메뉴 건너뛰기




Volumn 62, Issue 2, 2012, Pages 469-478

Optimum loading of machines in a flexible manufacturing system using a mixed-integer linear mathematical programming model and genetic algorithm

Author keywords

Flexible manufacturing systems; Genetic algorithm; Machine loading problem; Process planning

Indexed keywords

BENCH-MARK PROBLEMS; FORMULATED PROBLEMS; JOB SELECTION; MACHINE COSTS; MACHINE LOADING PROBLEMS; MATHEMATICAL PROGRAMMING MODELS; MIXED-INTEGER; NEAR-OPTIMAL SOLUTIONS; OPERATION ALLOCATION; OPTIMUM LOADING; PART SELECTION; PROCESSING TIME; TOOL MAGAZINE; TOOL REQUIREMENTS; ZERO-ONE;

EID: 84855766616     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2011.10.013     Document Type: Article
Times cited : (47)

References (22)
  • 3
    • 55649124898 scopus 로고    scopus 로고
    • Modified particle swarm optimization for solving machine loading problems in flexible manufacturing systems
    • S. Biswas, and S.S. Mahapatra Modified particle swarm optimization for solving machine loading problems in flexible manufacturing systems International Journal of Advanced Manufacturing Technology 39 2008 931 942
    • (2008) International Journal of Advanced Manufacturing Technology , vol.39 , pp. 931-942
    • Biswas, S.1    Mahapatra, S.S.2
  • 4
    • 36248933733 scopus 로고    scopus 로고
    • Comparative performance analysis of a flexible manufacturing system (FMS): A review-period-based control
    • DOI 10.1080/00207540500521188, PII 770289071
    • F.T.S. Chan, R. Bhagwat, and S. Wadhwa Comparative performance analysis of a flexible manufacturing system (FMS): A review-period-based control International Journal of Production Research 46 1 2008 1 24 (Pubitemid 350129539)
    • (2008) International Journal of Production Research , vol.46 , Issue.1 , pp. 1-24
    • Chan, F.T.S.1    Bhagwat, R.2    Wadhwa, S.3
  • 5
    • 3242671403 scopus 로고    scopus 로고
    • Analysis of dynamic control strategies of an FMS under different scenarios
    • F.T.S. Chan, and H.K. Chan Analysis of dynamic control strategies of an FMS under different scenarios Robotics and Computer Integrated Manufacturing 20 5 2004 423 437
    • (2004) Robotics and Computer Integrated Manufacturing , vol.20 , Issue.5 , pp. 423-437
    • Chan, F.T.S.1    Chan, H.K.2
  • 6
    • 33746855485 scopus 로고    scopus 로고
    • Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach
    • DOI 10.1016/j.rcim.2005.11.005, PII S0736584506000627
    • F.T.S. Chan, S.H. Chung, P.L.Y. Chan, G. Finke, and M.K. Tiwari Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach Robotics and Computer Integrated Manufacturing 22 2006 493 504 (Pubitemid 44175755)
    • (2006) Robotics and Computer-Integrated Manufacturing , vol.22 , Issue.5-6 , pp. 493-504
    • Chan, F.T.S.1    Chung, S.H.2    Chan, L.Y.3    Finke, G.4    Tiwari, M.K.5
  • 7
    • 33644751275 scopus 로고    scopus 로고
    • Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS
    • DOI 10.1016/j.rcim.2005.08.001, PII S073658450500061X
    • F.T.S. Chan, and R. Swarnkar Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS Robotics and Computer Integrated Manufacturing 22 2006 353 362 (Pubitemid 43343780)
    • (2006) Robotics and Computer-Integrated Manufacturing , vol.22 , Issue.4 , pp. 353-362
    • Chan, F.T.S.1    Swarnkar, R.2
  • 9
    • 0031073978 scopus 로고    scopus 로고
    • A fuzzy integrated decision-making support system for scheduling of FMS using simulation
    • PII S0951524096000122
    • A. Kazerooni, F.T.S. Chan, and K. Abhary A fuzzy integrated decision-making support system for scheduling of FMS using simulation International Journal of Computer Integrated Manufacturing Systems 10 1 1997 27 34 (Pubitemid 127769142)
    • (1997) Computer Integrated Manufacturing Systems , vol.10 , Issue.1 , pp. 27-34
    • Kazerooni, A.1    Chan, F.T.S.2    Abhary, K.3
  • 10
    • 33748437416 scopus 로고    scopus 로고
    • Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm
    • DOI 10.1016/j.ejor.2005.06.025, PII S037722170500528X
    • A. Kumar, A. Prakash, M.K. Tiwari, R. Shankar, and A. Baveja Solving machine loading problem of a flexible manufacturing system with constraint based genetic algorithm European Journal of Operational Research 175 2006 1043 1069 (Pubitemid 44345091)
