메뉴 건너뛰기




Volumn 51, Issue 15, 2013, Pages 4502-4516

Towards an integrated workload control (WLC) concept: The performance of due date setting rules in job shops with contingent orders

Author keywords

contingent orders.; customer enquiry management (CEM); due date setting; lead time; make to order (MTO); workload control (WLC)

Indexed keywords

CONTINGENT ORDERS; CUSTOMER ENQUIRIES; DUE-DATE SETTING; LEADTIME; MAKE TO ORDER; WORKLOAD CONTROL;

EID: 84882449229     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.774485     Document Type: Article
Times cited : (18)

References (45)
  • 1
    • 0017490843 scopus 로고
    • Note-A comparison of capacity planning techniques in a job shop control system
    • Adam, N., and, Surkis, J. 1977. Note-a Comparison of Capacity Planning Techniques in a Job Shop Control System. Management Science, 23 (9): 1011-1015.
    • (1977) Management Science , vol.23 , Issue.9 , pp. 1011-1015
    • Adam, N.1    Surkis, J.2
  • 2
    • 84985810576 scopus 로고
    • Due date assignment, job order release, and sequencing interaction in job shop scheduling
    • Ahmed, I., and, Fisher, W. W. 1992. Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling. Decision Sciences, 23: 633-647.
    • (1992) Decision Sciences , vol.23 , pp. 633-647
    • Ahmed, I.1    Fisher, W.W.2
  • 3
    • 0012245221 scopus 로고
    • The effects of input control in a simple scheduling model
    • Baker, K. R. 1984a. The Effects of Input Control in a Simple Scheduling Model. Journal of Operations Management, 4 (2): 99-112.
    • (1984) Journal of Operations Management , vol.4 , Issue.2 , pp. 99-112
    • Baker, K.R.1
  • 4
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • Baker, K. R. 1984b. Sequencing Rules and Due-Date Assignments in a Job Shop. Management Science, 30 (9): 1093-1104.
    • (1984) Management Science , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.R.1
  • 5
    • 0002479150 scopus 로고
    • Load-oriented manufacturing control just-in-time production for job shops
    • Bechte, W. 1994. Load-Oriented Manufacturing Control Just-in-Time Production for Job Shops. Production Planning & Control, 5 (3): 292-307.
    • (1994) Production Planning & Control , vol.5 , Issue.3 , pp. 292-307
    • Bechte, W.1
  • 6
    • 0002098611 scopus 로고
    • The use of workload information to control job lateness in controlled and uncontrolled release production systems
    • Bertrand, J. W. M. 1983a. The Use of Workload Information to Control Job Lateness in Controlled and Uncontrolled Release Production Systems. Journal of Operations Management, 3 (2): 79-92.
    • (1983) Journal of Operations Management , vol.3 , Issue.2 , pp. 79-92
    • Bertrand, J.W.M.1
  • 7
    • 0020783525 scopus 로고
    • The effect of workload dependent due-dates on job-shop performance
    • Bertrand, J. W. M. 1983b. The Effect of Workload Dependent Due-Dates on Job-Shop Performance. Management Science, 29 (7): 799-816.
    • (1983) Management Science , vol.29 , Issue.7 , pp. 799-816
    • Bertrand, J.W.M.1
  • 8
    • 0036819519 scopus 로고    scopus 로고
    • An investigation of order release and flow time allowance policies for assembly shops
    • Bertrand, J. W. M., and, Wakker, A. M. 2002. An Investigation of Order Release and Flow Time Allowance Policies for Assembly Shops. Production Planning & Control, 13 (7): 639-648.
    • (2002) Production Planning & Control , vol.13 , Issue.7 , pp. 639-648
    • Bertrand, J.W.M.1    Wakker, A.M.2
  • 9
    • 0024769152 scopus 로고
    • Implementing a loading heuristic in a discrete release job shop
    • Bobrowski, P. M. 1989. Implementing a Loading Heuristic in a Discrete Release Job Shop. International Journal of Production Research, 27 (11): 1935-1948.
    • (1989) International Journal of Production Research , vol.27 , Issue.11 , pp. 1935-1948
    • Bobrowski, P.M.1
  • 10
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T. C. E., and, Gupta, M. C. 1989. Survey of Scheduling Research Involving Due Date Determination Decisions. European Journal of Operational Research, 38: 156-166.
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 11
    • 0032205531 scopus 로고    scopus 로고
    • Comparison of order review and release techniques in a dynamic and uncertain job shop environment
    • Cigolini, R., Perona, M., and, Portioli, A. 1998. Comparison of Order Review and Release Techniques in a Dynamic and Uncertain Job Shop Environment. International Journal of Production Research, 36 (11): 2931-2951.
