메뉴 건너뛰기




Volumn 51, Issue 20, 2013, Pages 6209-6228

Flexible disassembly planning considering product conditions

Author keywords

Core condition; Flexible disassembly planning; Incomplete disassembly; Material purity; Mixed integer linear programming; Profit maximisation

Indexed keywords

CORE CONDITION; DISASSEMBLY PLANNING; DISASSEMBLY PROCESS; INCOMPLETE DISASSEMBLY; MATERIAL DISTRIBUTION; MIXED INTEGER LINEAR; MIXED INTEGER LINEAR PROGRAMMING; SPECIAL TREATMENTS;

EID: 84885657218     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.825406     Document Type: Article
Times cited : (28)

References (49)
  • 3
    • 84859882338 scopus 로고    scopus 로고
    • Disassembly and reassembly sequence planning tradeoffs under uncertainty for product maintenance
    • Behdad, S., and D. Thurston. 2012. "Disassembly and Reassembly Sequence Planning Tradeoffs Under Uncertainty for Product Maintenance." Journal of Mechanical Design 134 (4): 041011-1-9.
    • (2012) Journal of Mechanical Design , vol.134 , Issue.4 , pp. 0410111-0410119
    • Behdad, S.1    Thurston, D.2
  • 9
    • 84864858853 scopus 로고    scopus 로고
    • Using constraint-satisfaction to optimise disassembly sequences generated from and/or information
    • Edmunds, R., M. Kobayashi, and M. Higashi. 2012. "Using Constraint-satisfaction to Optimise Disassembly Sequences Generated from and/or Information." International Journal of Production Research 50 (15): 4105-4126.
    • (2012) International Journal of Production Research , vol.50 , Issue.15 , pp. 4105-4126
    • Edmunds, R.1    Kobayashi, M.2    Higashi, M.3
  • 12
    • 72149096791 scopus 로고    scopus 로고
    • Environmentally conscious manufacturing and product recovery (ecmpro): A review of the state of the art
    • Ilgin, M. A., and S. M. Gupta. 2010. "Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art." Journal of Environmental Management 91 (3): 563-591.
    • (2010) Journal of Environmental Management , vol.91 , Issue.3 , pp. 563-591
    • Ilgin, M.A.1    Gupta, S.M.2
  • 13
    • 28944452430 scopus 로고    scopus 로고
    • Heuristics for solving disassemble-to-order problems with stochastic yields
    • Inderfurth, K., and I. M. Langella. 2006. "Heuristics for Solving Disassemble-to-order Problems with Stochastic Yields." OR Spectrum 28 (1): 73-99.
    • (2006) OR Spectrum , vol.28 , Issue.1 , pp. 73-99
    • Inderfurth, K.1    Langella, I.M.2
  • 14
    • 85123268499 scopus 로고    scopus 로고
    • River formation dynamics approach for sequence-dependent disassembly line balancing problem
    • edited by S.M. Gupta. Boston, MA: CRC Press
    • Kalayci, C. B., and S. M. Gupta. 2013. "River Formation Dynamics Approach for Sequence-dependent Disassembly Line Balancing Problem." In Reverse Supply Chains: Issues and Analysis, edited by S.M. Gupta, 289-312. Boston, MA: CRC Press.
    • (2013) Reverse Supply Chains: Issues and Analysis , pp. 289-312
    • Kalayci, C.B.1    Gupta, S.M.2
  • 16
    • 34548418090 scopus 로고    scopus 로고
    • Disassembly scheduling: Literature review and future research directions
    • Kim, H. J., D. H. Lee, and P. Xirouchakis. 2007. "Disassembly Scheduling: Literature Review and Future Research Directions." International Journal of Production Research 45 (18-19): 4465-4484.
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4465-4484
    • Kim, H.J.1    Lee, D.H.2    Xirouchakis, P.3
  • 17
    • 60749122690 scopus 로고    scopus 로고
    • Abranch and bound algorithm for disassembly scheduling with assembly product structures
