메뉴 건너뛰기




Volumn 31, Issue 1, 2007, Pages 157-166

Scheduling: New trends in industrial environment

Author keywords

Industrial production systems; Optimization problems; Real time decision; Scheduling

Indexed keywords

DECISION MAKING; INVENTORY CONTROL; OPTIMIZATION; PRODUCTION ENGINEERING; REAL TIME CONTROL; SCHEDULING;

EID: 34249328859     PISSN: 13675788     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.arcontrol.2007.03.005     Document Type: Article
Times cited : (28)

References (28)
  • 1
    • 0026882102 scopus 로고
    • General schedulers for the pinwheel problem based on double integer reduction
    • Chan M.Y., and Chin L. General schedulers for the pinwheel problem based on double integer reduction. IEEE Transactions on Computers 41 6 (1992) 755-768
    • (1992) IEEE Transactions on Computers , vol.41 , Issue.6 , pp. 755-768
    • Chan, M.Y.1    Chin, L.2
  • 4
    • 34249325637 scopus 로고    scopus 로고
    • Chrétienne, Ph. (1983). Les réseaux de Pétri Temporisés. Université de Paris VI. Thèse d'Etat.
  • 5
    • 0036604832 scopus 로고    scopus 로고
    • Using real time information for effective dynamic scheduling
    • Cowling P.I., and Johansson M. Using real time information for effective dynamic scheduling. European Journal of Operational Research 139 2 (2002) 230-244
    • (2002) European Journal of Operational Research , vol.139 , Issue.2 , pp. 230-244
    • Cowling, P.I.1    Johansson, M.2
  • 6
    • 34249317742 scopus 로고    scopus 로고
    • Dolgui, A. & Proth J.-M., (2006). Les systèmes de production modernes. Volume 1: conception, gestion et optimisation. Volume 2: outils et corrigés des exercices. Hermès Science. Lavoisier.
  • 10
    • 34249973653 scopus 로고
    • A survey of priority rule based dispatching
    • Haupt R. A survey of priority rule based dispatching. OR Spectrum 11 (1989) 3-16
    • (1989) OR Spectrum , vol.11 , pp. 3-16
    • Haupt, R.1
  • 11
    • 0024479894 scopus 로고
    • Performance evaluation of job-shop systems using timed event graphs
    • Hillion H.P., and Proth J.-M. Performance evaluation of job-shop systems using timed event graphs. IEEE Transaction on Automatic Control 34 1 (1989) 3-9
    • (1989) IEEE Transaction on Automatic Control , vol.34 , Issue.1 , pp. 3-9
    • Hillion, H.P.1    Proth, J.-M.2
  • 12
    • 0032668814 scopus 로고    scopus 로고
    • Scheduling in job-shops with machine breakdowns: And experimental study
    • Holthaus O. Scheduling in job-shops with machine breakdowns: And experimental study. Computers & Industrial Engineering 36 1 (1999) 137-162
    • (1999) Computers & Industrial Engineering , vol.36 , Issue.1 , pp. 137-162
    • Holthaus, O.1
  • 13
    • 2042474752 scopus 로고    scopus 로고
    • Development and analysis of cost based dispatching rules for job shop scheduling
    • Jayamohan M.S., and Rajendran C. Development and analysis of cost based dispatching rules for job shop scheduling. European Journal of Operational Research 157 (2004) 307-321
    • (2004) European Journal of Operational Research , vol.157 , pp. 307-321
    • Jayamohan, M.S.1    Rajendran, C.2
  • 15
    • 0031108822 scopus 로고    scopus 로고
    • Information distortion in a supply chain: The bullwhip effect
    • Lee H.L., Padmanabhan V., and Whang S. Information distortion in a supply chain: The bullwhip effect. Management Science 43 (1997) 546-558
    • (1997) Management Science , vol.43 , pp. 546-558
    • Lee, H.L.1    Padmanabhan, V.2    Whang, S.3
  • 16
    • 0027146758 scopus 로고
    • Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
    • Maccarthy B.L., and Liu J. Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling. International Journal of Production Research 31 1 (1993) 59-79
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 59-79
    • Maccarthy, B.L.1    Liu, J.2
  • 22
    • 0019058848 scopus 로고
    • Performance evaluation of asynchronous concurrent systems using petri nets.
    • Ramamoorthy C.V., and Ho G.S. Performance evaluation of asynchronous concurrent systems using petri nets. IEEE Transactions on Software Eng. SE-6 5 (1980) 440-449
    • (1980) IEEE Transactions on Software Eng. , vol.SE-6 , Issue.5 , pp. 440-449
    • Ramamoorthy, C.V.1    Ho, G.S.2
  • 23
    • 0023437076 scopus 로고
    • A comparative analysis of the COVERT job sequencing rule using various shop performance measures
    • Russel R.S., Dar-El E.M., and Taylor III B.V. A comparative analysis of the COVERT job sequencing rule using various shop performance measures. International Journal of Production Research 25 (1987) 1523-1540
    • (1987) International Journal of Production Research , vol.25 , pp. 1523-1540
    • Russel, R.S.1    Dar-El, E.M.2    Taylor III, B.V.3
  • 25
    • 0031119856 scopus 로고    scopus 로고
    • Strategic production-distribution models: A critical review with emphasis on global supply chain models
    • Vidal C.J., and Goetschalckx M. Strategic production-distribution models: A critical review with emphasis on global supply chain models. European Journal of Operational Research 98 (1997) 1-18
    • (1997) European Journal of Operational Research , vol.98 , pp. 1-18
    • Vidal, C.J.1    Goetschalckx, M.2
  • 26
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies and methods
    • Vieira G.E., Hermann J.W., and Lin E. Rescheduling manufacturing systems: A framework of strategies, policies and methods. Journal of Scheduling 6 1 (2003) 36-92
    • (2003) Journal of Scheduling , vol.6 , Issue.1 , pp. 36-92
    • Vieira, G.E.1    Hermann, J.W.2    Lin, E.3
  • 27
    • 0031115735 scopus 로고    scopus 로고
    • A review of the applicability of OR and AI scheduling techniques in practice
    • Weirs V.C.S. A review of the applicability of OR and AI scheduling techniques in practice. Omega International Journal of Management Science 25 2 (1997) 145-153
    • (1997) Omega International Journal of Management Science , vol.25 , Issue.2 , pp. 145-153
    • Weirs, V.C.S.1
  • 28
    • 0000927907 scopus 로고    scopus 로고
    • A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness
    • Wu S.D., Byeon E.-S., and Storer R.H. A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness. Operations Research 47 1 (1999) 113-124
    • (1999) Operations Research , vol.47 , Issue.1 , pp. 113-124
    • Wu, S.D.1    Byeon, E.-S.2    Storer, R.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.