboui, B.2    Siarry, P.3    Loukil, T.4
  • 15
    • 0027666457 scopus 로고
    • Nonpreemptive multi-mode resource-constrained project scheduling
    • A. Drexl, and J. Grünewald Nonpreemptive multi-mode resource-constrained project scheduling IIE Transactions 25 1993 74 81
    • (1993) IIE Transactions , vol.25 , pp. 74-81
    • Drexl, A.1    Grünewald, J.2
  • 16
    • 75849116037 scopus 로고    scopus 로고
    • A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
    • S. Elloumi, and P. Fortemps A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem European Journal of Operational Research 205 2010 31 41
    • (2010) European Journal of Operational Research , vol.205 , pp. 31-41
    • Elloumi, S.1    Fortemps, P.2
  • 19
    • 0035612930 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A genetic algorithm
    • S. Hartmann Project scheduling with multiple modes: A genetic algorithm Annals of Operations Research 102 2001 111 135
    • (2001) Annals of Operations Research , vol.102 , pp. 111-135
    • Hartmann, S.1
  • 20
    • 0040577754 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A comparison of exact algorithms
    • S. Hartmann, and A. Drexl Project scheduling with multiple modes: A comparison of exact algorithms Networks 32 1998 283 297
    • (1998) Networks , vol.32 , pp. 283-297
    • Hartmann, S.1    Drexl, A.2
  • 21
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • S. Hartmann, and R. Kolisch Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem European Journal of Operational Research 127 2000 394 407
    • (2000) European Journal of Operational Research , vol.127 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 22
    • 36749094527 scopus 로고    scopus 로고
    • A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    • B. Jarboui, N. Damak, P. Siarry, and A. Rebai A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems Applied Mathematics and Computation 195 2008 299 308
    • (2008) Applied Mathematics and Computation , vol.195 , pp. 299-308
    • Jarboui, B.1    Damak, N.2    Siarry, P.3    Rebai, A.4
  • 27
    • 0031276875 scopus 로고    scopus 로고
    • Local search for nonpreemptive multi-mode resource-constrained project scheduling
    • R. Kolisch, and A. Drexl Local search for nonpreemptive multi-mode resource-constrained project scheduling IIE Transactions 29 1997 987 999
    • (1997) IIE Transactions , vol.29 , pp. 987-999
    • Kolisch, R.1    Drexl, A.2
  • 28
    • 84895063661 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
    • R. Kolisch, and S. Hartmann Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis European Journal of Operational Research 112 1999 3 41
    • (1999) European Journal of Operational Research , vol.112 , pp. 3-41
    • Kolisch, R.1    Hartmann, S.2
  • 29
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • R. Kolisch, and S. Hartmann Experimental investigation of heuristics for resource-constrained project scheduling: An update European Journal of Operational Research 174 2006 23 37
    • (2006) European Journal of Operational Research , vol.174 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 31
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • R. Kolisch, A. Sprecher, and A. Drexl Characterization and generation of a general class of resource-constrained project scheduling problems Management Science 41 1995 1693 1703
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 32
    • 33845522461 scopus 로고    scopus 로고
    • Multi-mode resource constrained project scheduling: Scheduling schemes, priority rules and mode selection rules
    • A. Lova, P. Tormos, and F. Barber Multi-mode resource constrained project scheduling: Scheduling schemes, priority rules and mode selection rules Inteligencia Artificial 30 2006 69 86
    • (2006) Inteligencia Artificial , vol.30 , pp. 69-86
    • Lova, A.1    Tormos, P.2    Barber, F.3
  • 33
    • 58949096631 scopus 로고    scopus 로고
    • An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
    • A. Lova, P. Tormos, M. Cervantes, and F. Barber An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes International Journal of Production Economics 117 2009 302 316
    • (2009) International Journal of Production Economics , vol.117 , pp. 302-316
    • Lova, A.1    Tormos, P.2    Cervantes, M.3    Barber, F.4
  • 34
    • 0001636411 scopus 로고
    • An experimental and comparative evaluation of production line balancing techniques
    • A. Mastor An experimental and comparative evaluation of production line balancing techniques Management Science 16 1970 728 746
    • (1970) Management Science , vol.16 , pp. 728-746
    • Mastor, A.1
  • 35
    • 0031192667 scopus 로고    scopus 로고
    • A genetic algorithm for the multi-mode resource constrained project scheduling problem
    • M. Mori, and C. Tseng A genetic algorithm for the multi-mode resource constrained project scheduling problem European Journal of Operational Research 100 1997 134 141
    • (1997) European Journal of Operational Research , vol.100 , pp. 134-141
    • Mori, M.1    Tseng, C.2
  • 36
    • 0002614325 scopus 로고    scopus 로고
    • A genetic algorithm approach to a general category project scheduling problem
    • L. Özdamar A genetic algorithm approach to a general category project scheduling problem IEEE Transactions on Systems, Management and Cybernetics 29 1999 44 59
    • (1999) IEEE Transactions on Systems, Management and Cybernetics , vol.29 , pp. 44-59
    • Özdamar, L.1
  • 37
    • 0009627197 scopus 로고
    • A local constraint based analysis approach to project scheduling under general resource constraints
