메뉴 건너뛰기




Volumn 26, Issue 8, 2013, Pages 1953-1966

A fuzzy clustering-based genetic algorithm approach for time-cost-quality trade-off problems: A case study of highway construction project

Author keywords

Fuzzy clustering; Multi objective optimization; Project management; Time cost quality trade off

Indexed keywords

CONFLICTING OBJECTIVES; CONSTRUCTION PROJECTS; CONSTRUCTION QUALITY; GENERAL CONTRACTORS; GENETIC ALGORITHM APPROACH; GOVERNMENT AGENCIES; HIGHWAY CONSTRUCTION; TIME-COST-QUALITY TRADE-OFF;

EID: 84880805244     PISSN: 09521976     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.engappai.2013.05.006     Document Type: Article
Times cited : (112)

References (35)
  • 1
    • 70450084715 scopus 로고    scopus 로고
    • Multi-objective optimization of time-cost-quality using multi-colony ant algorithm
    • A. Afshar, A. Kaveh, and O.R. Shoghli Multi-objective optimization of time-cost-quality using multi-colony ant algorithm Asian J. Civil Eng. (Build. Housing) 8 2 2007 113 124
    • (2007) Asian J. Civil Eng. (Build. Housing) , vol.8 , Issue.2 , pp. 113-124
    • Afshar, A.1    Kaveh, A.2    Shoghli, O.R.3
  • 2
    • 15944377870 scopus 로고    scopus 로고
    • Guidelines for Warranty, Multi-parameter, and Best Value Contracting
    • National Cooperative Highway Research Program, Washington, DC
    • Anderson, A.; Russell, J.; 2001. Guidelines for Warranty, Multi-parameter, and Best Value Contracting, NCHRP Report No. 451, National Cooperative Highway Research Program, Washington, DC.
    • (2001) NCHRP Report No. 451
    • Anderson, A.1    Russell, J.2
  • 3
    • 0037211132 scopus 로고    scopus 로고
    • Incentive/disincentive contracts and its effects on industrial projects
    • DOI 10.1016/S0263-7863(01)00078-3, PII S0263786301000783
    • A.A. Bubshait Incentive/disincentive contracts and its effect on industrial projects Int. J. Project Manage. 21 1 2003 63 70 (Pubitemid 35391749)
    • (2003) International Journal of Project Management , vol.21 , Issue.1 , pp. 63-70
    • Bubshait, A.A.1
  • 4
    • 4544318435 scopus 로고    scopus 로고
    • The LP/IP hybrid method for construction time-cost trade-off analysis
    • S.A. Burns, L. Liu, and C.W. Feng The LP/IP hybrid method for construction time-cost trade-off analysis Constr. Manage. Econ. 14 1 1996 265 276 (Pubitemid 126662979)
    • (1996) Construction Management and Economics , vol.14 , Issue.3 , pp. 265-276
    • Burns, S.A.1    Liu, L.2    Feng, C.-W.3
  • 5
    • 26644445713 scopus 로고    scopus 로고
    • Time-cost optimization of construction projects with generalized activity constraints
    • DOI 10.1061/(ASCE)0733-9364(2005)131:10(1115)
    • A.P. Chassiakos, and S.P. Sakellaropoulos Time cost optimization of construction projects with generalized activity constraints J. Construct. Eng. Manage. 131 10 2005 1115 1124 (Pubitemid 41441435)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.10 , pp. 1115-1124
    • Chassiakos, A.P.1    Sakellaropoulos, S.P.2
  • 6
    • 0034351369 scopus 로고    scopus 로고
    • Constraint-handling using an evolutionary multi-objective optimization technique
    • C.A.C. Coello Constraint-handling using an evolutionary multi-objective optimization technique Civil Eng. Environ. Syst. 17 4 2000 319 346
    • (2000) Civil Eng. Environ. Syst. , vol.17 , Issue.4 , pp. 319-346
    • Coello, C.A.C.1
  • 7
    • 0031102411 scopus 로고    scopus 로고
    • Complexity of the discrete time-cost tradeoff problem for project networks
    • P. De, E.J. Dunne, J.B. Ghosh, and C.E. Wells Complexity of the discrete time-cost trade-off problem for project networks Oper. Res. 45 2 1997 302 306 (Pubitemid 127684708)
    • (1997) Operations Research , vol.45 , Issue.2 , pp. 302-306
    • De, P.1    Dunne, E.J.2    Ghosh, J.B.3    Wells, C.E.4
  • 9
    • 2442507741 scopus 로고    scopus 로고
    • A fuzzy definition of optimality for many criteria optimization problems
    • M. Farina, and P. Amato A fuzzy definition of optimality for many criteria optimization problems IEEE Trans. Syst. Man Cybern. Part A: Syst. Humans 34 3 2004 315 326
    • (2004) IEEE Trans. Syst. Man Cybern. Part A: Syst. Humans , vol.34 , Issue.3 , pp. 315-326
