-
1
-
-
0017490843
-
Note-A comparison of capacity planning techniques in a job shop control system
-
Adam, N., and, Surkis, J. 1977. Note-a Comparison of Capacity Planning Techniques in a Job Shop Control System. Management Science, 23 (9): 1011-1015.
-
(1977)
Management Science
, vol.23
, Issue.9
, pp. 1011-1015
-
-
Adam, N.1
Surkis, J.2
-
2
-
-
84985810576
-
Due date assignment, job order release, and sequencing interaction in job shop scheduling
-
Ahmed, I., and, Fisher, W. W. 1992. Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling. Decision Sciences, 23: 633-647.
-
(1992)
Decision Sciences
, vol.23
, pp. 633-647
-
-
Ahmed, I.1
Fisher, W.W.2
-
3
-
-
0012245221
-
The effects of input control in a simple scheduling model
-
Baker, K. R. 1984a. The Effects of Input Control in a Simple Scheduling Model. Journal of Operations Management, 4 (2): 99-112.
-
(1984)
Journal of Operations Management
, vol.4
, Issue.2
, pp. 99-112
-
-
Baker, K.R.1
-
4
-
-
0021496929
-
Sequencing rules and due-date assignments in a job shop
-
Baker, K. R. 1984b. Sequencing Rules and Due-Date Assignments in a Job Shop. Management Science, 30 (9): 1093-1104.
-
(1984)
Management Science
, vol.30
, Issue.9
, pp. 1093-1104
-
-
Baker, K.R.1
-
5
-
-
0002479150
-
Load-oriented manufacturing control just-in-time production for job shops
-
Bechte, W. 1994. Load-Oriented Manufacturing Control Just-in-Time Production for Job Shops. Production Planning & Control, 5 (3): 292-307.
-
(1994)
Production Planning & Control
, vol.5
, Issue.3
, pp. 292-307
-
-
Bechte, W.1
-
6
-
-
0002098611
-
The use of workload information to control job lateness in controlled and uncontrolled release production systems
-
Bertrand, J. W. M. 1983a. The Use of Workload Information to Control Job Lateness in Controlled and Uncontrolled Release Production Systems. Journal of Operations Management, 3 (2): 79-92.
-
(1983)
Journal of Operations Management
, vol.3
, Issue.2
, pp. 79-92
-
-
Bertrand, J.W.M.1
-
7
-
-
0020783525
-
The effect of workload dependent due-dates on job-shop performance
-
Bertrand, J. W. M. 1983b. The Effect of Workload Dependent Due-Dates on Job-Shop Performance. Management Science, 29 (7): 799-816.
-
(1983)
Management Science
, vol.29
, Issue.7
, pp. 799-816
-
-
Bertrand, J.W.M.1
-
8
-
-
0036819519
-
An investigation of order release and flow time allowance policies for assembly shops
-
Bertrand, J. W. M., and, Wakker, A. M. 2002. An Investigation of Order Release and Flow Time Allowance Policies for Assembly Shops. Production Planning & Control, 13 (7): 639-648.
-
(2002)
Production Planning & Control
, vol.13
, Issue.7
, pp. 639-648
-
-
Bertrand, J.W.M.1
Wakker, A.M.2
-
9
-
-
0024769152
-
Implementing a loading heuristic in a discrete release job shop
-
Bobrowski, P. M. 1989. Implementing a Loading Heuristic in a Discrete Release Job Shop. International Journal of Production Research, 27 (11): 1935-1948.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.11
, pp. 1935-1948
-
-
Bobrowski, P.M.1
-
10
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng, T. C. E., and, Gupta, M. C. 1989. Survey of Scheduling Research Involving Due Date Determination Decisions. European Journal of Operational Research, 38: 156-166.
-
(1989)
European Journal of Operational Research
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
11
-
-
0032205531
-
Comparison of order review and release techniques in a dynamic and uncertain job shop environment
-
Cigolini, R., Perona, M., and, Portioli, A. 1998. Comparison of Order Review and Release Techniques in a Dynamic and Uncertain Job Shop Environment. International Journal of Production Research, 36 (11): 2931-2951.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.11
, pp. 2931-2951
-
-
Cigolini, R.1
Perona, M.2
Portioli, A.3
-
12
-
-
0004113622
-
-
Reading, MA: Addisson-Wesley
-
Conway, R., Maxwell, W. L., and, Miller, L. W. 1967. Theory of Scheduling, Reading, MA: Addisson-Wesley.
