Scheduling a dynamic flexible flow line with sequence-dependent setup times: A simulation analysis

Author keywords

Dynamic flexible flow line; Heuristics; Regression meta model; Scheduling; Sequence dependent setup times; Simulation

Indexed keywords

FLEXIBLE FLOW LINE; META MODEL; REGRESSION META-MODEL; SEQUENCE-DEPENDENT SETUP TIME; SEQUENCE-DEPENDENT SETUP TIMES;

EID: 77952615049     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540902922869     Document Type: Article
Times cited : (25)

References (37)
  • 1
    • 0031103568 scopus 로고    scopus 로고
    • Scheduling of flexible flow lines in an automobile assembly plant
    • Agnetis, A., et al., 1997. Scheduling of flexible flow lines in an automobile assembly plant. European Journal of Operational Research, 97 (2), 348-362.
    • (1997) European Journal of Operational Research , vol.97 , Issue.2 , pp. 348-362
    • Agnetis, A.1
  • 3
    • 0031256963 scopus 로고    scopus 로고
    • Simple priority rule combinations: An approach to improve both flow time and tardiness
    • Barman, S., 1997. Simple priority rule combinations: an approach to improve both flow time and tardiness. International Journal of Production Research, 35 (10), 2857-2870.
    • (1997) International Journal of Production Research , vol.35 , Issue.10 , pp. 2857-2870
    • Barman, S.1
  • 4
    • 0032074551 scopus 로고    scopus 로고
    • The impact of priority rule combinations on lateness and tardiness
    • Barman, S., 1998. The impact of priority rule combinations on lateness and tardiness. IIE Transactions, 30 (5), 495-504.
    • (1998) IIE Transactions , vol.30 , Issue.5 , pp. 495-504
    • Barman, S.1
  • 6
    • 0033078202 scopus 로고    scopus 로고
    • Heuristics for scheduling in a flow shop with multiple processors
    • Brah, S.A. and Loo, L.L., 1999. Heuristics for scheduling in a flow shop with multiple processors. European Journal of Operational Research, 113 (1), 113-122.
    • (1999) European Journal of Operational Research , vol.113 , Issue.1 , pp. 113-122
    • Brah, S.A.1    Loo, L.L.2
  • 8
    • 0036604832 scopus 로고    scopus 로고
    • Using real-time information for effective dynamic scheduling
    • Cowling, P.I. and Johansson, M., 2002. Using real-time information for effective dynamic scheduling. European Journal of Operational Research, 139 (2), 230-244.
    • (2002) European Journal of Operational Research , vol.139 , Issue.2 , pp. 230-244
    • Cowling, P.I.1    Johansson, M.2
  • 9
    • 0030149222 scopus 로고    scopus 로고
    • A computational study of heuristics for two-stage flexible flowshops
    • Guinet, A., et al., 1996. A computational study of heuristics for two-stage flexible flowshops. International Journal of Production Research, 34 (5), 1399-1415
    • (1996) International Journal of Production Research , vol.34 , Issue.5 , pp. 1399-1415
    • Guinet, A.1
  • 11
    • 0001326653 scopus 로고
    • Scheduling a two-stage hybrid flow shop with separable setup and removal times
    • Gupta, J.N.D. and Tunc, E.A., 1994. Scheduling a two-stage hybrid flow shop with separable setup and removal times. European Journal of Operational Research, 77 (3), 415-428.
    • (1994) European Journal of Operational Research , vol.77 , Issue.3 , pp. 415-428
    • Gupta, J.N.D.1    Tunc, E.A.2
  • 12
    • 34249973653 scopus 로고
    • A survey of priority rule-based scheduling
    • Haupt, R., 1989. A survey of priority rule-based scheduling. OR Spektrum, 11 (1), 3-16.
    • (1989) OR Spektrum , vol.11 , Issue.1 , pp. 3-16
    • Haupt, R.1
  • 13
    • 84969447092 scopus 로고    scopus 로고
    • Climbing depth-bounded discrepancy search for solving hybrid flow shop problems
    • Hmida, A.B., et al., 2007. Climbing depth-bounded discrepancy search for solving hybrid flow shop problems. European Journal of Industrial Engineering, 1 (2), 223-243.
    • (2007) European Journal of Industrial Engineering , vol.1 , Issue.2 , pp. 223-243
    • Hmida, A.B.1
  • 14
    • 0028766172 scopus 로고
    • Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment
    • Hunsucker, J.L. and Shah, J.R., 1994. Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment. European Journal of Operational Research, 72 (1), 102-114.
    • (1994) European Journal of Operational Research , vol.72 , Issue.1 , pp. 102-114
    • Hunsucker, J.L.1    Shah, J.R.2
  • 16
    • 0023960890 scopus 로고
    • Experimental design and regression analysis in simulation: An FMS case study
    • Kleijnen, J.P.C. and Standridge, C.R., 1988. Experimental design and regression analysis in simulation: an FMS case study. European Journal of Operational Research, 33 (3), 257-261.
    • (1988) European Journal of Operational Research , vol.33 , Issue.3 , pp. 257-261