    • (1998) International Journal of Production Research , vol.36 , Issue.11 , pp. 2931-2951
    • Cigolini, R.1    Perona, M.2    Portioli, A.3
  • 13
    • 33748757057 scopus 로고    scopus 로고
    • A capacity-driven approach to establish reliable due dates in a mto environment
    • Corti, D., Pozzetti, A., and, Zorzini, M. 2006. A Capacity-Driven Approach to Establish Reliable Due Dates in a MTO Environment. International Journal of Production Economics, 104: 536-554.
    • (2006) International Journal of Production Economics , vol.104 , pp. 536-554
    • Corti, D.1    Pozzetti, A.2    Zorzini, M.3
  • 14
    • 0032628965 scopus 로고    scopus 로고
    • Pricing and lead time decisions for make-to-order firms with contingent orders
    • Easton, F. F., and, Moodie, D. R. 1999. Pricing and Lead Time Decisions for Make-to-Order Firms with Contingent Orders. European Journal of Operational Research, 116: 305-318.
    • (1999) European Journal of Operational Research , vol.116 , pp. 305-318
    • Easton, F.F.1    Moodie, D.R.2
  • 16
    • 0001153814 scopus 로고
    • A dynamic forecasting model for job shop flowtime prediction and tardiness control
    • Enns, S. T. 1995. A Dynamic Forecasting Model for Job Shop Flowtime Prediction and Tardiness Control. International Journal of Production Research, 33 (5): 1295-1312.
    • (1995) International Journal of Production Research , vol.33 , Issue.5 , pp. 1295-1312
    • Enns, S.T.1
  • 19
    • 0027147723 scopus 로고
    • Customer enquiry management: Part of a hierarchical system to control lead times in make-to-order companies
    • Hendry, L. C., and, Kingsman, B. G. 1993. Customer Enquiry Management: Part of a Hierarchical System to Control Lead times in Make-to-Order Companies. Journal of the Operational Research Society, 44 (1): 61-70.
    • (1993) Journal of the Operational Research Society , vol.44 , Issue.1 , pp. 61-70
    • Hendry, L.C.1    Kingsman, B.G.2
  • 20
    • 0031632563 scopus 로고    scopus 로고
    • The effect of workload control (wlc) on performance in make-to-order companies
    • Hendry, L. C., Kingsman, B. G., and, Cheung, P. 1998. The Effect of Workload Control (WLC) on Performance in Make-to-Order Companies. Journal of Operations Management, 16: 63-75.
    • (1998) Journal of Operations Management , vol.16 , pp. 63-75
    • Hendry, L.C.1    Kingsman, B.G.2    Cheung, P.3
  • 22
    • 0034275944 scopus 로고    scopus 로고
    • Quoting manufacturing due dates subject to a service level constraint
    • Hopp, W. J., and, Sturgis, M. L. R. 2000. Quoting Manufacturing Due Dates Subject to a Service Level Constraint. IIE Transactions, 32: 771-784.
    • (2000) IIE Transactions , vol.32 , pp. 771-784
    • Hopp, W.J.1    Sturgis, M.L.R.2
  • 23
    • 84986946649 scopus 로고
    • Evaluating order release mechanisms in a job shop with sequence-dependent set-up times
    • Kim, S. J., and, Bobrowski, P. M. 1995. Evaluating Order Release Mechanisms in a Job Shop with Sequence-Dependent Set-up times. Production and Operations Management, 4 (2): 163-180.
    • (1995) Production and Operations Management , vol.4 , Issue.2 , pp. 163-180
    • Kim, S.J.1    Bobrowski, P.M.2
  • 24
    • 0034295811 scopus 로고    scopus 로고
    • Modelling input-output workload control for dynamic capacity planning in production planning systems
    • Kingsman, B. G. 2000. Modelling Input-Output Workload Control for Dynamic Capacity Planning in Production Planning Systems. International Journal of Production Economics, 68 (1): 73-93.
    • (2000) International Journal of Production Economics , vol.68 , Issue.1 , pp. 73-93
    • Kingsman, B.G.1
  • 25
    • 0024664777 scopus 로고
    • A structural methodology for managing manufacturing lead times in make-to-order companies
    • Kingsman, B. G., Tatsiopoulos, I. P., and, Hendry, L. C. 1989. A Structural Methodology for Managing Manufacturing Lead times in Make-to-Order Companies. European Journal of Operational Research, 40: 196-209.
    • (1989) European Journal of Operational Research , vol.40 , pp. 196-209
    • Kingsman, B.G.1    Tatsiopoulos, I.P.2    Hendry, L.C.3
  • 27
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload control concepts in job shops: Improving the release method
    • Land, M. J., and, Gaalman, G. J. C. 1998. The Performance of Workload Control Concepts in Job Shops: Improving the Release Method. International Journal of Production Economics, 56-57: 347-364.