-
(1967)
Theory of Scheduling
-
-
Conway, R.1
Maxwell, W.L.2
Miller, L.W.3
-
13
-
-
33748757057
-
A capacity-driven approach to establish reliable due dates in a mto environment
-
Corti, D., Pozzetti, A., and, Zorzini, M. 2006. A Capacity-Driven Approach to Establish Reliable Due Dates in a MTO Environment. International Journal of Production Economics, 104: 536-554.
-
(2006)
International Journal of Production Economics
, vol.104
, pp. 536-554
-
-
Corti, D.1
Pozzetti, A.2
Zorzini, M.3
-
14
-
-
0032628965
-
Pricing and lead time decisions for make-to-order firms with contingent orders
-
Easton, F. F., and, Moodie, D. R. 1999. Pricing and Lead Time Decisions for Make-to-Order Firms with Contingent Orders. European Journal of Operational Research, 116: 305-318.
-
(1999)
European Journal of Operational Research
, vol.116
, pp. 305-318
-
-
Easton, F.F.1
Moodie, D.R.2
-
16
-
-
0001153814
-
A dynamic forecasting model for job shop flowtime prediction and tardiness control
-
Enns, S. T. 1995. A Dynamic Forecasting Model for Job Shop Flowtime Prediction and Tardiness Control. International Journal of Production Research, 33 (5): 1295-1312.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.5
, pp. 1295-1312
-
-
Enns, S.T.1
-
17
-
-
70249135320
-
Concerning the theory of workload control
-
Fredendall, L. D., Ojha, D., and, Patterson, J. W. 2010. Concerning the Theory of Workload Control. European Journal of Operational Research, 201 (1): 99-111.
-
(2010)
European Journal of Operational Research
, vol.201
, Issue.1
, pp. 99-111
-
-
Fredendall, L.D.1
Ojha, D.2
Patterson, J.W.3
-
18
-
-
9444238236
-
-
Wiley, NJ: Hoboken
-
Hayes, R., Pisano, G., Upton, D., and, Wheelwright, S. 2005. Operations, Strategy, and Technology: Pursuing the Competitive Edge, Wiley, NJ: Hoboken.
-
(2005)
Operations, Strategy, and Technology: Pursuing the Competitive Edge
-
-
Hayes, R.1
Pisano, G.2
Upton, D.3
Wheelwright, S.4
-
19
-
-
0027147723
-
Customer enquiry management: Part of a hierarchical system to control lead times in make-to-order companies
-
Hendry, L. C., and, Kingsman, B. G. 1993. Customer Enquiry Management: Part of a Hierarchical System to Control Lead times in Make-to-Order Companies. Journal of the Operational Research Society, 44 (1): 61-70.
-
(1993)
Journal of the Operational Research Society
, vol.44
, Issue.1
, pp. 61-70
-
-
Hendry, L.C.1
Kingsman, B.G.2
-
20
-
-
0031632563
-
The effect of workload control (wlc) on performance in make-to-order companies
-
Hendry, L. C., Kingsman, B. G., and, Cheung, P. 1998. The Effect of Workload Control (WLC) on Performance in Make-to-Order Companies. Journal of Operations Management, 16: 63-75.
-
(1998)
Journal of Operations Management
, vol.16
, pp. 63-75
-
-
Hendry, L.C.1
Kingsman, B.G.2
Cheung, P.3
-
22
-
-
0034275944
-
Quoting manufacturing due dates subject to a service level constraint
-
Hopp, W. J., and, Sturgis, M. L. R. 2000. Quoting Manufacturing Due Dates Subject to a Service Level Constraint. IIE Transactions, 32: 771-784.
-
(2000)
IIE Transactions
, vol.32
, pp. 771-784
-
-
Hopp, W.J.1
Sturgis, M.L.R.2
-
23
-
-
84986946649
-
Evaluating order release mechanisms in a job shop with sequence-dependent set-up times
-
Kim, S. J., and, Bobrowski, P. M. 1995. Evaluating Order Release Mechanisms in a Job Shop with Sequence-Dependent Set-up times. Production and Operations Management, 4 (2): 163-180.
