메뉴 건너뛰기




Volumn 134, Issue 4, 2012, Pages

Disassembly and reassembly sequence planning tradeoffs under uncertainty for product maintenance

Author keywords

[No Author keywords available]

Indexed keywords

C (PROGRAMMING LANGUAGE); COMMERCE; COST ACCOUNTING; COST BENEFIT ANALYSIS; GRAPHIC METHODS; INTEGER PROGRAMMING; SOLAR HEATING; UNCERTAINTY ANALYSIS;

EID: 84859882338     PISSN: 10500472     EISSN: None     Source Type: Journal    
DOI: 10.1115/1.4006262     Document Type: Article
Times cited : (40)

References (35)
  • 1
    • 77957310392 scopus 로고    scopus 로고
    • Varying lifecycle lengths within a portfolio for product take-back
    • Zhao, Y., Pandey, V., Kim, H. M., and Thurston, D., 2010, "Varying Lifecycle Lengths Within a Portfolio for Product Take-Back," Trans. ASME J. Mech. Des., 132(9), p. 091012.
    • (2010) Trans. ASME J. Mech. Des. , vol.132 , Issue.9 , pp. 091012
    • Zhao, Y.1    Pandey, V.2    Kim, H.M.3    Thurston, D.4
  • 3
    • 0036881842 scopus 로고    scopus 로고
    • Incorporating component reuse, remanufacture and recycle into product portfolio design
    • Mangun, D., and Thurston, D. L., 2002, "Incorporating Component Reuse, Remanufacture and Recycle Into Product Portfolio Design," IEEE Trans. Eng. Manage., 49(4), pp. 479-490.
    • (2002) IEEE Trans. Eng. Manage. , vol.49 , Issue.4 , pp. 479-490
    • Mangun, D.1    Thurston, D.L.2
  • 4
    • 24144494525 scopus 로고    scopus 로고
    • An object-oriented intelligent disassembly sequence planner for maintenance
    • DOI 10.1016/j.compind.2005.03.005, PII S0166361505000655
    • Li, J. R., Khoo, L. P., and Tor, S. B., 2005, "An Object-Oriented Intelligent Disassembly Sequence Planner for Maintenance," Comput. Ind., 56(7), pp. 699-718. (Pubitemid 41230990)
    • (2005) Computers in Industry , vol.56 , Issue.7 , pp. 699-718
    • Li, J.R.1    Khoo, L.P.2    Tor, S.B.3
  • 5
    • 34548394912 scopus 로고    scopus 로고
    • Disassembly sequencing for maintenance: A survey
    • Kang, J. G., and Xirouchakis, P., 2006, "Disassembly Sequencing for Maintenance: A Survey," Proc. Inst. Mech. Eng., Part B, 220(B10), pp. 1697-1716.
    • (2006) Proc. Inst. Mech. Eng., Part B , vol.220 , Issue.B10 , pp. 1697-1716
    • Kang, J.G.1    Xirouchakis, P.2
  • 6
    • 0038156629 scopus 로고    scopus 로고
    • Disassembly sequencing: A survey
    • Lambert, A. J. D., 2003, "Disassembly Sequencing: A Survey," Int. J. Prod. Res., 41(16), pp. 3721-3759.
    • (2003) Int. J. Prod. Res. , vol.41 , Issue.16 , pp. 3721-3759
    • Lambert, A.J.D.1
  • 7
    • 34547662257 scopus 로고    scopus 로고
    • Disassembly planning of mechanical systems for service and recovery: A genetic algorithms based approach
    • DOI 10.1007/s10845-007-0025-9
    • Giudice, F., and Fargione, G., 2007, "Disassembly Planning of Mechanical Systems for Service and Recovery: A Genetic Algorithms Based Approach," J. Intell. Manuf., 18(3), pp. 313-329. (Pubitemid 47209688)
    • (2007) Journal of Intelligent Manufacturing , vol.18 , Issue.3 , pp. 313-329
    • Giudice, F.1    Fargione, G.2
  • 8
    • 31044445527 scopus 로고    scopus 로고
    • Product configuration optimization for disassembly planning: A differential approach
    • DOI 10.1016/j.omega.2005.01.011, PII S0305048305000277, Reverse Production Systems
