Volumn 90, Issue 2, 1996, Pages 349-361

A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes

Author keywords

Heuristics; Project scheduling; Resource allocation

Indexed keywords

GRAPH THEORY; HEURISTIC METHODS; OPTIMIZATION; PROJECT MANAGEMENT; RESOURCE ALLOCATION;

EID: 0030124780     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/0377-2217(95)00359-2     Document Type: Article
Times cited : (100)

References (14)
  • 1
    • 0027694317 scopus 로고
    • Heuristics for scheduling projects with resource restrictions and several resource-duration modes
    • Boctor, F.F. (1993), "Heuristics for scheduling projects with resource restrictions and several resource-duration modes," International Journal of Production Research 31/11, 2547-2558.
    • (1993) International Journal of Production Research , vol.31 , Issue.11 , pp. 2547-2558
    • Boctor, F.F.1
  • 2
    • 33746041346 scopus 로고
    • An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems
    • Document de travail 94-48, Faculté des Sciences de l'Administration, Université Lavai, Québec, Canada
    • Boctor, F.F. (1994), "An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems," Document de travail 94-48, Faculté des Sciences de l'Administration, Université Lavai, Québec, Canada (to appear in the International Journal of Production Research).
    • (1994) International Journal of Production Research
    • Boctor, F.F.1
  • 4
    • 0027666457 scopus 로고
    • Nonpreemptive multi-mode resource-constrained project scheduling
    • Drexl, A., and Gruenewald, J. (1993), "Nonpreemptive multi-mode resource-constrained project scheduling," IIE Transactions 25/5, 74-81.
    • (1993) IIE Transactions , vol.25 , Issue.5 , pp. 74-81
    • Drexl, A.1    Gruenewald, J.2
  • 6
    • 0000480311 scopus 로고
    • An algorithm for a general class of precedence and resource constrained scheduling problems
    • R. Slowinski and J. Weglarz (eds.), Elsevier, Amsterdam
    • Patterson, J.H., Slowinski, R., Talbot, F.B., and Weglarz, J. (1989), "An algorithm for a general class of precedence and resource constrained scheduling problems," in: R. Slowinski and J. Weglarz (eds.), Advances in Project Scheduling, Elsevier, Amsterdam, 3-27.
    • (1989) Advances in Project Scheduling , pp. 3-27
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.4
  • 7
    • 0025701909 scopus 로고
    • Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
    • Patterson, J.H., Talbot, F.B., Slowinski, R., and Weglarz, J. (1990), "Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems," European Journal of Operational Research 49/1, 68-79.
    • (1990) European Journal of Operational Research , vol.49 , Issue.1 , pp. 68-79
    • Patterson, J.H.1    Talbot, F.B.2    Slowinski, R.3    Weglarz, J.4
  • 8
    • 0019047699 scopus 로고
    • Two approaches to problems of resource allocation among project activities: A comparative study
    • Slowinski, R. (1980), "Two approaches to problems of resource allocation among project activities: a comparative study," Journal of the Operational Research Society 31/8, 711-723.
    • (1980) Journal of the Operational Research Society , vol.31 , Issue.8 , pp. 711-723
    • Slowinski, R.1
  • 9
    • 0019586862 scopus 로고
    • Multiobjective network scheduling with efficient use of renewable and non-renewable resources
    • Slowinski, R. (1981), "Multiobjective network scheduling with efficient use of renewable and non-renewable resources," European Journal of Operational Research 7/3, 265-273.
    • (1981) European Journal of Operational Research , vol.7 , Issue.3 , pp. 265-273
    • Slowinski, R.1
  • 10
    • 0043156425 scopus 로고
    • Solving the general project scheduling problem with multiple constrained resources by mathematical programming
    • Proceedings 8th IFIP Conference on Optimization Techniques, Springer-Verlag, Berlin
    • Slowinski, R., and Weglarz, J. (1978), "Solving the general project scheduling problem with multiple constrained resources by mathematical programming," Proceedings 8th IFIP Conference on Optimization Techniques, (Lecture Notes in Control and Information Sciences, Vol. 7), Springer-Verlag, Berlin, 278-289.
    • (1978) Lecture Notes in Control and Information Sciences , vol.7 , pp. 278-289
    • Slowinski, R.1    Weglarz, J.2
  • 11
    • 0027302081 scopus 로고
    • Hierarchical models for multi-project planning and scheduling
    • Speranza, M.G., and Vercellis, C. (1993), "Hierarchical models for multi-project planning and scheduling." European Journal of Operational Research 64/3, 312-325.
    • (1993) European Journal of Operational Research , vol.64 , Issue.3 , pp. 312-325
    • Speranza, M.G.1    Vercellis, C.2
  • 13
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource trade-offs: The non-preemptive case
    • Talbot, F.B. (1982), "Resource-constrained project scheduling with time-resource trade-offs: the non-preemptive case," Management Science, 28/10, 1197-1210.
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1197-1210
    • Talbot, F.B.1
  • 14
    • 0345119816 scopus 로고
    • Control in resource allocation systems
    • Weglarz, J. (1980), "Control in resource allocation systems," Foundation of Control Engineering, 5/3, 159-180.
    • (1980) Foundation of Control Engineering , vol.5 , Issue.3 , pp. 159-180
    • Weglarz, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.