메뉴 건너뛰기




Volumn 205, Issue 2, 2010, Pages 237-246

Architecture of manufacturing scheduling systems: Literature review and an integrated proposal

Author keywords

Architecture; Functional requirements; Scheduling systems

Indexed keywords

BUILDING BLOCKES; DESIGN AND DEVELOPMENT; EFFICIENT DESIGNS; FUNCTIONAL REQUIREMENT; KEY ELEMENTS; LITERATURE REVIEWS; MANUFACTURING SCHEDULING; MODULAR ARCHITECTURES; OBJECT ORIENTED; SCHEDULING SYSTEMS;

EID: 76949109331     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2009.09.026     Document Type: Review
Times cited : (63)

References (56)
  • 2
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug H., Lawley M., McKay K., Mohan S., and Uzsoy R. Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research 161 1 (2005) 86-110
    • (2005) European Journal of Operational Research , vol.161 , Issue.1 , pp. 86-110
    • Aytug, H.1    Lawley, M.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 5
    • 76949108489 scopus 로고    scopus 로고
    • BPMG.org, 2004. Business Process Modeling Tools. .
    • BPMG.org, 2004. Business Process Modeling Tools. .
  • 6
    • 0034288107 scopus 로고    scopus 로고
    • Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure
    • Brandimarte P., Rigodanza M., and Roero L. Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure. IIE Transactions 32 10 (2000) 921-929
    • (2000) IIE Transactions , vol.32 , Issue.10 , pp. 921-929
    • Brandimarte, P.1    Rigodanza, M.2    Roero, L.3
  • 11
    • 0025420943 scopus 로고
    • Constraint guided scheduling: A short history of research at CMU
    • Fox M.S. Constraint guided scheduling: A short history of research at CMU. Computers in Industry 14 1-3 (1990) 79-88
    • (1990) Computers in Industry , vol.14 , Issue.1-3 , pp. 79-88
    • Fox, M.S.1
  • 12
    • 0003768868 scopus 로고
    • Intelligent Scheduling
    • Chapter ISIS:, Morgan Kaufmann, pp
    • Fox, M.S., 1994. Intelligent Scheduling, Chapter ISIS: A Retrospective. Morgan Kaufmann, pp. 3-28.
    • (1994) A Retrospective , pp. 3-28
    • Fox, M.S.1
  • 13
    • 0019585243 scopus 로고
    • A review of production scheduling
    • Graves S.C. A review of production scheduling. Operations Research 29 4 (1981) 646-675
    • (1981) Operations Research , vol.29 , Issue.4 , pp. 646-675
    • Graves, S.C.1
  • 14
  • 15
    • 0025004840 scopus 로고
    • ReDS - A dynamic planning, scheduling, and control system for manufacturing
    • Hadavi K., Shahraray M., and Voigt K. ReDS - A dynamic planning, scheduling, and control system for manufacturing. Journal of Manufacturing Systems 9 4 (1990) 332-344
    • (1990) Journal of Manufacturing Systems , vol.9 , Issue.4 , pp. 332-344
    • Hadavi, K.1    Shahraray, M.2    Voigt, K.3
  • 18
    • 79251627866 scopus 로고
    • A progressive approach for the integration of process planning and scheduling
    • Huang S.H., Zhang H.-C., and Smith M.L. A progressive approach for the integration of process planning and scheduling. IIE Transactions 27 4 (1995) :456-464
    • (1995) IIE Transactions , vol.27 , Issue.4
    • Huang, S.H.1    Zhang, H.-C.2    Smith, M.L.3
  • 28
    • 0027146758 scopus 로고
    • Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
    • MacCarthy B.L., and Liu J. Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling. International Journal of Production Research 31 1 (1993) 59-79
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 59-79
    • MacCarthy, B.L.1    Liu, J.2
  • 29
    • 0031101538 scopus 로고    scopus 로고
    • Object-oriented job-shop scheduling using genetic algorithms
    • Maturana F., Gu P., Naumann A., and Norrie D.H. Object-oriented job-shop scheduling using genetic algorithms. Computers in Industry 32 3 (1997) 281-294
    • (1997) Computers in Industry , vol.32 , Issue.3 , pp. 281-294
    • Maturana, F.1    Gu, P.2    Naumann, A.3    Norrie, D.H.4
  • 30
    • 0033746932 scopus 로고    scopus 로고
    • Application of computerized production control systems in job shop environments
    • McKay K., and Buzacott J. Application of computerized production control systems in job shop environments. Computers in Industry 42 2 (2000) 79-97
    • (2000) Computers in Industry , vol.42 , Issue.2 , pp. 79-97
    • McKay, K.1    Buzacott, J.2
  • 31
    • 0037238427 scopus 로고    scopus 로고
    • Integrated decision support for planning, scheduling, and dispatching tasks in a focused factory
    • McKay K., and Wiers V. Integrated decision support for planning, scheduling, and dispatching tasks in a focused factory. Computers in Industry 50 1 (2003) 5-14
    • (2003) Computers in Industry , vol.50 , Issue.1 , pp. 5-14
    • McKay, K.1    Wiers, V.2
  • 33
    • 0002748923 scopus 로고
    • Job-shop scheduling theory: What is relevant?
    • McKay K.N., Safayeni F.R., and Buzacott J.A. Job-shop scheduling theory: What is relevant?. Interfaces 4 18 (1988) :84-90
    • (1988) Interfaces , vol.4 , Issue.18
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 34
    • 0029323355 scopus 로고
    • Common sense realities of planning and scheduling in printed circuit board production