    • Allada, V., and Viswanathan, S., 2006, "Product Configuration Optimization for Disassembly Planning: A Differential Approach," Omega, 34(6), pp. 599-616. (Pubitemid 43119089)
    • (2006) Omega , vol.34 , Issue.6 , pp. 599-616
    • Viswanathan, S.1    Allada, V.2
  • 9
    • 77955192654 scopus 로고    scopus 로고
    • Simultaneous selective disassembly and end-of-life decision making for multiple products
    • Behdad, S., Kwak, M., Kim, H. M., and Thurston, D., 2010, "Simultaneous Selective Disassembly and End-of-Life Decision Making for Multiple Products," Trans. ASME J. Mech. Des., 132(4), p. 041002.
    • (2010) Trans. ASME J. Mech. Des. , vol.132 , Issue.4 , pp. 041002
    • Behdad, S.1    Kwak, M.2    Kim, H.M.3    Thurston, D.4
  • 10
    • 27844509079 scopus 로고    scopus 로고
    • Integrated approach for disassembly processes generation and recycling evaluation of an end-of-life product
    • DOI 10.1080/00207540412331270414
    • Gerner, S., Kobeissi, A., David, B., Binder, Z., and Descotes-Genon, B., 2005, "Integrated Approach for Disassembly Processes Generation and Recycling Evaluation of an End-of-Life Product," Int. J. Prod. Res., 43(1), pp. 195-222. (Pubitemid 41646835)
    • (2005) International Journal of Production Research , vol.43 , Issue.1 , pp. 195-222
    • Gerner, S.1    Kobeissi, A.2    David, B.3    Binder, Z.4    Descotes-Genon, B.5
  • 12
    • 19444364138 scopus 로고    scopus 로고
    • A selective disassembly methodology for end-of-life products
    • DOI 10.1108/01445150510590488
    • Kara, S., Pornprasitpol, P., and Kaebernick, H., 2005, "A Selective Disassembly Methodology for End-of-Life Products," Assem. Autom., 25(2), pp. 124-134. (Pubitemid 40723500)
    • (2005) Assembly Automation , vol.25 , Issue.2 , pp. 124-134
    • Kara, S.1    Pornprasitpol, P.2    Kaebernick, H.3
  • 13
    • 42449098571 scopus 로고    scopus 로고
    • Research on the selectable disassembly strategy of mechanical parts based on the generalized CAD model
    • DOI 10.1007/s00170-007-0990-3
    • Yi, J., Yu, B., Du, L., Li, C., and Hu, D., 2008, "Research on the Selectable Disassembly Strategy of Mechanical Parts Based on the Generalized CAD Model," Int. J. Adv. Manuf. Technol., 37(5-6), pp. 599-604. (Pubitemid 351572860)
    • (2008) International Journal of Advanced Manufacturing Technology , vol.37 , Issue.5-6 , pp. 599-604
    • Yi, J.1    Yu, B.2    Du, L.3    Li, C.4    Hu, D.5
  • 14
    • 17944377583 scopus 로고    scopus 로고
    • An integrated approach to selective-disassembly sequence planning
    • DOI 10.1016/j.rcim.2004.11.008, PII S0736584504001292, 14th International Conference on Flexible Automation and Intelligent Manufacturing
    • Chung, C., and Peng, Q., 2005, "An Integrated Approach to Selective- Disassembly Sequence Planning," Rob. Comput.-Integr. Manufact., 21(4-5), pp. 475-485. (Pubitemid 40597252)
    • (2005) Robotics and Computer-Integrated Manufacturing , vol.21 , Issue.4-5 , pp. 475-485
    • Chung, C.1    Peng, Q.2
  • 15
    • 0033078088 scopus 로고    scopus 로고
    • Methodology for modeling and adaptive planning of disassembly processes
    • Zussman, E., and Zhou, M. C., 1999, "Methodology for Modeling and Adaptive Planning of Disassembly Processes," IEEE Trans. Rob. Autom., 15(1), pp. 190-194.
