메뉴 건너뛰기




Volumn 52, Issue 4, 2014, Pages 1215-1230

Implementing finite capacity production scheduling: Lessons from a practical case

Author keywords

action research; finite capacity systems; motorcycle industry; production scheduling; simulation

Indexed keywords

ACTION RESEARCH; FINITE CAPACITY; MOTORCYCLE INDUSTRY; PRODUCTION SCHEDULING; SIMULATION;

EID: 84892941603     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.848484     Document Type: Article
Times cited : (33)

References (42)
  • 1
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug, H., M. Lawley, K. McKay, S. Mohan, and, R. Uzsoy. 2005. " Executing Production Schedules in the Face of Uncertainties: A Review and Some Future Directions." European Journal of Operational Research 161: 86-110.
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 2
    • 34548512819 scopus 로고    scopus 로고
    • Human, technological and organizational aspects influencing the production scheduling process
    • Berglund, M., and, J. Karltun. 2007. " Human, Technological and Organizational Aspects Influencing the Production Scheduling Process." International Journal of Production Economics 110: 160-174.
    • (2007) International Journal of Production Economics , vol.110 , pp. 160-174
    • Berglund, M.1    Karltun, J.2
  • 3
    • 33847267256 scopus 로고    scopus 로고
    • A mixed integer programming model for advanced planning and scheduling (aps)
    • Chen, K., and, P. Ji. 2007. " A Mixed Integer Programming Model for Advanced Planning and Scheduling (APS)." European Journal of Operational Research 181: 515-522.
    • (2007) European Journal of Operational Research , vol.181 , pp. 515-522
    • Chen, K.1    Ji, P.2
  • 6
    • 0038789162 scopus 로고    scopus 로고
    • A flexible decision support system for steel hot rolling mill scheduling
    • Cowling, P. 2003. " A Flexible Decision Support System for Steel Hot Rolling Mill Scheduling." Computers and Industrial Engineering 45: 307-321.
    • (2003) Computers and Industrial Engineering , vol.45 , pp. 307-321
    • Cowling, P.1
  • 7
    • 0036604832 scopus 로고    scopus 로고
    • Using real time information for effective dynamic scheduling
    • Cowling, P., and, M. Johansson. 2002. " Using Real Time Information for Effective Dynamic Scheduling." European Journal of Operational Research 139: 230-244.
    • (2002) European Journal of Operational Research , vol.139 , pp. 230-244
    • Cowling, P.1    Johansson, M.2
  • 9
    • 79951584419 scopus 로고    scopus 로고
    • An empirical investigation of scheduling performance criteria
    • De Snoo, C., W. Wezel, and, R. Jorna. 2011. " An Empirical Investigation of Scheduling Performance Criteria." Journal of Operations Management 29: 181-193.
    • (2011) Journal of Operations Management , vol.29 , pp. 181-193
    • De Snoo, C.1    Wezel, W.2    Jorna, R.3
  • 10
    • 79551550042 scopus 로고    scopus 로고
    • Coordination activities of human planners during rescheduling: Case analysis and event handling procedure
    • De Snoo, C., W. Wezel, J. C. Wortmann, and, G. J. C. Gaalman. 2011. " Coordination Activities of Human Planners During Rescheduling: Case Analysis and Event Handling Procedure." International Journal of Production Research 49 (7): 2101-2122.
    • (2011) International Journal of Production Research , vol.49 , Issue.7 , pp. 2101-2122
    • De Snoo, C.1    Wezel, W.2    Wortmann, J.C.3    Gaalman, G.J.C.4
  • 12
    • 84868705161 scopus 로고    scopus 로고
    • Scheduling policies in multi-product manufacturing systems with sequence-dependent setup times and finite buffers