    • (2006) European Journal of Operational Research , vol.175 , Issue.2 , pp. 1043-1069
    • Kumar, A.1    Prakash, A.2    Tiwari, M.K.3    Shankar, R.4    Baveja, A.5
  • 13
    • 33644772055 scopus 로고    scopus 로고
    • A heuristic based on multi-stage programming approach for machine-loading problem in a flexible manufacturing system
    • DOI 10.1016/j.rcim.2005.07.006, PII S0736584505000608
    • N. Nagarjuna, O. Mahesh, and K. Rajagopal A heuristic based on multi-stage programming approach for machine loading problem in a flexible manufacturing system Robotics and Computer Integrated Manufacturing 22 2006 342 352 (Pubitemid 43343779)
    • (2006) Robotics and Computer-Integrated Manufacturing , vol.22 , Issue.4 , pp. 342-352
    • Nagarjuna, N.1    Mahesh, O.2    Rajagopal, K.3
  • 14
  • 15
    • 36749027726 scopus 로고    scopus 로고
    • Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems
    • DOI 10.1016/j.advengsoft.2007.01.024, PII S0965997807000415
    • A. Prakash, N. Khilwani, M.K. Tiwari, and Y. Cohen Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems Advanced Engineering Software 39 2008 219 232 (Pubitemid 350213397)
    • (2008) Advances in Engineering Software , vol.39 , Issue.3 , pp. 219-232
    • Prakash, A.1    Khilwani, N.2    Tiwari, M.K.3    Cohen, Y.4
  • 16
    • 40849085074 scopus 로고    scopus 로고
    • Optimal job sequence determination and operation machine allocation in flexible manufacturing systems: An approach using adaptive hierarchical ant colony algorithm
    • A. Prakash, M.K. Tiwari, and R. Shankar Optimal job sequence determination and operation machine allocation in flexible manufacturing systems: An approach using adaptive hierarchical ant colony algorithm Journal of Intelligent Manufacturing 19 2008 161 173
    • (2008) Journal of Intelligent Manufacturing , vol.19 , pp. 161-173
    • Prakash, A.1    Tiwari, M.K.2    Shankar, R.3
  • 17
    • 0023384747 scopus 로고
    • The machine loading and tool allocation problem in flexible manufacturing system
    • S.C. Sarin, and C.S. Chen The machine loading and tool allocation problem in flexible manufacturing system International Journal of Production Research 25 1987 1081 1094 (Pubitemid 17639948)
    • (1987) International Journal of Production Research , vol.25 , Issue.7 , pp. 1081-1094
    • Sarin, S.C.1    Chen, C.S.2
  • 18
    • 33748423441 scopus 로고
    • A loading and dispatching problem in a random flexible manufacturing system
    • K. Shankar, and Y.J. Tzen A loading and dispatching problem in a random flexible manufacturing system International Journal of Production Research 16 1985 383 393
    • (1985) International Journal of Production Research , vol.16 , pp. 383-393
    • Shankar, K.1    Tzen, Y.J.2
  • 19
    • 0020718128 scopus 로고
    • Formulation and solution of non-linear integer production planning problem for flexible manufacturing system
    • K.E. Stecke Formulation and solution of non-linear integer production planning problem for flexible manufacturing system Management Science 29 1983 273 288
    • (1983) Management Science , vol.29 , pp. 273-288
    • Stecke, K.E.1
  • 20
    • 1842864950 scopus 로고    scopus 로고
    • Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing based heuristic approach
    • R. Swarnkar, and M.K. Tiwari Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing based heuristic approach Robotics and Computer Integrated Manufacturing 20 2004 199 209
    • (2004) Robotics and Computer Integrated Manufacturing , vol.20 , pp. 199-209
    • Swarnkar, R.1    Tiwari, M.K.2
  • 22
    • 44449101297 scopus 로고    scopus 로고
    • A hybrid heuristic using genetic algorithm and simulated annealing algorithm to solve machine loading problem in FMS
    • Scottsdale, AZ, USA, September 22-25
    • Yogeswaran, M., Ponnambalam, S. G., & Tiwari, M. K. (2007). A hybrid heuristic using genetic algorithm and simulated annealing algorithm to solve machine loading problem in FMS. In IEEE conference on automation science and engineering, Scottsdale, AZ, USA, September 22-25.
    • (2007) IEEE Conference on Automation Science and Engineering
    • Yogeswaran, M.1    Ponnambalam, S.G.2    Tiwari, M.K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.