    • Kleijnen, J.P.C.1    Standridge, C.R.2
  • 17
    • 0023562034 scopus 로고
    • Heuristic methods for flexible flow line scheduling
    • Kochhar, S. and Morris, R.J.T., 1987. Heuristic methods for flexible flow line scheduling. Journal of Manufacturing Systems, 6 (4), 299-314.
    • (1987) Journal of Manufacturing Systems , vol.6 , Issue.4 , pp. 299-314
    • Kochhar, S.1    Morris, R.J.T.2
  • 19
    • 2942674864 scopus 로고    scopus 로고
    • Scheduling flexible flow lines with sequence-dependent setup times
    • Kurz, M.E. and Askin, R.G., 2004. Scheduling flexible flow lines with sequence-dependent setup times. European Journal of Operational Research, 159 (1), 66-82.
    • (2004) European Journal of Operational Research , vol.159 , Issue.1 , pp. 66-82
    • Kurz, M.E.1    Askin, R.G.2
  • 22
    • 63449107983 scopus 로고    scopus 로고
    • Scheduling hybrid flowshops with sequencedependent setup times to minimize makespan and maximum tardiness
    • doi:10.1007/s00170-008-1569-3. [In press]
    • Naderi, B., Zandieh, M. and Roshanaei, V., 2008. Scheduling hybrid flowshops with sequencedependent setup times to minimize makespan and maximum tardiness. International Journal of Advanced Manufacturing Technology, doi:10.1007/s00170-008-1569-3. [In press].
    • (2008) International Journal of Advanced Manufacturing Technology
    • Naderi, B.1    Zandieh, M.2    Roshanaei, V.3
  • 24
    • 0023855852 scopus 로고
    • An evaluation of static flowshop scheduling heuristics in dynamic flowshop model via a computer simulation
    • Park, Y.B., 1988. An evaluation of static flowshop scheduling heuristics in dynamic flowshop model via a computer simulation. Computers and Industrial Engineering, 14 (2), 103-112.
    • (1988) Computers and Industrial Engineering , vol.14 , Issue.2 , pp. 103-112
    • Park, Y.B.1
  • 27
    • 0032649737 scopus 로고    scopus 로고
    • A comparative study of dispatching rules in dynamic flow shops and job shops
    • Rajendran, C. and Holthaus, O., 1999. A comparative study of dispatching rules in dynamic flow shops and job shops. European Journal of Operational Research, 116 (1), 156-170.
    • (1999) European Journal of Operational Research , vol.116 , Issue.1 , pp. 156-170
    • Rajendran, C.1    Holthaus, O.2
  • 28
    • 0002434711 scopus 로고
    • A solution to a special case of flow shop scheduling problems
    • S.E. Elmaghraby ed. Berlin: Springer
    • Salvador, M.S, 1973. A solution to a special case of flow shop scheduling problems. In: S.E. Elmaghraby, ed. Symposium on the theory of scheduling and its applications. Berlin: Springer, 83-91.
    • (1973) Symposium on the Theory of Scheduling and Its Applications , pp. 83-91
    • Salvador, M.S.1
  • 30
    • 84877027692 scopus 로고
    • Scheduling flexible flow lines with no in-process buffers
    • Sawik, T.J., 1995. Scheduling flexible flow lines with no in-process buffers. International Journal of Production Research, 33 (5), 1357-1367.
    • (1995) International Journal of Production Research , vol.33 , Issue.5 , pp. 1357-1367
    • Sawik, T.J.1
  • 33
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies and methods
    • Vieira, G.E., Hermann, J.W., and Lin, E., 2003. Rescheduling manufacturing systems: a framework of strategies, policies and methods. Journal of Scheduling, 6 (1), 39-62.
    • (2003) Journal of Scheduling , vol.6 , Issue.1 , pp. 39-62
    • Vieira, G.E.1    Hermann, J.W.2    Lin, E.3
  • 34
    • 57049118551 scopus 로고    scopus 로고
    • Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times
    • Vinod, V. and Sridharan, R., 2009. Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times. International Journal of Production Research, 47 (6), 1425-1447.
    • (2009) International Journal of Production Research , vol.47 , Issue.6 , pp. 1425-1447
    • Vinod, V.1    Sridharan, R.2
  • 35
    • 0018520161 scopus 로고
    • Optimal two-stage production with setup times separated
    • Yoshida, T. and Hitomi, K., 1979. Optimal two-stage production with setup times separated. IIE Transactions, 11 (3), 261-263.
    • (1979) IIE Transactions , vol.11 , Issue.3 , pp. 261-263
    • Yoshida, T.1    Hitomi, K.2
  • 37
    • 33748321077 scopus 로고    scopus 로고
    • An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
    • Zandieh, M., Fatemi Ghomi, S.M.T., and Moattar Husseini, S.M., 2006. An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Applied Mathematics and Computation, 180 (1), 111-127.
    • (2006) Applied Mathematics and Computation , vol.180 , Issue.1 , pp. 111-127
    • Zandieh, M.1    Fatemi Ghomi, S.M.T.2    Moattar Husseini, S.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.