    • Feng, W., L. Zheng, and, J. Li. 2012. " Scheduling Policies in Multi-product Manufacturing Systems with Sequence-dependent Setup Times and Finite Buffers." International Journal of Production Research 50 (24): 7479-7492.
    • (2012) International Journal of Production Research , vol.50 , Issue.24 , pp. 7479-7492
    • Feng, W.1    Zheng, L.2    Li, J.3
  • 13
    • 76949109331 scopus 로고    scopus 로고
    • Architecture of manufacturing scheduling systems: Literature review and an integrated proposal
    • Framinan, J., and, R. Ruiz. 2010. " Architecture of Manufacturing Scheduling Systems: Literature Review and an Integrated Proposal." European Journal of Operational Research 205: 237-246.
    • (2010) European Journal of Operational Research , vol.205 , pp. 237-246
    • Framinan, J.1    Ruiz, R.2
  • 14
    • 84861413180 scopus 로고    scopus 로고
    • Guidelines for the deployment and implementation of manufacturing scheduling systems
    • Framinan, J., and, R. Ruiz. 2012. " Guidelines for the Deployment and Implementation of Manufacturing Scheduling Systems." International Journal of Production Research 50 (7): 1799-1812.
    • (2012) International Journal of Production Research , vol.50 , Issue.7 , pp. 1799-1812
    • Framinan, J.1    Ruiz, R.2
  • 15
    • 33751227798 scopus 로고    scopus 로고
    • Action variety of planners: Cognitive load and requisite variety
    • Fransoo, J., and, V. Wiers. 2006. " Action Variety of Planners: Cognitive Load and Requisite Variety." Journal of Operations Management 24: 813-821.
    • (2006) Journal of Operations Management , vol.24 , pp. 813-821
    • Fransoo, J.1    Wiers, V.2
  • 16
    • 79955656034 scopus 로고    scopus 로고
    • A simulation-based scheduling system for real-time optimization and decision making support
    • Frantzén, M., A. Ng, and, P. Moore. 2011. " A Simulation-based Scheduling System for Real-time Optimization and Decision making Support." Robotics and Computer-Integrated Manufacturing 27: 696-705.
    • (2011) Robotics and Computer-Integrated Manufacturing , vol.27 , pp. 696-705
    • Frantzén, M.1    Ng, A.2    Moore, P.3
  • 18
    • 0034306985 scopus 로고    scopus 로고
    • Knowledge-based predictive and reactive scheduling in industrial environments
    • Henning, G., and, J. Cerdá. 2000. " Knowledge-based Predictive and Reactive Scheduling in Industrial Environments." Computers and Chemical Engineering 24: 2315-2338.
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 2315-2338
    • Henning, G.1    Cerdá, J.2
  • 19
    • 4944229552 scopus 로고    scopus 로고
    • A new model of scheduling in manufacturing: Tasks, roles, and monitoring
    • Jackson, S., J. Wilson, and, B. MacCarthy. 2004. " A New Model of Scheduling in Manufacturing: Tasks, Roles, and Monitoring." Human Factors 46 (3): 533-550.
    • (2004) Human Factors , vol.46 , Issue.3 , pp. 533-550
    • Jackson, S.1    Wilson, J.2    Maccarthy, B.3
  • 21
    • 77952615049 scopus 로고    scopus 로고
    • Scheduling a dynamic flexible flow line with sequence-dependent setup times: A simulation analysis
    • Kia, H. R., H. Davoudpour, and, M. Zandieh. 2010. " Scheduling a Dynamic Flexible Flow Line with Sequence-dependent Setup Times: A Simulation Analysis." International Journal of Production Research 48 (14): 4019-4042.
    • (2010) International Journal of Production Research , vol.48 , Issue.14 , pp. 4019-4042
    • Kia, H.R.1    Davoudpour, H.2    Zandieh, M.3
  • 22
    • 0035929278 scopus 로고    scopus 로고
    • Extended model for a hybrid production planning approach
    • Kim, B., and, S. Kim. 2001. " Extended Model for a Hybrid Production Planning Approach." International Journal of Production Economics 73: 165-173.
    • (2001) International Journal of Production Economics , vol.73 , pp. 165-173
