-
1
-
-
0016034846
-
Sequencing with due-dates and early start times to minimize maximum tardiness
-
K.R. Baker, and Z.S. Su Sequencing with due-dates and early start times to minimize maximum tardiness Naval Research Logistics Quarterly 21 1974 171 176
-
(1974)
Naval Research Logistics Quarterly
, vol.21
, pp. 171-176
-
-
Baker, K.R.1
Su, Z.S.2
-
2
-
-
0035284051
-
Iron ore production scheduling to improve product quality
-
J.E. Everett Iron ore production scheduling to improve product quality European Journal of Operational Research 129 2 2001 355 361
-
(2001)
European Journal of Operational Research
, vol.129
, Issue.2
, pp. 355-361
-
-
Everett, J.E.1
-
5
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
P.A. Hayek, and M.K. Salameh Production lot sizing with the reworking of imperfect quality items produced Production Planning and Control 12 6 2001 584 590
-
(2001)
Production Planning and Control
, vol.12
, Issue.6
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
7
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single-stage production system
-
A.M.M. Jamal, B.R. Sarker, and S. Mondal Optimal manufacturing batch size with rework process at a single-stage production system Computers and Industrial Engineering 47 1 2004 77 89
-
(2004)
Computers and Industrial Engineering
, vol.47
, Issue.1
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
10
-
-
0029376258
-
A hybrid approach to sequencing jobs using heuristic rules and neural networks
-
S.Y. Kim, Y.H. Lee, and D. Agnihotri A hybrid approach to sequencing jobs using heuristic rules and neural networks Production Planning and Control 6 1995 445 454
-
(1995)
Production Planning and Control
, vol.6
, pp. 445-454
-
-
Kim, S.Y.1
Lee, Y.H.2
Agnihotri, D.3
-
11
-
-
0028462998
-
Impact on sequence-dependent setup time on job shop scheduling performance
-
S.C. Kim, and P.M. Bobrowski Impact on sequence-dependent setup time on job shop scheduling performance International Journal of Production Research 32 7 1994 1503 1520
-
(1994)
International Journal of Production Research
, vol.32
, Issue.7
, pp. 1503-1520
-
-
Kim, S.C.1
Bobrowski, P.M.2
-
12
-
-
0030735290
-
A heuristic to minimize the total weighted tardiness with sequence-dependent setups
-
Y.H. Lee, K. Bhaskran, and M. Pinedo A heuristic to minimize the total weighted tardiness with sequence-dependent setups IIE Transactions 29 1997 45 52
-
(1997)
IIE Transactions
, vol.29
, pp. 45-52
-
-
Lee, Y.H.1
Bhaskran, K.2
Pinedo, M.3
-
13
-
-
0000482108
-
Scheduling jobs on parallel machines with sequence-dependent setup times
-
Y.H. Lee, and M. Pinedo Scheduling jobs on parallel machines with sequence-dependent setup times European Journal of Operations Research 100 1997 464 474
-
(1997)
European Journal of Operations Research
, vol.100
, pp. 464-474
-
-
Lee, Y.H.1
Pinedo, M.2
-
14
-
-
0042091890
-
Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
-
J.J. Liu, and Y. Ping Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs European Journal of Operational Research 91 3 1996 517 527
-
(1996)
European Journal of Operational Research
, vol.91
, Issue.3
, pp. 517-527
-
-
Liu, J.J.1
Ping, Y.2
-
15
-
-
0028585426
-
Exploiting shop floor status information to schedule complex job shops
-
I.M. Ovacik, and R. Uzsoy Exploiting shop floor status information to schedule complex job shops Journal of Manufacturing Systems 13 2 1994 73 84
-
(1994)
Journal of Manufacturing Systems
, vol.13
, Issue.2
, pp. 73-84
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
16
-
-
0029404198
-
Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
-
I.M. Ovacik, and R. Uzsoy Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times International Journal of Production Research 33 11 1995 3173
-
(1995)
International Journal of Production Research
, vol.33
, Issue.11
, pp. 3173
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
17
-
-
0000245614
-
The single machine early/tardiness problem
-
P.S. Ow, and T.E. Morton The single machine early/tardiness problem Management Science 35 1989 177 191
-
(1989)
Management Science
, vol.35
, pp. 177-191
-
-
Ow, P.S.1
Morton, T.E.2
-
22
-
-
0026253908
-
Production scheduling algorithms for a semiconductor test facility
-
R. Uzsoy, L.A. Martin-Vega, C.-Y. Lee, and P.A. Leonard Production scheduling algorithms for a semiconductor test facility IIE Transaction on Scheduling and Logistics 4 4 1991 270 280
-
(1991)
IIE Transaction on Scheduling and Logistics
, vol.4
, Issue.4
, pp. 270-280
-
-
Uzsoy, R.1
Martin-Vega, L.A.2
Lee, C.-Y.3
Leonard, P.A.4
-
23
-
-
0005752222
-
Priority rules and lead time estimation for job shop scheduling with weighted tardiness cost
-
A. Vepsalainen, and T.E. Morton Priority rules and lead time estimation for job shop scheduling with weighted tardiness cost Management Science 33 1987 1036 1047
-
(1987)
Management Science
, vol.33
, pp. 1036-1047
-
-
Vepsalainen, A.1
Morton, T.E.2
|