-
(1995)
Production and Operations Management
, vol.4
, Issue.2
, pp. 163-180
-
-
Kim, S.J.1
Bobrowski, P.M.2
-
24
-
-
0034295811
-
Modelling input-output workload control for dynamic capacity planning in production planning systems
-
Kingsman, B. G. 2000. Modelling Input-Output Workload Control for Dynamic Capacity Planning in Production Planning Systems. International Journal of Production Economics, 68 (1): 73-93.
-
(2000)
International Journal of Production Economics
, vol.68
, Issue.1
, pp. 73-93
-
-
Kingsman, B.G.1
-
25
-
-
0024664777
-
A structural methodology for managing manufacturing lead times in make-to-order companies
-
Kingsman, B. G., Tatsiopoulos, I. P., and, Hendry, L. C. 1989. A Structural Methodology for Managing Manufacturing Lead times in Make-to-Order Companies. European Journal of Operational Research, 40: 196-209.
-
(1989)
European Journal of Operational Research
, vol.40
, pp. 196-209
-
-
Kingsman, B.G.1
Tatsiopoulos, I.P.2
Hendry, L.C.3
-
26
-
-
0027628217
-
Integrating marketing and production planning in make-to-order companies
-
Kingsman, B. G., Worden, L., Hendry, L. C., Mercer, A., and, Wilson, E. 1993. Integrating Marketing and Production Planning in Make-to-Order Companies. International Journal of Production Economics, 30-31: 53-66.
-
(1993)
International Journal of Production Economics
, vol.30-31
, pp. 53-66
-
-
Kingsman, B.G.1
Worden, L.2
Hendry, L.C.3
Mercer, A.4
Wilson, E.5
-
27
-
-
0032156960
-
The performance of workload control concepts in job shops: Improving the release method
-
Land, M. J., and, Gaalman, G. J. C. 1998. The Performance of Workload Control Concepts in Job Shops: Improving the Release Method. International Journal of Production Economics, 56-57: 347-364.
-
(1998)
International Journal of Production Economics
, vol.56-57
, pp. 347-364
-
-
Land, M.J.1
Gaalman, G.J.C.2
-
28
-
-
70349649481
-
Production planning and control in smes: Time for change
-
Land, M. J., and, Gaalman, G. J. C. 2009. Production Planning and Control in SMEs: Time for Change. Production Planning & Control, 20 (7): 548-558.
-
(2009)
Production Planning & Control
, vol.20
, Issue.7
, pp. 548-558
-
-
Land, M.J.1
Gaalman, G.J.C.2
-
29
-
-
0024700372
-
Order review/release: Research issues and perspectives
-
Melnyk, S. A., and, Ragatz, G. L. 1989. Order Review/Release: Research Issues and Perspectives. International Journal of Production Research, 27 (7): 1081-1096.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.7
, pp. 1081-1096
-
-
Melnyk, S.A.1
Ragatz, G.L.2
-
30
-
-
13644284218
-
Real-time due-date promising by build-to-order environments
-
Moses, S., Grant, H., Gruenwald, L., and, Pulat, S. 2004. Real-Time Due-Date Promising by Build-to-Order Environments. International Journal of Production Research, 42: 4353-4375.
-
(2004)
International Journal of Production Research
, vol.42
, pp. 4353-4375
-
-
Moses, S.1
Grant, H.2
Gruenwald, L.3
Pulat, S.4
-
31
-
-
0034295978
-
The influence of shop characteristics on workload control
-
Oosterman, B., Land, M. J., and, Gaalman, G. 2000. The Influence of Shop Characteristics on Workload Control. International Journal of Production Economics, 68 (1): 107-119.
-
(2000)
International Journal of Production Economics
, vol.68
, Issue.1
, pp. 107-119
-
-
Oosterman, B.1
Land, M.J.2
Gaalman, G.3
-
32
-
-
0001870328
-
A simulation analysis of due date assignment rules
-
Ragatz, G. L., and, Mabert, V. A. 1984. A Simulation Analysis of Due Date Assignment Rules. Journal of Operations Management, 5 (1): 27-39.
-
(1984)
Journal of Operations Management
, vol.5
, Issue.1
, pp. 27-39
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
33
-
-
0036889382
-
Operation-based flowtime estimation in a dynamic job shop
-
Sabuncuoglu, I., and, Comlekci, A. 2002. Operation-Based Flowtime Estimation in a Dynamic Job Shop. Omega, 30: 423-442.