    • Kim, B.1    Kim, S.2
  • 23
    • 68949210462 scopus 로고    scopus 로고
    • Simulation-based optimization vs mathematical programming: A hybrid approach for optimizing scheduling problems
    • Klemmt, A., S. Horn, G. Weigert, and, K. Wolter. 2009. " Simulation-based Optimization vs. Mathematical Programming: A Hybrid Approach for Optimizing Scheduling Problems." Robotics and Computer-Integrated Manufacturing 25: 917-925.
    • (2009) Robotics and Computer-Integrated Manufacturing , vol.25 , pp. 917-925
    • Klemmt, A.1    Horn, S.2    Weigert, G.3    Wolter, K.4
  • 24
    • 0009058973 scopus 로고    scopus 로고
    • Computer-based scheduling in manufacturing firms: Some indicators of successful practice
    • LaForge, R., and, C. Craighead. 2000. " Computer-based Scheduling in Manufacturing Firms: Some Indicators of Successful Practice." Production and Inventory Management Journal of Production 41 (1): 29-34.
    • (2000) Production and Inventory Management Journal of Production , vol.41 , Issue.1 , pp. 29-34
    • Laforge, R.1    Craighead, C.2
  • 25
    • 77950859807 scopus 로고    scopus 로고
    • A real-time hybrid information-sharing and decision support system for the mould industry
    • Leung, Y., K. Choy, and, C. Kwong. 2010. " A Real-time Hybrid Information-sharing and Decision Support System for the Mould Industry." Journal of High Technology Management Research 21: 64-77.
    • (2010) Journal of High Technology Management Research , vol.21 , pp. 64-77
    • Leung, Y.1    Choy, K.2    Kwong, C.3
  • 26
    • 70249093672 scopus 로고    scopus 로고
    • Integration of production planning and scheduling: Overview, challenges and opportunities
    • Maravelias, C., and, C. Sung. 2009. " Integration of Production Planning and Scheduling: Overview, Challenges and Opportunities." Computers and Chemical Engineering 33: 1919-1930.
    • (2009) Computers and Chemical Engineering , vol.33 , pp. 1919-1930
    • Maravelias, C.1    Sung, C.2
  • 27
    • 27844556391 scopus 로고    scopus 로고
    • Finite capacity scheduling-packed placement sequence schedule
    • Martin, R., and, C. White. 2005. " Finite Capacity Scheduling-Packed Placement Sequence Schedule." International Journal of Production Research 43 (2): 405-446.
    • (2005) International Journal of Production Research , vol.43 , Issue.2 , pp. 405-446
    • Martin, R.1    White, C.2
  • 28
    • 0033746932 scopus 로고    scopus 로고
    • The application of computerized production control systems in job shop environments
    • McKay, K., and, J. Buzacott. 2000. " The Application of Computerized Production Control Systems in Job Shop Environments." Computers in Industry 42: 79-97.
    • (2000) Computers in Industry , vol.42 , pp. 79-97
    • McKay, K.1    Buzacott, J.2
  • 29
    • 0001008727 scopus 로고    scopus 로고
    • Unifying the theory and practice of production scheduling
    • McKay, K., and, V. Wiers. 1999. " Unifying the Theory and Practice of Production Scheduling." Journal of Manufacturing Systems 18 (4): 241-255.
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.4 , pp. 241-255
    • McKay, K.1    Wiers, V.2
  • 32
    • 69749098025 scopus 로고    scopus 로고
    • Algorithms for a realistic variant of flowshop scheduling
    • Naderi, B., R. Ruiz, and, M. Zandieh. 2010. " Algorithms for a Realistic Variant of Flowshop Scheduling." Computers and Operations Research 37: 236-246.
    • (2010) Computers and Operations Research , vol.37 , pp. 236-246
    • Naderi, B.1    Ruiz, R.2    Zandieh, M.3
  • 33
    • 77957790861 scopus 로고    scopus 로고
    • Learning effective new single machine dispatching rules from optimal scheduling data
