An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem

Author keywords

Estimation of distribution algorithm; Multi mode resource constrained project scheduling; Permutation based local search; Probability model

Indexed keywords

BACKWARD ITERATIONS; ESTIMATION OF DISTRIBUTION ALGORITHMS; LOCAL SEARCH; LOCAL SEARCH METHOD; MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM; MULTIMODES; PARAMETER COMBINATION; PROBABILITY MODEL; PROBABILITY MODELS; SERIAL SCHEDULE GENERATION SCHEME; SIMULATION RESULT;

EID: 79958149341     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2011.05.008     Document Type: Article
Times cited : (104)

References (31)
  • 2
    • 0032096811 scopus 로고    scopus 로고
    • Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
    • PII S0377221797003482
    • A. Sprecher, and A. Drexl Solving multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm Eur J Oper Res 107 2 1998 431 450 (Pubitemid 128407555)
    • (1998) European Journal of Operational Research , vol.107 , Issue.2 , pp. 431-450
    • Sprecher, A.1    Drexl, A.2
  • 3
    • 0035612930 scopus 로고    scopus 로고
    • Project Scheduling with Multiple Modes: A Genetic Algorithm
    • DOI 10.1023/A:1010902015091
    • S. Hartmann Project scheduling with multiple modes: a genetic algorithm Ann Oper Res 102 14 2001 111 135 (Pubitemid 33634389)
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 111-135
    • Hartmann, S.1
  • 4
    • 0035612931 scopus 로고    scopus 로고
    • Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling
    • DOI 10.1023/A:1010954031930
    • J. Józefowska, M. Mika, R. Róycki, G. Waligóra, and J. Weglarz Simulated annealing for multi-mode resource-constrained project scheduling Ann Oper Res 102 14 2001 137 155 (Pubitemid 33634390)
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 137-155
    • Jozefowska, J.1    Mika, M.2    Rozycki, R.3    Waligora, G.4    Weglarz, J.5
  • 5
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for resource-constrained project scheduling problem and its multiple mode version
    • K. Bouleimen, and H. Lecocq A new efficient simulated annealing algorithm for resource-constrained project scheduling problem and its multiple mode version Eur J Oper Res 149 2 2003 268 281
    • (2003) Eur J Oper Res , vol.149 , Issue.2 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 6
    • 0038209741 scopus 로고    scopus 로고
    • Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    • J. Alcaraz, C. Maroto, and R. Ruiz Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms J Oper Res Soc 54 6 2003 614 626
    • (2003) J Oper Res Soc , vol.54 , Issue.6 , pp. 614-626
    • Alcaraz, J.1    Maroto, C.2    Ruiz, R.3
  • 7
    • 33645992444 scopus 로고    scopus 로고
    • Mulitmode project scheduling based on particle swarm optimization
    • H. Zhang, C.M. Tam, and H. Li Mulitmode project scheduling based on particle swarm optimization Comput-Aided Civil Infrastruct Eng 21 2 2006 93 103
    • (2006) Comput-Aided Civil Infrastruct Eng , vol.21 , Issue.2 , pp. 93-103
    • Zhang, H.1    Tam, C.M.2    Li, H.3
  • 8
    • 36749094527 scopus 로고    scopus 로고
    • A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    • DOI 10.1016/j.amc.2007.04.096, PII S009630030700553X
    • B. Jarboui, N. Damak, P. Siarry, and A. Rebai A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems Appl Math Comput 195 1 2008 299 308 (Pubitemid 350213083)
    • (2008) Applied Mathematics and Computation , vol.195 , Issue.1 , pp. 299-308
    • Jarboui, B.1    Damak, N.2    Siarry, P.3    Rebai, A.4
  • 9
    • 67650697102 scopus 로고    scopus 로고
    • An artificial immune system for the multi-mode resource-constrained project scheduling problem