-
(2002)
Omega
, vol.30
, pp. 423-442
-
-
Sabuncuoglu, I.1
Comlekci, A.2
-
34
-
-
0002986901
-
Manufacturing-missing link in corporate strategy
-
Skinner, W. 1969. Manufacturing-Missing Link in Corporate Strategy. Harvard Business Review, 5-6: 136-245.
-
(1969)
Harvard Business Review
, vol.5-6
, pp. 136-245
-
-
Skinner, W.1
-
35
-
-
0032630294
-
Optimal lead time policies
-
Spearman, M. L., and, Zhang, R. Q. 1999. Optimal Lead Time Policies. Management Science, 45 (2): 290-295.
-
(1999)
Management Science
, vol.45
, Issue.2
, pp. 290-295
-
-
Spearman, M.L.1
Zhang, R.Q.2
-
36
-
-
27744563510
-
A review of production planning and control: The applicability of key concepts to the make to order industry
-
Stevenson, M., Hendry, L. C., and, Kingsman, B. G. 2005. A Review of Production Planning and Control: the Applicability of Key Concepts to the Make to Order Industry. International Journal of Production Research, 43 (5): 869-898.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.5
, pp. 869-898
-
-
Stevenson, M.1
Hendry, L.C.2
Kingsman, B.G.3
-
37
-
-
79954418061
-
The theory & practice of workload control: A research agenda & implementation strategy
-
Stevenson, M., Huang, Y., Hendry, L. C., and, Soepenberg, E. 2011. The Theory & Practice of Workload Control: a Research Agenda & Implementation Strategy. International Journal of Production Economics, 131 (2): 689-700.
-
(2011)
International Journal of Production Economics
, vol.131
, Issue.2
, pp. 689-700
-
-
Stevenson, M.1
Huang, Y.2
Hendry, L.C.3
Soepenberg, E.4
-
39
-
-
84859211119
-
Modeling activity times by the parkinson distribution with a lognormal core: Theory and validation
-
Trietsch, D., Mazmanyan, L., Gevorgyan, L., and, Baker, K. R. 2012. Modeling Activity times by the Parkinson Distribution with a Lognormal Core: Theory and Validation. European Journal of Operational Research, 216: 386-396.
-
(2012)
European Journal of Operational Research
, vol.216
, pp. 386-396
-
-
Trietsch, D.1
Mazmanyan, L.2
Gevorgyan, L.3
Baker, K.R.4
-
40
-
-
0026186620
-
Dynamic rules for due-date assignment
-
Vig, M. M., and, Dooley, K. J. 1991. Dynamic Rules for Due-Date Assignment. International Journal of Production Research, 29 (7): 1361-1377.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
-
41
-
-
0027565391
-
Mixing static and dynamic flow time estimates for due-date assignment
-
Vig, M. M., and, Dooley, K. J. 1993. Mixing Static and Dynamic Flow Time Estimates for Due-Date Assignment. Journal of Operations Management, 11: 67-79.
-
(1993)
Journal of Operations Management
, vol.11
, pp. 67-79
-
-
Vig, M.M.1
Dooley, K.J.2
-
42
-
-
0018454859
-
A simulation study of predictable due-dates
-
Weeks, J. K. 1979. A Simulation Study of Predictable Due-Dates. Management Science, 25 (4): 363-373.
-
(1979)
Management Science
, vol.25
, Issue.4
, pp. 363-373
-
-
Weeks, J.K.1
-
43
-
-
0026884810
-
Due date setting and priority sequencing in a multiclass m/g/1 queue
-
Wein, L. M. 1991. Due Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue. Management Science, 38 (7): 1018-1033.
-
(1991)
Management Science
, vol.38
, Issue.7
, pp. 1018-1033
-
-
Wein, L.M.1
-
45
-
-
57149129147
-
Customer enquiry management and product customization: An empirical multi-case study analysis in the italian capital goods sector
-
Zorzini, M., Hendry, L. C., Stevenson, M., and, Pozzetti, A. 2008. Customer Enquiry Management and Product Customization: an Empirical Multi-Case Study Analysis in the Italian Capital Goods Sector. International Journal of Operations & Production Management, 28 (12): 1186-1218.
-
(2008)
International Journal of Operations & Production Management
, vol.28
, Issue.12
, pp. 1186-1218
-
-
Zorzini, M.1
Hendry, L.C.2
Stevenson, M.3
Pozzetti, A.4
|