    • Olafsson, S., and, X. Li. 2010. " Learning Effective New Single Machine Dispatching Rules from Optimal Scheduling Data." International Journal of Production Economics 128: 118-126.
    • (2010) International Journal of Production Economics , vol.128 , pp. 118-126
    • Olafsson, S.1    Li, X.2
  • 34
    • 72449178613 scopus 로고    scopus 로고
    • Simulation modeling and analysis for production scheduling using real-time dispatching rules: A case study in canned fruit industry
    • Parthanadee, P., and, J. Buddhakulsomsiri. 2010. " Simulation Modeling and Analysis for Production Scheduling using Real-Time Dispatching Rules: A Case Study in Canned Fruit Industry." Computers and Electronics in Agriculture 70: 245-255.
    • (2010) Computers and Electronics in Agriculture , vol.70 , pp. 245-255
    • Parthanadee, P.1    Buddhakulsomsiri, J.2
  • 36
    • 0141636312 scopus 로고    scopus 로고
    • The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure
    • Pongcharoen, P., C. Hicks, and, P. Braiden. 2004. " The Development of Genetic Algorithms for the Finite Capacity Scheduling of Complex Products, with Multiple Levels of Product Structure." European Journal of Operational Research 152: 215-225.
    • (2004) European Journal of Operational Research , vol.152 , pp. 215-225
    • Pongcharoen, P.1    Hicks, C.2    Braiden, P.3
  • 37
    • 78650699442 scopus 로고    scopus 로고
    • FMS scheduling with knowledge based genetic algorithm approach
    • Prakash, A., F. Chan, and, S. Deshmukh. 2011. " FMS Scheduling with Knowledge Based Genetic Algorithm Approach." Expert Systems with Applications 38: 3161-3171.
    • (2011) Expert Systems with Applications , vol.38 , pp. 3161-3171
    • Prakash, A.1    Chan, F.2    Deshmukh, S.3
  • 38
    • 34249328859 scopus 로고    scopus 로고
    • Scheduling: New trends in industrial environment
    • Proth, J.-M. 2007. " Scheduling: New trends in Industrial Environment." Annual Reviews in Control 31: 157-166.
    • (2007) Annual Reviews in Control , vol.31 , pp. 157-166
    • Proth, J.-M.1
  • 39
    • 37849186110 scopus 로고    scopus 로고
    • Batch scheduling of jobs with identical process times on flexible flow lines
    • Quadt, D., and, H. Kuhn. 2007. " Batch Scheduling of Jobs with Identical Process Times on Flexible Flow Lines." International Journal of Production Economics 105: 385-401.
    • (2007) International Journal of Production Economics , vol.105 , pp. 385-401
    • Quadt, D.1    Kuhn, H.2
  • 40
    • 0037082299 scopus 로고    scopus 로고
    • Planning, scheduling and control systems: Why cannot they work together
    • Shobrys, D., and, D. White. 2002. " Planning, Scheduling and Control Systems: Why Cannot They Work Together." Computers and Chemical Engineering 26: 149-160.
    • (2002) Computers and Chemical Engineering , vol.26 , pp. 149-160
    • Shobrys, D.1    White, D.2
  • 41
    • 34249948810 scopus 로고    scopus 로고
    • Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative case study
    • Soman, C., D. Donk, and, G. Gaalman. 2007. " Capacitated Planning and Scheduling for Combined Make-to-order and Make-to-stock Production in the Food Industry: An Illustrative Case Study." International Journal of Production Economics 108: 191-199.
    • (2007) International Journal of Production Economics , vol.108 , pp. 191-199
    • Soman, C.1    Donk, D.2    Gaalman, G.3
  • 42
    • 0010651201 scopus 로고
    • A candle to saint jude, or four real world applications of integer programming
    • Wolsey, R. 1972. " A Candle to Saint Jude, or Four Real World Applications of Integer Programming." Interfaces 2: 20-27.
    • (1972) Interfaces , vol.2 , pp. 20-27
    • Wolsey, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.