    • EvoCOP 2009. Berlin: Springer Press
    • Van Peteghem V, Vanhoucke M. An artificial immune system for the multi-mode resource-constrained project scheduling problem. In: Proceedings of the 9th European conference, EvoCOP 2009. Berlin: Springer Press; 2009. p. 8596.
    • (2009) Proceedings of the 9th European Conference , pp. 85-96
    • Van Peteghem, V.1    Vanhoucke, M.2
  • 11
    • 60349124753 scopus 로고    scopus 로고
    • Differential evolution for solving multi-mode resource-constrained project scheduling problems
    • N. Damak, B. Jarboui, P. Siarry, and T. Loukil Differential evolution for solving multi-mode resource-constrained project scheduling problems Comput Oper Res 36 10 2009 2653 2659
    • (2009) Comput Oper Res , vol.36 , Issue.10 , pp. 2653-2659
    • Damak, N.1    Jarboui, B.2    Siarry, P.3    Loukil, T.4
  • 12
    • 75849116037 scopus 로고    scopus 로고
    • A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
    • S. Elloumi, and P. Fortemps A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem Eur J Oper Res 205 1 2010 31 41
    • (2010) Eur J Oper Res , vol.205 , Issue.1 , pp. 31-41
    • Elloumi, S.1    Fortemps, P.2
  • 13
    • 52049097838 scopus 로고    scopus 로고
    • A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
    • M. Ranjbar, B. Reyck, and F. De, Kianfar A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling Eur J Oper Res 193 1 2009 35 48
    • (2009) Eur J Oper Res , vol.193 , Issue.1 , pp. 35-48
    • Ranjbar, M.1    Reyck, B.2    De Kianfar, F.3
  • 14
    • 69249164131 scopus 로고    scopus 로고
    • Two-phase genetic local search algorithm for the multimode resource-constrained project scheduling problem
    • L.Y. Tseng, and S.C. Chen Two-phase genetic local search algorithm for the multimode resource-constrained project scheduling problem IEEE Trans Evol Comput 13 4 2009 848 857
    • (2009) IEEE Trans Evol Comput , vol.13 , Issue.4 , pp. 848-857
    • Tseng, L.Y.1    Chen, S.C.2
  • 15
    • 58949096631 scopus 로고    scopus 로고
    • An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
    • A. Lova, P. Tormos, M. Cervantes, and F. Barber An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes Int J Prod Econ 117 2 2009 302 316
    • (2009) Int J Prod Econ , vol.117 , Issue.2 , pp. 302-316
    • Lova, A.1    Tormos, P.2    Cervantes, M.3    Barber, F.4
  • 16
    • 70349276753 scopus 로고    scopus 로고
    • A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
    • V. Van Peteghem, and M. Vanhoucke A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems Eur J Oper Res 201 2 2010 409 418
    • (2010) Eur J Oper Res , vol.201 , Issue.2 , pp. 409-418
    • Van Peteghem, V.1    Vanhoucke, M.2
  • 18
    • 2942594395 scopus 로고    scopus 로고
    • Fast feature selection using a simple estimation of distribution algorithm: A case study on splice site prediction
    • Y. Saeys, S. Degroeve, D. Aeyels, Y. Van de Peer, and P. Rouze Fast feature selection using a simple estimation of distribution algorithm: a case study on splice site prediction Bioinformatics 19 2 2003 179 188
    • (2003) Bioinformatics , vol.19 , Issue.2 , pp. 179-188
    • Saeys, Y.1    Degroeve, S.2    Aeyels, D.3    Van De Peer, Y.4    Rouze, P.5
  • 19
    • 60349125187 scopus 로고    scopus 로고
    • An estimation of distribution algorithm for minimizing the total flowtime in permutation flowshop scheduling problems
    • B. Jarboui, M. Eddaly, and P. Siarry An estimation of distribution algorithm for minimizing the total flowtime in permutation flowshop scheduling problems Comput Oper Res 36 10 2009 2638 2646
    • (2009) Comput Oper Res , vol.36 , Issue.10 , pp. 2638-2646