    • (1999) IEEE Trans. Rob. Autom. , vol.15 , Issue.1 , pp. 190-194
    • Zussman, E.1    Zhou, M.C.2
  • 16
    • 0032183779 scopus 로고    scopus 로고
    • Disassembly sequence planning for products with defective parts in product recovery
    • PII S0360835298000473
    • Gungor, A., and Gupta, S. M., 1998, "Disassembly Sequence Planning for Products With Defective Parts in Product Recovery," Comput. Ind. Eng., 35(1-2), pp. 161-164. (Pubitemid 128457110)
    • (1998) Computers and Industrial Engineering , vol.35 , Issue.1-4 , pp. 161-164
    • Gungor, A.1    Gupta, S.M.2
  • 18
    • 0033358055 scopus 로고    scopus 로고
    • Linear programming in disassembly/clustering sequence generation
    • DOI 10.1016/S0360-8352(99)00162-X
    • Lambert, A. J. D., 1999, "Linear Programming in Disassembly/ Clustering Sequence Generation," Comput. Ind. Eng., 36(4), pp. 723-738. (Pubitemid 30527317)
    • (1999) Computers and Industrial Engineering , vol.36 , Issue.4 , pp. 723-738
    • Lambert, A.J.D.1
  • 19
    • 57049095036 scopus 로고    scopus 로고
    • Multi-objective disassembly planning approach with ant colony optimization algorithm
    • Lu, C., Huang, H. Z., Full, J. Y. H., and Wong, Y. S., 2008, "Multi-Objective Disassembly Planning Approach With Ant Colony Optimization Algorithm," Proc. Inst. Mech. Eng., Part B, 222(11), pp. 1465-1474.
    • (2008) Proc. Inst. Mech. Eng., Part B , vol.222 , Issue.11 , pp. 1465-1474
    • Lu, C.1    Huang, H.Z.2    Full, J.Y.H.3    Wong, Y.S.4
  • 21
    • 0344198082 scopus 로고    scopus 로고
    • Multi-criteria decision-making for optimization of product disassembly under multiple situations
    • DOI 10.1021/es0345423
    • Hula, A., Jalali, K., Hamza, K., Skerlos, S. J., and Saitou, K., 2003, "Multi-Criteria Decision-Making for Optimization of Product Disassembly Under Multiple Situations," Environ. Sci. Technol., 37(23), pp. 5303-5313. (Pubitemid 37499559)
    • (2003) Environmental Science and Technology , vol.37 , Issue.23 , pp. 5303-5313
    • Hula, A.1    Jalali, K.2    Hamza, K.3    Skerlos, S.J.4    Saitou, K.5
  • 22
    • 0034802440 scopus 로고    scopus 로고
    • A multi-objective methodology for evaluating product end-of-life options and disassembly
    • DOI 10.1007/s001700170086
    • Lee, S. G., Lye, S. W., and Khoo, M. K., 2001, "A Multi-Objective Methodology for Evaluating Product End-of-Life Options and Disassembly," Int. J. Adv. Manuf. Technol., 18(2), pp. 148-156. (Pubitemid 32914717)
    • (2001) International Journal of Advanced Manufacturing Technology , vol.18 , Issue.2 , pp. 148-156
    • Lee, S.G.1    Lye, S.W.2    Khoo, M.K.3
  • 23
    • 0033358055 scopus 로고    scopus 로고
    • Linear programming in disassembly/clustering sequence generation
    • DOI 10.1016/S0360-8352(99)00162-X
    • Lambert, A. J. D., 1999, "Linear Programming in Disassembly/ Clustering Sequence Generation," Comput. Ind. Eng., 36(4), pp. 723-738. (Pubitemid 30527317)
    • (1999) Computers and Industrial Engineering , vol.36 , Issue.4 , pp. 723-738
    • Lambert, A.J.D.1
  • 24
    • 70350174797 scopus 로고    scopus 로고
    • Utility function fundamentals
    • K. Lewis, W. Chen, and L. Schmidt, eds., ASME Press, New York, NY