    • L. Özdamar, and G. Ulusoy A local constraint based analysis approach to project scheduling under general resource constraints European Journal of Operational Research 79 1994 287 298
    • (1994) European Journal of Operational Research , vol.79 , pp. 287-298
    • Özdamar, L.1    Ulusoy, G.2
  • 39
    • 0000480311 scopus 로고
    • An algorithm for a general class of precedence and resource constrained scheduling problem
    • R. Slowinsky, J. Weglarz, Elsevier Amsterdam
    • J. Patterson, R. Slowinski, F. Talbot, and J. Weglarz An algorithm for a general class of precedence and resource constrained scheduling problem R. Slowinsky, J. Weglarz, Advances in project scheduling 1989 Elsevier Amsterdam 3 28
    • (1989) Advances in Project Scheduling , pp. 3-28
    • Patterson, J.1    Slowinski, R.2    Talbot, F.3    Weglarz, J.4
  • 40
    • 52049097838 scopus 로고    scopus 로고
    • A hybrid scatter-search for the discrete time/resource trade-off problem in project scheduling
    • M. Ranjbar, B. De Reyck, and F. Kianfar A hybrid scatter-search for the discrete time/resource trade-off problem in project scheduling European Journal of Operational Research 193 2009 35 48
    • (2009) European Journal of Operational Research , vol.193 , pp. 35-48
    • Ranjbar, M.1    De Reyck, B.2    Kianfar, F.3
  • 41
    • 0019047699 scopus 로고
    • Two approaches to problems of resource allocation among project activities - A comparative study
    • R. Slowinski Two approaches to problems of resource allocation among project activities - A comparative study Journal of Operational Research Society 8 1980 711 723
    • (1980) Journal of Operational Research Society , vol.8 , pp. 711-723
    • Slowinski, R.1
  • 42
    • 0019586862 scopus 로고
    • Multiobjective network scheduling with efficient use of renewable and non-renewable resources
    • R. Slowinski Multiobjective network scheduling with efficient use of renewable and non-renewable resources European Journal of Operational Research 7 1981 265 273
    • (1981) European Journal of Operational Research , vol.7 , pp. 265-273
    • Slowinski, R.1
  • 46
    • 0032096811 scopus 로고    scopus 로고
    • Multi-mode resource-constrained project scheduling with a simple, general and powerful sequencing algorithm
    • A. Sprecher, and A. Drexl Multi-mode resource-constrained project scheduling with a simple, general and powerful sequencing algorithm European Journal of Operational Research 107 1998 431 450
    • (1998) European Journal of Operational Research , vol.107 , pp. 431-450
    • Sprecher, A.1    Drexl, A.2
  • 47
    • 33746101954 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with multiple modes
    • A. Sprecher, S. Hartmann, and A. Drexl An exact algorithm for project scheduling with multiple modes OR Spektrum 19 1997 195 203
    • (1997) OR Spektrum , vol.19 , pp. 195-203
    • Sprecher, A.1    Hartmann, S.2    Drexl, A.3
  • 49
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling problem with time-resource trade-offs: The nonpreemptive case
    • B. Talbot Resource-constrained project scheduling problem with time-resource trade-offs: The nonpreemptive case Management Science 28 1982 1197 1210
    • (1982) Management Science , vol.28 , pp. 1197-1210
    • Talbot, B.1
  • 50
    • 0035617605 scopus 로고    scopus 로고
    • A competitive heuristic solution technique for resource-constrained project scheduling
    • P. Tormos, and A. Lova A competitive heuristic solution technique for resource-constrained project scheduling Annals of Operations Research 102 2001 65 81
    • (2001) Annals of Operations Research , vol.102 , pp. 65-81
    • Tormos, P.1    Lova, A.2
  • 51
    • 69249164131 scopus 로고    scopus 로고
    • Two-phase genetic local search algorithm for the multimode resource-constrained project scheduling problem
    • L.-Y. Tseng, and S.-C. Chen Two-phase genetic local search algorithm for the multimode resource-constrained project scheduling problem IEEE Transactions on Evolutionary Computation 13 2009 848 857
    • (2009) IEEE Transactions on Evolutionary Computation , vol.13 , pp. 848-857
    • Tseng, L.-Y.1    Chen, S.-C.2
  • 54
    • 84855502072 scopus 로고    scopus 로고
    • Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
    • doi:10.1007/s10732-010-9152-0
    • Van Peteghem, V., & Vanhoucke, M. (2011). Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem. Journal of Heuristics http://dx.doi.org/10.1007/s10732-010-9152-0.
    • (2011) Journal of Heuristics
    • Van Peteghem, V.1    Vanhoucke, M.2
  • 55
    • 70349276753 scopus 로고    scopus 로고
    • A genetic algorithm for the preemptive and non-preemtive multi-mode resource-constrained project scheduling problem
    • V. Van Peteghem, and M. Vanhoucke A genetic algorithm for the preemptive and non-preemtive multi-mode resource-constrained project scheduling problem European Journal of Operational Research 201 2010 409 418
    • (2010) European Journal of Operational Research , vol.201 , pp. 409-418
    • Van Peteghem, V.1    Vanhoucke, M.2
  • 56
    • 79958149341 scopus 로고    scopus 로고
    • An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem
    • L. Wang, and C. Fang An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem Computers & Operations Research 39 2012 449 460
    • (2012) Computers & Operations Research , vol.39 , pp. 449-460
    • Wang, L.1    Fang, C.2
  • 60
    • 33748521972 scopus 로고    scopus 로고
    • A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem
    • G. Zhu, J. Bard, and G. Tu A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem Journal on Computing 18 2006 377 390
    • (2006) Journal on Computing , vol.18 , pp. 377-390
    • Zhu, G.1    Bard, J.2    Tu, G.3