    • Kim, H. J., D. H. Lee, P. Xirouchakis, and O. K. Kwon. 2009. "ABranch and Bound Algorithm for Disassembly Scheduling with Assembly Product Structures." Journal of the Operational Research Society 60 (3): 419-430.
    • (2009) Journal of the Operational Research Society , vol.60 , Issue.3 , pp. 419-430
    • Kim, H.J.1    Lee, D.H.2    Xirouchakis, P.3    Kwon, O.K.4
  • 19
    • 70749116514 scopus 로고    scopus 로고
    • Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an and/or graph
    • Koc, A., I. Sabuncuoglu, and E. Erel. 2009. "Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an and/or Graph." IIE Transactions 41 (10): 866-881.
    • (2009) IIE Transactions , vol.41 , Issue.10 , pp. 866-881
    • Koc, A.1    Sabuncuoglu, I.2    Erel, E.3
  • 21
    • 0036611840 scopus 로고    scopus 로고
    • A multi-criteria decision making approach for disassembly-to-order systems
    • Kongar, E., and S. M. Gupta. 2002b. "A Multi-criteria Decision Making Approach for Disassembly-to-order Systems." Journal of Electronics Manufacturing 11 (2): 171-183.
    • (2002) Journal of Electronics Manufacturing , vol.11 , Issue.2 , pp. 171-183
    • Kongar, E.1    Gupta, S.M.2
  • 22
    • 31044432230 scopus 로고    scopus 로고
    • Disassembly to order system under uncertainty
    • Kongar, E., and S. M. Gupta. 2006. "Disassembly to Order System Under Uncertainty." Omega 34 (6): 550-561.
    • (2006) Omega , vol.34 , Issue.6 , pp. 550-561
    • Kongar, E.1    Gupta, S.M.2
  • 25
    • 0036612491 scopus 로고    scopus 로고
    • Demand-driven disassembly optimization for electronic products
    • Lambert, A. J. D., and S. M. Gupta. 2002. "Demand-driven Disassembly Optimization for Electronic Products." Journal of Electronics Manufacturing 11 (2): 121-135.
    • (2002) Journal of Electronics Manufacturing , vol.11 , Issue.2 , pp. 121-135
    • Lambert, A.J.D.1    Gupta, S.M.2
  • 27
    • 41849102340 scopus 로고    scopus 로고
    • Methods for optimum and near optimum disassembly sequencing
    • Lambert, A. J. D., and S. M. Gupta. 2008. "Methods for Optimum and Near Optimum Disassembly Sequencing." International Journal of Production Research 46 (11): 2845-2865.
    • (2008) International Journal of Production Research , vol.46 , Issue.11 , pp. 2845-2865
    • Lambert, A.J.D.1    Gupta, S.M.2
  • 28
    • 33746947335 scopus 로고    scopus 로고
    • Heuristics for demand-driven disassembly planning
    • Langella, I. M. 2007. "Heuristics for Demand-Driven Disassembly Planning." Computers & Operations Research 34 (2): 552-577.
    • (2007) Computers & Operations Research , vol.34 , Issue.2 , pp. 552-577
    • Langella, I.M.1
  • 29
    • 77955416142 scopus 로고    scopus 로고
    • A hierarchical end-of-life decision model for determining the economic levels of remanufacturing and disassembly under environmental regulations
    • Lee, H. B., N. W. Cho, and Y. S. Hong. 2010. "A Hierarchical End-of-life Decision Model for Determining the Economic Levels of Remanufacturing and Disassembly under Environmental Regulations." Journal of Cleaner Production 18 (13): 1276-1283.
    • (2010) Journal of Cleaner Production , vol.18 , Issue.13 , pp. 1276-1283
    • Lee, H.B.1    Cho, N.W.2    Hong, Y.S.3
  • 30
    • 70449659140 scopus 로고    scopus 로고
    • A stochastic dynamic programming based model for uncertain production planning of re-manufacturing system
    • Li, C., F. Liu, H. Cao, and Q. Wang. 2009. "A Stochastic Dynamic Programming Based Model for Uncertain Production Planning of Re-Manufacturing System." International Journal of Production Research 47 (13): 3657-3668.