    • Thurston, D., 2006, "Utility Function Fundamentals," Decision Making in Engineering Design, K. Lewis, W. Chen, and L. Schmidt, eds., ASME Press, New York, NY.
    • (2006) Decision Making in Engineering Design
    • Thurston, D.1
  • 25
    • 79955580521 scopus 로고    scopus 로고
    • Multi-attribute utility analysis of conflicting preferences
    • K. Lewis, W. Chen, and L. Schmidt, eds., ASME Press, New York, NY
    • Thurston, D., 2006, "Multi-Attribute Utility Analysis of Conflicting Preferences," Decision Making in Engineering Design, K. Lewis, W. Chen, and L. Schmidt, eds., ASME Press, New York, NY.
    • (2006) Decision Making in Engineering Design
    • Thurston, D.1
  • 26
  • 27
    • 0028448847 scopus 로고
    • Incorporating end- users' attitudes towards uncertainty into an expert system
    • Tian, Y. Q., Thurston, D. L., and Carnahan, J. V., 1994, "Incorporating End- Users' Attitudes Towards Uncertainty Into an Expert System," ASME J. Mech. Des., 116(2), pp. 493-500.
    • (1994) ASME J. Mech. Des. , vol.116 , Issue.2 , pp. 493-500
    • Tian, Y.Q.1    Thurston, D.L.2    Carnahan, J.V.3
  • 29
    • 77955213698 scopus 로고    scopus 로고
    • Design for upgradability algorithm: Configuring durable products for competitive reutilization
    • Xing, K., and Belusco, M., 2008, "Design for Upgradability Algorithm: Configuring Durable Products for Competitive Reutilization," ASME J. Mech. Des., 130(11), p. 111102.
    • (2008) ASME J. Mech. Des. , vol.130 , Issue.11 , pp. 111102
    • Xing, K.1    Belusco, M.2
  • 30
    • 85169874728 scopus 로고    scopus 로고
    • http://www.oregon.gov/ENERGY/RENEW/Solar/docs/solrwatr.pdf?ga=t
  • 31
    • 85169876503 scopus 로고    scopus 로고
    • available on June 05
    • Net zero energy solution, available on June 05, 2011, http://netzeroenergysolutions. net/
    • (2011) Net Zero Energy Solution
  • 32
    • 0023360082 scopus 로고
    • A multiattribute utility analysis of alternative sites for the disposal of nuclear waste
    • Merkhofer, M. W., and Keeney, R. L., 1987, "A Multiattribute Utility Analysis of Alternative Sites for the Disposal of Nuclear Waste," Risk Anal., 7(2), pp. 173-194. (Pubitemid 17117128)
    • (1987) Risk Analysis , vol.7 , Issue.2 , pp. 173-194
    • Merkhofer, M.W.1    Keeney, R.L.2
  • 33
    • 84885463530 scopus 로고    scopus 로고
    • Simulation of disassembly and re- assembly processes with beta-distributed operation times
    • G. Zülch, H. S. Jagdev, and P. Stock, eds., Springer, New York
    • Fischer, J., Stock, P., and Zülch, G., 2005, "Simulation of Disassembly and Re- Assembly Processes With Beta-Distributed Operation Times," Integrating Human Aspects in Production Management, G. Zülch, H. S. Jagdev, and P. Stock, eds., Springer, New York, pp. 147-156.
    • (2005) Integrating Human Aspects in Production Management , pp. 147-156
    • Fischer, J.1    Stock, P.2    Zülch, G.3
  • 34
    • 0011016393 scopus 로고
    • Maximum likelihood estimation for the four-parameter beta distribution
    • Carnahan, J. V., 1989, "Maximum Likelihood Estimation for the Four-Parameter Beta Distribution," Commun. Stat.- Simul. Comput., 8(2), pp. 513-536.
    • (1989) Commun. Stat.- Simul. Comput. , vol.8 , Issue.2 , pp. 513-536
    • Carnahan, J.V.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.