    • McKay K.N., Safayeni F.R., and Buzacott J.A. Common sense realities of planning and scheduling in printed circuit board production. International Journal of Production Research 33 6 (1995) 1587-1603
    • (1995) International Journal of Production Research , vol.33 , Issue.6 , pp. 1587-1603
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 35
    • 0001008727 scopus 로고    scopus 로고
    • Unifying the theory and practice of production scheduling
    • McKay K.N., and Wiers V.C.S. Unifying the theory and practice of production scheduling. Journal of Manufacturing Systems 18 4 (1999) 241-255
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.4 , pp. 241-255
    • McKay, K.N.1    Wiers, V.C.S.2
  • 37
    • 0011717155 scopus 로고
    • Operations research techniques in manufacturing planning and control systems
    • Olhager J., and Rapp B. Operations research techniques in manufacturing planning and control systems. International Transactions in Operational Research 2 1 (1995) 29-43
    • (1995) International Transactions in Operational Research , vol.2 , Issue.1 , pp. 29-43
    • Olhager, J.1    Rapp, B.2
  • 40
    • 0031483922 scopus 로고    scopus 로고
    • On the design and development of object-oriented scheduling systems
    • Pinedo M.L., and Yen B.P.-C. On the design and development of object-oriented scheduling systems. Annals of Operations Research 70 1 (1997) 359-378
    • (1997) Annals of Operations Research , vol.70 , Issue.1 , pp. 359-378
    • Pinedo, M.L.1    Yen, B.P.-C.2
  • 43
    • 0031212608 scopus 로고    scopus 로고
    • Flowshop scheduling/sequencing research: A statistical review of the literature, 1952-1994
    • Reisman A., Kumar A., and Motwani J. Flowshop scheduling/sequencing research: A statistical review of the literature, 1952-1994. IEEE Transactions on Engineering Management 44 3 (1997) 316-329
    • (1997) IEEE Transactions on Engineering Management , vol.44 , Issue.3 , pp. 316-329
    • Reisman, A.1    Kumar, A.2    Motwani, J.3
  • 44
    • 0032183946 scopus 로고    scopus 로고
    • Decision support systems generator for industrial companies module iii: Scheduling support system
    • Rossi P., Diaz C., Fruttero P., Vittori C., Rico M., and Chiotti O. Decision support systems generator for industrial companies module iii: Scheduling support system. Computers & Industrial Engineering 35 1-2 (1998) 311-314
    • (1998) Computers & Industrial Engineering , vol.35 , Issue.1-2 , pp. 311-314
    • Rossi, P.1    Diaz, C.2    Fruttero, P.3    Vittori, C.4    Rico, M.5    Chiotti, O.6
  • 45
    • 0041401718 scopus 로고
    • Meta-scheduling using dynamic scheduling knowledge
    • Dorn J., and Froeschl K. (Eds), Ellis Horwood, Upper Saddle River, NJ
    • Sauer J. Meta-scheduling using dynamic scheduling knowledge. In: Dorn J., and Froeschl K. (Eds). Scheduling of Production Processes (1993), Ellis Horwood, Upper Saddle River, NJ 151-162
    • (1993) Scheduling of Production Processes , pp. 151-162
    • Sauer, J.1
  • 46
    • 84929588692 scopus 로고    scopus 로고
    • Knowledge-based design of scheduling systems
    • Nahavandi, S, Saadat, M, Eds, International Symposium on Manufacturing Systems, Auckland
    • Sauer, J., Apelrath, H.-J., 1997. Knowledge-based design of scheduling systems. In: Nahavandi, S., Saadat, M. (Eds.), Proceedings of WMC97 International Symposium on Manufacturing Systems, Auckland.
    • (1997) Proceedings of WMC97
    • Sauer, J.1    Apelrath, H.-J.2
  • 47
    • 0030737170 scopus 로고    scopus 로고
    • Knowledge-based scheduling systems in industry and medicine
    • Sauer J., and Bruns R. Knowledge-based scheduling systems in industry and medicine. IEEE Expert (1997) 24-31
    • (1997) IEEE Expert , pp. 24-31
    • Sauer, J.1    Bruns, R.2
  • 48
    • 76949103732 scopus 로고
    • Intelligent Scheduling
    • Chapter OPIS:, Morgan Kaufmann, pp
    • Smith, S., 1994. Intelligent Scheduling, Chapter OPIS: A Methodology and Architecture. Morgan Kaufmann, pp. 29-66.
    • (1994) A Methodology and Architecture , pp. 29-66
    • Smith, S.1
  • 52
    • 0032169227 scopus 로고    scopus 로고
    • Integration of the human operator into responsive discrete production management systems
    • Trentesaux D., Moray N., and Tahon C. Integration of the human operator into responsive discrete production management systems. European Journal of Operational Research 109 2 (1998) 342-361
    • (1998) European Journal of Operational Research , vol.109 , Issue.2 , pp. 342-361
    • Trentesaux, D.1    Moray, N.2    Tahon, C.3
  • 54
    • 11244258918 scopus 로고    scopus 로고
    • Scheduling Description Languages
    • Technical Report, Department of Industrial Engineering and Engineering Management, Hong Kong University of Science and Technology, Hong Kong
    • Yen, B.P.-C., 1997. Scheduling Description Languages. Technical Report, Department of Industrial Engineering and Engineering Management, Hong Kong University of Science and Technology, Hong Kong.
    • (1997)
    • Yen, B.P.-C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.