    • Farina, M.1    Amato, P.2
  • 10
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • C. Feng, L. Liu, and S.A. Burns Using genetic algorithms to solve construction time-cost trade-off problems J. Comput. Civil Eng. 11 3 1997 184 189 (Pubitemid 127590539)
    • (1997) Journal of Computing in Civil Engineering , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.-W.1    Liu, L.2    Burns, S.A.3
  • 11
    • 0034172005 scopus 로고    scopus 로고
    • Stochastic construction time cost trade-off analysis
    • C. Feng, L. Liang, and S. Burns Stochastic construction time cost trade-off analysis J. Comput. Civil Eng. 14 2 2000 117 126
    • (2000) J. Comput. Civil Eng. , vol.14 , Issue.2 , pp. 117-126
    • Feng, C.1    Liang, L.2    Burns, S.3
  • 12
    • 0002629429 scopus 로고
    • An overview of evolutionary algorithms in multi-objective optimization
    • C.M. Fonseca, and P.J. Fleming An overview of evolutionary algorithms in multi-objective optimization Evol. Comput. 3 1 1995 1 16
    • (1995) Evol. Comput. , vol.3 , Issue.1 , pp. 1-16
    • Fonseca, C.M.1    Fleming, P.J.2
  • 13
    • 77952950281 scopus 로고    scopus 로고
    • Multi-objective optimization of time-cost trade-off using harmony search
    • Z.W. Geem Multi-objective optimization of time-cost trade-off using harmony search J. Construct. Eng. Manage. 136 6 2010 711 716
    • (2010) J. Construct. Eng. Manage. , vol.136 , Issue.6 , pp. 711-716
    • Geem, Z.W.1
  • 15
    • 0034313858 scopus 로고    scopus 로고
    • Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance
    • G. Gutierrez, and A. Paul Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanism on project performance Oper. Res. 48 6 2000 927 938 (Pubitemid 32189513)
    • (2000) Operations Research , vol.48 , Issue.6 , pp. 927-938
    • Gutierrez, G.1    Paul, A.2
  • 16
    • 0029532894 scopus 로고
    • A+B bidding method - Hidden success story for highway construction
    • Z. Herbsman A+B bidding method - hidden success story for highway construction J. Construct. Eng. Manage. 121 4 1995 430 437
    • (1995) J. Construct. Eng. Manage. , vol.121 , Issue.4 , pp. 430-437
    • Herbsman, Z.1
  • 17
    • 0029271414 scopus 로고
    • Incentive/disincentive guidelines for highway construction contracts
    • M. Jaraiedi, R. Plummer, and M. Aber Incentive/disincentive guidelines for highway construction contracts J. Construct. Eng. Manage. 121 1 1995 112 120
    • (1995) J. Construct. Eng. Manage. , vol.121 , Issue.1 , pp. 112-120
    • Jaraiedi, M.1    Plummer, R.2    Aber, M.3
  • 18
    • 33750585495 scopus 로고    scopus 로고
    • Incorporating quality considerations into project time/cost tradeoff analysis and decision making
    • DOI 10.1109/TEM.2006.883705
    • B.P. Johnson, and M.J. Liberatore Incorporating quality considerations into project time/cost trade-off analysis and decision making IEEE Trans. Eng. Manage. 53 4 2006 534 542 (Pubitemid 44680691)
    • (2006) IEEE Transactions on Engineering Management , vol.53 , Issue.4 , pp. 534-542
    • Pollack-Johnson, B.1    Liberatore, M.J.2
  • 19
    • 78951468777 scopus 로고    scopus 로고
    • Time-cost tradeoff analysis in project management: An ant system approach
    • H. Mokhtari, K.R. Baradaran, and A. Salmasnia Time-cost tradeoff analysis in project management: an ant system approach IEEE Trans. Eng. Manage. 58 1 2011 36 43
    • (2011) IEEE Trans. Eng. Manage. , vol.58 , Issue.1 , pp. 36-43
    • Mokhtari, H.1    Baradaran, K.R.2    Salmasnia, A.3
  • 20
    • 0002096988 scopus 로고
    • Reducing the size of non-dominated set: Pruning by clustering
    • J.N. Morse Reducing the size of non-dominated set: pruning by clustering Comput. Oper. Res. 7 1-2 1980 55 66
    • (1980) Comput. Oper. Res. , vol.7 , Issue.12 , pp. 55-66
    • Morse, J.N.1
  • 24
    • 77957009077 scopus 로고    scopus 로고
    • The discrete time-cost-quality trade-off using a novel hybrid genetic algorithm
    • N.S. Pour, M. Modarres, M.B. Aryanejad, and R.T. Moghadam The discrete time-cost-quality trade-off using a novel hybrid genetic algorithm Appl. Math. Sci. 4 42 2010 2081 2094
    • (2010) Appl. Math. Sci. , vol.4 , Issue.42 , pp. 2081-2094