    • (2009) International Journal of Production Research , vol.47 , Issue.13 , pp. 3657-3668
    • Li, C.1    Liu, F.2    Cao, H.3    Wang, Q.4
  • 31
    • 42949134256 scopus 로고    scopus 로고
    • Decomposition schemes and acceleration techniques in application to production-assemblydistribution system design
    • Liang, D., and W. E. Wilhelm. 2008. "Decomposition Schemes and Acceleration Techniques in Application to Production-assemblydistribution System Design." Computers & Operations Research 35 (12): 4010-4026.
    • (2008) Computers & Operations Research , vol.35 , Issue.12 , pp. 4010-4026
    • Liang, D.1    Wilhelm, W.E.2
  • 33
    • 33845939092 scopus 로고    scopus 로고
    • A balancing method and genetic algorithm for disassembly line balancing
    • McGovern, S. M., and S. M. Gupta. 2007. "A Balancing Method and Genetic Algorithm for Disassembly Line Balancing." European Journal of Operational Research 179 (16): 692-708.
    • (2007) European Journal of Operational Research , vol.179 , Issue.16 , pp. 692-708
    • McGovern, S.M.1    Gupta, S.M.2
  • 35
    • 84885664315 scopus 로고    scopus 로고
    • "montage und demontage
    • edited by K. H. Grote and J. Feldhusen, 23rd ed., chap. S6. Berlin: Springer
    • Seliger, G. 2011. "Montage und demontage." In Dubbel: Taschenbuch für den Maschinenbau, edited by K. H. Grote and J. Feldhusen, 23rd ed., chap. S6, S97-S103. Berlin: Springer.
    • (2011) Dubbel: Taschenbuch für Den Maschinenbau
    • Seliger, G.1
  • 36
    • 84859626393 scopus 로고    scopus 로고
    • Disassembly sequence structure graphs: An optimal approach for multiple-target selective disassembly sequence planning
    • Smith, S., G. Smith, andW. H. Chen. 2012. "Disassembly Sequence Structure Graphs:An Optimal Approach for Multiple-target Selective Disassembly Sequence Planning." Advanced Engineering Informatics 26 (2): 306-316.
    • (2012) Advanced Engineering Informatics , vol.26 , Issue.2 , pp. 306-316
    • Smith, S.1    Smith, G.2    Chen, W.H.3
  • 37
    • 0036532846 scopus 로고    scopus 로고
    • A non-interfering selective disassembly sequence for components with geometric constraints
    • Srinivasan, H., and R. Gadh. 2002. "A Non-interfering Selective Disassembly Sequence for Components with Geometric Constraints." IIE Transactions 34 (4): 349-361.
    • (2002) IIE Transactions , vol.34 , Issue.4 , pp. 349-361
    • Srinivasan, H.1    Gadh, R.2
  • 38
    • 31044434767 scopus 로고    scopus 로고
    • Determining optimal disassembly and recovery strategies
    • Teunter, R. H. 2006. "Determining Optimal Disassembly and Recovery Strategies." Omega 34 (6): 533-537.
    • (2006) Omega , vol.34 , Issue.6 , pp. 533-537
    • Teunter, R.H.1
  • 40
    • 84862118118 scopus 로고    scopus 로고
    • Evaluation model and algorithm of product disassembly process with stochastic feature
    • Tian, G., Y. Liu, Q. Tian, and J. Chu. 2012a. "Evaluation Model and Algorithm of Product Disassembly Process with Stochastic Feature." Clean Technologies and Environmental Policy 14 (2): 345-356.
    • (2012) Clean Technologies and Environmental Policy , vol.14 , Issue.2 , pp. 345-356
    • Tian, G.1    Liu, Y.2    Tian, Q.3    Chu, J.4
  • 41
    • 84862794782 scopus 로고    scopus 로고
    • Probability evaluationmodels of product disassembly cost subject to random removal time and different removal labor cost