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 347-364
    • Land, M.J.1    Gaalman, G.J.C.2
  • 28
    • 70349649481 scopus 로고    scopus 로고
    • Production planning and control in smes: Time for change
    • Land, M. J., and, Gaalman, G. J. C. 2009. Production Planning and Control in SMEs: Time for Change. Production Planning & Control, 20 (7): 548-558.
    • (2009) Production Planning & Control , vol.20 , Issue.7 , pp. 548-558
    • Land, M.J.1    Gaalman, G.J.C.2
  • 32
    • 0001870328 scopus 로고
    • A simulation analysis of due date assignment rules
    • Ragatz, G. L., and, Mabert, V. A. 1984. A Simulation Analysis of Due Date Assignment Rules. Journal of Operations Management, 5 (1): 27-39.
    • (1984) Journal of Operations Management , vol.5 , Issue.1 , pp. 27-39
    • Ragatz, G.L.1    Mabert, V.A.2
  • 33
    • 0036889382 scopus 로고    scopus 로고
    • Operation-based flowtime estimation in a dynamic job shop
    • Sabuncuoglu, I., and, Comlekci, A. 2002. Operation-Based Flowtime Estimation in a Dynamic Job Shop. Omega, 30: 423-442.
    • (2002) Omega , vol.30 , pp. 423-442
    • Sabuncuoglu, I.1    Comlekci, A.2
  • 34
    • 0002986901 scopus 로고
    • Manufacturing-missing link in corporate strategy
    • Skinner, W. 1969. Manufacturing-Missing Link in Corporate Strategy. Harvard Business Review, 5-6: 136-245.
    • (1969) Harvard Business Review , vol.5-6 , pp. 136-245
    • Skinner, W.1
  • 35
    • 0032630294 scopus 로고    scopus 로고
    • Optimal lead time policies
    • Spearman, M. L., and, Zhang, R. Q. 1999. Optimal Lead Time Policies. Management Science, 45 (2): 290-295.
    • (1999) Management Science , vol.45 , Issue.2 , pp. 290-295
    • Spearman, M.L.1    Zhang, R.Q.2
  • 36
    • 27744563510 scopus 로고    scopus 로고
    • A review of production planning and control: The applicability of key concepts to the make to order industry
    • Stevenson, M., Hendry, L. C., and, Kingsman, B. G. 2005. A Review of Production Planning and Control: the Applicability of Key Concepts to the Make to Order Industry. International Journal of Production Research, 43 (5): 869-898.
    • (2005) International Journal of Production Research , vol.43 , Issue.5 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 39
    • 84859211119 scopus 로고    scopus 로고
    • Modeling activity times by the parkinson distribution with a lognormal core: Theory and validation
    • Trietsch, D., Mazmanyan, L., Gevorgyan, L., and, Baker, K. R. 2012. Modeling Activity times by the Parkinson Distribution with a Lognormal Core: Theory and Validation. European Journal of Operational Research, 216: 386-396.
    • (2012) European Journal of Operational Research , vol.216 , pp. 386-396
    • Trietsch, D.1    Mazmanyan, L.2    Gevorgyan, L.3    Baker, K.R.4
  • 41
    • 0027565391 scopus 로고
    • Mixing static and dynamic flow time estimates for due-date assignment
    • Vig, M. M., and, Dooley, K. J. 1993. Mixing Static and Dynamic Flow Time Estimates for Due-Date Assignment. Journal of Operations Management, 11: 67-79.
    • (1993) Journal of Operations Management , vol.11 , pp. 67-79
    • Vig, M.M.1    Dooley, K.J.2
  • 42
    • 0018454859 scopus 로고
    • A simulation study of predictable due-dates
    • Weeks, J. K. 1979. A Simulation Study of Predictable Due-Dates. Management Science, 25 (4): 363-373.
    • (1979) Management Science , vol.25 , Issue.4 , pp. 363-373
    • Weeks, J.K.1
  • 43
    • 0026884810 scopus 로고
    • Due date setting and priority sequencing in a multiclass m/g/1 queue
    • Wein, L. M. 1991. Due Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue. Management Science, 38 (7): 1018-1033.
    • (1991) Management Science , vol.38 , Issue.7 , pp. 1018-1033
    • Wein, L.M.1
  • 45
    • 57149129147 scopus 로고    scopus 로고
    • Customer enquiry management and product customization: An empirical multi-case study analysis in the italian capital goods sector
    • Zorzini, M., Hendry, L. C., Stevenson, M., and, Pozzetti, A. 2008. Customer Enquiry Management and Product Customization: an Empirical Multi-Case Study Analysis in the Italian Capital Goods Sector. International Journal of Operations & Production Management, 28 (12): 1186-1218.
    • (2008) International Journal of Operations & Production Management , vol.28 , Issue.12 , pp. 1186-1218
    • Zorzini, M.1    Hendry, L.C.2    Stevenson, M.3    Pozzetti, A.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.