-
1
-
-
0027694317
-
Heuristics for scheduling projects with resource restrictions and several resource-duration modes
-
Boctor, F.F. (1993), "Heuristics for scheduling projects with resource restrictions and several resource-duration modes," International Journal of Production Research 31/11, 2547-2558.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.11
, pp. 2547-2558
-
-
Boctor, F.F.1
-
2
-
-
33746041346
-
An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems
-
Document de travail 94-48, Faculté des Sciences de l'Administration, Université Lavai, Québec, Canada
-
Boctor, F.F. (1994), "An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems," Document de travail 94-48, Faculté des Sciences de l'Administration, Université Lavai, Québec, Canada (to appear in the International Journal of Production Research).
-
(1994)
International Journal of Production Research
-
-
Boctor, F.F.1
-
4
-
-
0027666457
-
Nonpreemptive multi-mode resource-constrained project scheduling
-
Drexl, A., and Gruenewald, J. (1993), "Nonpreemptive multi-mode resource-constrained project scheduling," IIE Transactions 25/5, 74-81.
-
(1993)
IIE Transactions
, vol.25
, Issue.5
, pp. 74-81
-
-
Drexl, A.1
Gruenewald, J.2
-
6
-
-
0000480311
-
An algorithm for a general class of precedence and resource constrained scheduling problems
-
R. Slowinski and J. Weglarz (eds.), Elsevier, Amsterdam
-
Patterson, J.H., Slowinski, R., Talbot, F.B., and Weglarz, J. (1989), "An algorithm for a general class of precedence and resource constrained scheduling problems," in: R. Slowinski and J. Weglarz (eds.), Advances in Project Scheduling, Elsevier, Amsterdam, 3-27.
-
(1989)
Advances in Project Scheduling
, pp. 3-27
-
-
Patterson, J.H.1
Slowinski, R.2
Talbot, F.B.3
Weglarz, J.4
-
7
-
-
0025701909
-
Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
-
Patterson, J.H., Talbot, F.B., Slowinski, R., and Weglarz, J. (1990), "Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems," European Journal of Operational Research 49/1, 68-79.
-
(1990)
European Journal of Operational Research
, vol.49
, Issue.1
, pp. 68-79
-
-
Patterson, J.H.1
Talbot, F.B.2
Slowinski, R.3
Weglarz, J.4
-
8
-
-
0019047699
-
Two approaches to problems of resource allocation among project activities: A comparative study
-
Slowinski, R. (1980), "Two approaches to problems of resource allocation among project activities: a comparative study," Journal of the Operational Research Society 31/8, 711-723.
-
(1980)
Journal of the Operational Research Society
, vol.31
, Issue.8
, pp. 711-723
-
-
Slowinski, R.1
-
9
-
-
0019586862
-
Multiobjective network scheduling with efficient use of renewable and non-renewable resources
-
Slowinski, R. (1981), "Multiobjective network scheduling with efficient use of renewable and non-renewable resources," European Journal of Operational Research 7/3, 265-273.
-
(1981)
European Journal of Operational Research
, vol.7
, Issue.3
, pp. 265-273
-
-
Slowinski, R.1
-
10
-
-
0043156425
-
Solving the general project scheduling problem with multiple constrained resources by mathematical programming
-
Proceedings 8th IFIP Conference on Optimization Techniques, Springer-Verlag, Berlin
-
Slowinski, R., and Weglarz, J. (1978), "Solving the general project scheduling problem with multiple constrained resources by mathematical programming," Proceedings 8th IFIP Conference on Optimization Techniques, (Lecture Notes in Control and Information Sciences, Vol. 7), Springer-Verlag, Berlin, 278-289.
-
(1978)
Lecture Notes in Control and Information Sciences
, vol.7
, pp. 278-289
-
-
Slowinski, R.1
Weglarz, J.2
-
11
-
-
0027302081
-
Hierarchical models for multi-project planning and scheduling
-
Speranza, M.G., and Vercellis, C. (1993), "Hierarchical models for multi-project planning and scheduling." European Journal of Operational Research 64/3, 312-325.
-
(1993)
European Journal of Operational Research
, vol.64
, Issue.3
, pp. 312-325
-
-
Speranza, M.G.1
Vercellis, C.2
-
12
-
-
0343866850
-
-
Manuskripte 357 aus den Instituten für Betriebswirtschaftslehre der Universität Kiel
-
Sprecher, A., Hartmann, S., and Drexl, A. (1994), "Project scheduling with discrete time-resource and resource-resource tradeoffs," Manuskripte 357 aus den Instituten für Betriebswirtschaftslehre der Universität Kiel.
-
(1994)
Project Scheduling with Discrete Time-resource and Resource-resource Tradeoffs
-
-
Sprecher, A.1
Hartmann, S.2
Drexl, A.3
-
13
-
-
0020193734
-
Resource-constrained project scheduling with time-resource trade-offs: The non-preemptive case
-
Talbot, F.B. (1982), "Resource-constrained project scheduling with time-resource trade-offs: the non-preemptive case," Management Science, 28/10, 1197-1210.
-
(1982)
Management Science
, vol.28
, Issue.10
, pp. 1197-1210
-
-
Talbot, F.B.1
-
14
-
-
0345119816
-
Control in resource allocation systems
-
Weglarz, J. (1980), "Control in resource allocation systems," Foundation of Control Engineering, 5/3, 159-180.
-
(1980)
Foundation of Control Engineering
, vol.5
, Issue.3
, pp. 159-180
-
-
Weglarz, J.1
|