    • Jarboui, B.1    Eddaly, M.2    Siarry, P.3
  • 20
    • 35548991809 scopus 로고    scopus 로고
    • An estimation of distribution algorithm with intelligent local search for rule-based nurse rostering
    • DOI 10.1057/palgrave.jors.2602308, PII 2602308
    • U. Aickelin, E.K. Burke, and J. Li An estimation of distribution algorithm with intelligent local search for rule-based nurse rostering J Oper Res Soc 58 13 2007 1574 1585 (Pubitemid 350129146)
    • (2007) Journal of the Operational Research Society , vol.58 , Issue.12 , pp. 1574-1585
    • Aickelin, U.1    Burke, E.K.2    Li, J.3
  • 22
    • 33645766234 scopus 로고    scopus 로고
    • Teeth-number synthesis of a multispeed planetary transmission using an estimation of distribution algorithm
    • P.A. Simionescu, D.G. Beale, and G.V. Dozier Teeth-number synthesis of a multispeed planetary transmission using an estimation of distribution algorithm J Mech Des 128 1 2006 108 115
    • (2006) J Mech des , vol.128 , Issue.1 , pp. 108-115
    • Simionescu, P.A.1    Beale, D.G.2    Dozier, G.V.3
  • 23
    • 24044527129 scopus 로고    scopus 로고
    • Inexact graph matching for model-based recognition: Evaluation and comparison of optimization algorithms
    • DOI 10.1016/j.patcog.2005.05.007, PII S0031320305002177
    • R.M. Cesar Jr., E. Bengoetxea, I. Bloch, and P. Larranaga Inexact graph matching for model-based recognition: Evaluation and comparison of optimization algorithms Pattern Recognition 38 12 2005 2099 2113 (Pubitemid 41214647)
    • (2005) Pattern Recognition , vol.38 , Issue.11 , pp. 2099-2113
    • Cesar Jr., R.M.1    Bengoetxea, E.2    Bloch, I.3    Larranaga, P.4
  • 24
    • 17844361963 scopus 로고    scopus 로고
    • On the performance of estimation of distribution algorithms applied to software testing
    • DOI 10.1080/08839510590917861
    • R. Sagarna, and J. Lozano On the performance of estimation of distribution algorithms applied to software testing Appl Artif Intell 19 5 2005 457 489 (Pubitemid 40584358)
    • (2005) Applied Artificial Intelligence , vol.19 , Issue.5 , pp. 457-489
    • Sagarna, R.1    Lozano, J.A.2
  • 25
    • 33746101954 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with multiple modes
    • A. Sprecher, S. Hartmann, and A. Drexl An exact algorithm for project scheduling with multiple modes OR Spektrum 19 3 1997 195 203
    • (1997) OR Spektrum , vol.19 , Issue.3 , pp. 195-203
    • Sprecher, A.1    Hartmann, S.2    Drexl, A.3
  • 26
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification, computational, analysis
    • R. Kolisch, and S. Hartmann Heuristic algorithms for solving the resource-constrained project scheduling problem: classification, computational, analysis J. Weglarz, Project scheduling: recent models, algorithms and applications 1999 Kluwer Press Berlin 147 178
    • (1999) Project Scheduling: Recent Models, Algorithms and Applications , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 27
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • R. Kolisch Serial and parallel resource-constrained project scheduling methods revisited: theory and computation Eur J Oper Res 90 2 1996 320 333 (Pubitemid 126652217)
    • (1996) European Journal of Operational Research , vol.90 , Issue.2 , pp. 320-333
    • Kolisch, R.1
  • 29
    • 0026822242 scopus 로고
    • An iterative scheduling technique for resource constrained project scheduling
    • K.Y. Li, and R.J. Willis An iterative scheduling technique for resource constrained project scheduling Eur J Oper Res 56 3 1992 370 379
    • (1992) Eur J Oper Res , vol.56 , Issue.3 , pp. 370-379
    • Li, K.Y.1    Willis, R.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.