    • Tian, G., M. C. Zhou, J. Chu, andY. Liu. 2012b. "Probability EvaluationModels of Product Disassembly Cost Subject to Random Removal Time and Different Removal Labor Cost." IEEE Transactions on Automation Science and Engineering 9 (2): 288-295.
    • (2012) IEEE Transactions on Automation Science and Engineering , vol.9 , Issue.2 , pp. 288-295
    • Tian, G.1    Zhou, M.C.2    Chu, J.3    Liu, Y.4
  • 43
    • 84904384763 scopus 로고    scopus 로고
    • Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning
    • doi:10.1007/s10845-012-0711-0: 1-13
    • Tuncel, E., A. Zeid, and S. Kamarthi. 2012. "Solving Large Scale Disassembly Line Balancing Problem with Uncertainty using Reinforcement Learning." Journal of Intelligent Manufacturing. doi:10.1007/s10845-012- 0711-0: 1-13.
    • (2012) Journal of Intelligent Manufacturing
    • Tuncel, E.1    Zeid, A.2    Kamarthi, S.3
  • 44
    • 84885589583 scopus 로고    scopus 로고
    • Disassembly planning considering linear price-consumption functions
    • edited by E. Sucky, B. Asdecker, A. Dobhan, S. Haas, and J. Wiese. Logistik und Supply Chain Management Bamberg: University of Bamberg Press
    • Ullerich, C. 2011. "Disassembly Planning Considering Linear Price-Consumption Functions." In Logistikmanagement - Herausforderungen, Chancen und Lösungen Band II, edited by E. Sucky, B. Asdecker, A. Dobhan, S. Haas, and J. Wiese, 379-397. Logistik und Supply Chain Management Bamberg: University of Bamberg Press.
    • (2011) Logistikmanagement - Herausforderungen, Chancen und Lösungen , vol.2 , pp. 379-397
    • Ullerich, C.1
  • 46
    • 84867097764 scopus 로고    scopus 로고
    • Disassembly modeling, planning, and leveling for a cam-operated rotary switch assembly: A case study
    • Vinodh, S., R. P. Kumar, and N. Nachiappan. 2012. "Disassembly Modeling, Planning, and Leveling for a Cam-Operated Rotary Switch Assembly: A Case Study." International Journal of Advanced Manufacturing Technology 62 (5-8): 789-800.
    • (2012) International Journal of Advanced Manufacturing Technology , vol.62 , Issue.5-8 , pp. 789-800
    • Vinodh, S.1    Kumar, R.P.2    Nachiappan, N.3
  • 47
    • 84885655160 scopus 로고    scopus 로고
    • Disassembly planning and sequencing for end-of-life products with rfid enriched information
    • Wan, H.d., and V. K. Gonnuru. 2013. "Disassembly Planning and Sequencing for End-of-life Products with RFID Enriched Information." Robotics and Computer-Integrated Manufacturing 29 (3): 112-118.
    • (2013) Robotics and Computer-Integrated Manufacturing , vol.29 , Issue.3 , pp. 112-118
    • Wan, H.D.1    Gonnuru, V.K.2
  • 48
    • 78650171491 scopus 로고    scopus 로고
    • Product cooperative disassembly sequence planning based on branch-and-bound algorithm
    • Zhang, X. F., and S. Y. Zhang. 2010. "Product Cooperative Disassembly Sequence Planning Based on Branch-and-bound Algorithm." International Journal of Advanced Manufacturing Technology 51 (9-12): 1139-1147.
    • (2010) International Journal of Advanced Manufacturing Technology , vol.51 , Issue.9-12 , pp. 1139-1147
    • Zhang, X.F.1    Zhang, S.Y.2
  • 49
    • 0033078088 scopus 로고    scopus 로고
    • Amethodology formodeling and adaptive planning of disassembly processes
    • Zussman, E., andM. C. Zhou. 1999. "AMethodology forModeling and Adaptive Planning of Disassembly Processes." IEEE Transactions on Robotics and Automation 15 (1): 190-194.
    • (1999) IEEE Transactions on Robotics and Automation , vol.15 , Issue.1 , pp. 190-194
    • Zussman, E.1    Zhou, M.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.