    • Pour, N.S.1    Modarres, M.2    Aryanejad, M.B.3    Moghadam, R.T.4
  • 25
    • 84865250815 scopus 로고    scopus 로고
    • Time-cost-quality trade-off in project schedulin with linguistic variables
    • N.S. Pour, M. Modarres, and R.T. Moghadam Time-cost-quality trade-off in project schedulin with linguistic variables World Appl. Sci. J. 18 3 2012 404 413
    • (2012) World Appl. Sci. J. , vol.18 , Issue.3 , pp. 404-413
    • Pour, N.S.1    Modarres, M.2    Moghadam, R.T.3
  • 26
    • 70449446451 scopus 로고    scopus 로고
    • Multi objective particle swarm optimization for a discrete time, cost and quality trade-off problem
    • M. Rahimi, and H. Iranmanesh Multi objective particle swarm optimization for a discrete time, cost and quality trade-off problem World Appl. Sci. J. 4 2 2008 270 276
    • (2008) World Appl. Sci. J. , vol.4 , Issue.2 , pp. 270-276
    • Rahimi, M.1    Iranmanesh, H.2
  • 27
    • 15944361924 scopus 로고    scopus 로고
    • Time-cost-quality trade-off analysis for highway construction
    • K.L. Rayes, and A. Kandil Time-cost-quality trade-off analysis for highway construction J. Construct. Eng. Manage. 131 4 2005 477 485
    • (2005) J. Construct. Eng. Manage. , vol.131 , Issue.4 , pp. 477-485
    • Rayes, K.L.1    Kandil, A.2
  • 28
    • 84861348428 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the discrete time-cost trade-off problem
    • R. Sonmez, and Ö.H. Bettemir A hybrid genetic algorithm for the discrete time-cost trade-off problem Expert Syst. Appl. 13 1 2012 11428 11434
    • (2012) Expert Syst. Appl. , vol.13 , Issue.1 , pp. 11428-11434
    • Sonmez, R.1    Bettemir, Ö.H.2
  • 29
    • 34250621376 scopus 로고    scopus 로고
    • A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search
    • DOI 10.1016/j.amc.2007.01.100, PII S0096300307001336
    • H.R. Tareghian, and S.H. Taheri A solution procedure for the discrete time, cost and quality trade-off problem using electromagnetic scatter search Appl. Math. Comput. 190 2 2007 1136 1145 (Pubitemid 46935855)
    • (2007) Applied Mathematics and Computation , vol.190 , Issue.2 , pp. 1136-1145
    • Tareghian, H.R.1    Taheri, S.H.2
  • 30
    • 79751489617 scopus 로고    scopus 로고
    • Applying ant colony system to solve construction time-cost tradeoff problem
    • S. Xu Applying ant colony system to solve construction time-cost tradeoff problem Adv. Mater. Res. 179-180 2011 1390 1395
    • (2011) Adv. Mater. Res. , vol.179-180 , pp. 1390-1395
    • Xu, S.1
  • 31
    • 12344265028 scopus 로고    scopus 로고
    • Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
    • DOI 10.1061/(ASCE)0733-9364(2005)131:1(81)
    • D. Zheng, S. Thomas, and M. Kumaraswamy Applying pareto ranking and Niche formation to genetic algorithm-base multi-objective time-cost optimization J. Construct. Eng. Manage. 131 1 2005 81 91 (Pubitemid 40135235)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 81-91
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3
  • 32
    • 77950948337 scopus 로고    scopus 로고
    • Multi-objective particle swarm optimization for construction time-cost trade-off problems
    • H. Zhang, and H. Li Multi-objective particle swarm optimization for construction time-cost trade-off problems Construct. Manage. Econ. 28 1 2010 75 88
    • (2010) Construct. Manage. Econ. , vol.28 , Issue.1 , pp. 75-88
    • Zhang, H.1    Li, H.2
  • 33
    • 84866362979 scopus 로고    scopus 로고
    • An ant colony system based decision support system for construction time-cost optimization
    • Y. Zhang, and S.T. Ng An ant colony system based decision support system for construction time-cost optimization J. Civil Eng. Manage. 18 4 2012 580 589
    • (2012) J. Civil Eng. Manage. , vol.18 , Issue.4 , pp. 580-589
    • Zhang, Y.1    Ng, S.T.2
  • 34
    • 0034199979 scopus 로고    scopus 로고
    • Comparison of multi-objective evolutionary algorithms: Empirical results
    • E. Zitzler, K. Deb, and L. Thiele Comparison of multi-objective evolutionary algorithms: empirical results Evol. Comput. 8 2 2000 173 195
    • (2000) Evol. Comput. , vol.8 , Issue.2 , pp. 173-195
    • Zitzler, E.1    Deb, K.2    Thiele, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.