메뉴 건너뛰기




Volumn 18, Issue 4, 2012, Pages 580-589

An ant colony system based decision support system for construction time-cost optimization

Author keywords

ant colony system; construction project; Pareto solution; time cost optimization

Indexed keywords

ANALYTICAL METHOD; ANT COLONY SYSTEMS; COMPUTATIONAL RESOURCES; CONSTRUCTION PROJECTS; CONSTRUCTION TIME; MICROSOFT; MODEL-BASED OPC; MULTI OBJECTIVE; OPTIMIZATION ALGORITHMS; PARETO SOLUTION; PROJECT DURATION; RESEARCH STUDIES; SINGLE OBJECTIVE; TEST STUDY; TIME COST; TIME-COST OPTIMIZATION; VISUAL BASIC FOR APPLICATIONS;

EID: 84866362979     PISSN: 13923730     EISSN: 18223605     Source Type: Journal    
DOI: 10.3846/13923730.2012.704164     Document Type: Article
Times cited : (60)

References (22)
  • 1
  • 3
    • 0033084695 scopus 로고
    • Ant algorithms for discrete optimization
    • Dorigo, M.; Di Caro, G.; Gambardella, L. M. 1992. Ant algorithms for discrete optimization, Artificial Life 5(2): 137-172. http://dx.doi.org/10.1162/ 106454699568728
    • (1992) Artificial Life , vol.5 , Issue.2 , pp. 137-172
    • Dorigo, M.1    Di Caro, G.2    Gambardella, L.M.3
  • 5
    • 22344432656 scopus 로고    scopus 로고
    • Comparison among five evolutionary-based optimization algorithms
    • Elbeltagi, E.; Hegazy, T.; Grierson, D. 2005. Comparison among five evolutionary-based optimization algorithms, Advanced Engineering Informatics 19(1): 43-53. http://dx.doi.org/10.1016/j.aei.2005.01.004
    • (2005) Advanced Engineering Informatics , vol.19 , Issue.1 , pp. 43-53
    • Elbeltagi, E.1    Hegazy, T.2    Grierson, D.3
  • 6
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • Feng, C.-W.; Liu, L.; Burn, S. A. 1997. Using genetic algorithms to solve construction time-cost trade-off problems, Journal of Computing in Civil Engineering ASCE 11(3): 184-189. http://dx.doi.org/10.1061/(ASCE)0887-3801(1997) 11:3(184)
    • (1997) Journal of Computing in Civil Engineering ASCE , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.-W.1    Liu, L.2    Burn, S.A.3
  • 7
    • 77952950281 scopus 로고    scopus 로고
    • Multiobjective optimization of time-cost trade-off using harmony search
    • Geem, Z. W. 2010. Multiobjective optimization of time-cost trade-off using harmony search, Journal of Construction Engineering and Management ASCE 136(6): 711-716. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000167
    • (2010) Journal of Construction Engineering and Management ASCE , vol.136 , Issue.6 , pp. 711-716
    • Geem, Z.W.1
  • 9
    • 33745223297 scopus 로고    scopus 로고
    • Three phases of multifactor modelling of construction processes
    • Kaplinski, O.; Janusz, L. 2006. Three phases of multifactor modelling of construction processes, Journal of Civil En- gineering and Management 12(2): 127-134.
    • (2006) Journal of Civil En- Gineering and Management , vol.12 , Issue.2 , pp. 127-134
    • Kaplinski, O.1    Janusz, L.2
  • 10
    • 67949103540 scopus 로고    scopus 로고
    • Optimization models and a GAbased algorithm for stochastic time-cost trade-off problem
    • Ke, H.; Ma, W.; Ni, Y. 2009. Optimization models and a GAbased algorithm for stochastic time-cost trade-off problem, Applied Mathematics and Computation 215(1): 308-313. http://dx.doi.org/10.1016/j.amc.2009.05.004
    • (2009) Applied Mathematics and Computation , vol.215 , Issue.1 , pp. 308-313
    • Ke, H.1    Ma, W.2    Ni, Y.3
  • 11
    • 5244262334 scopus 로고    scopus 로고
    • Using improved genetic algorithms to facilitate time-cost optimization
    • Li, H.; Love, P. 1997. Using improved genetic algorithms to facilitate time-cost optimization, Journal of Construction Engineering and Management ASCE 123(3): 233-237. http://dx.doi.org/10.1061/(ASCE)0733-9364(1997)123:3(233)
    • (1997) Journal of Construction Engineering and Management ASCE , vol.123 , Issue.3 , pp. 233-237
    • Li, H.1    Love, P.2
  • 12
    • 73849103001 scopus 로고    scopus 로고
    • Memetic algorithm for solving construction time-cost optimization
    • 20-22 September, 2009, Wuhan, China IEEE Press, 1-4.http://dx.doi.org/10. 1109/ICMSS. 2009
    • Li, H.; Wang, Z. 2009. Memetic algorithm for solving construction time-cost optimization, in Proc. of the International Conference on Management and Service Science (MASS 2009), 20-22 September, 2009, Wuhan, China, IEEE Press, 1-4.http://dx.doi.org/10.1109/ICMSS.2009.5305099
    • (2009) Proc. of the International Conference on Management and Service Science (MASS 2009) , pp. 5305099
    • Li, H.1    Wang, Z.2
  • 15
    • 49749102449 scopus 로고    scopus 로고
    • Optimizing construction time and cost using ant colony optimization approach
    • Ng, S. T.; Zhang, Y. S. 2008. Optimizing construction time and cost using ant colony optimization approach, Journal of Construction Engineering and Management ASCE 134(9): 721-728. http://dx.doi.org/10.1061/(ASCE)0733-9364(2008) 134:9(721)
    • (2008) Journal of Construction Engineering and Management ASCE , vol.134 , Issue.9 , pp. 721-728
    • Ng, S.T.1    Zhang, Y.S.2
  • 17
    • 77950948337 scopus 로고    scopus 로고
    • Multi-objective particle swarm optimization for construction time-cost tradeoff problems
    • Zhang, H.; Li, H. 2010. Multi-objective particle swarm optimization for construction time-cost tradeoff problems, Construction Management and Economics 28(1): 75-88. http://dx.doi.org/10.1080/01446190903406170
    • (2010) Construction Management and Economics , vol.28 , Issue.1 , pp. 75-88
    • Zhang, H.1    Li, H.2
  • 18
    • 78149282590 scopus 로고    scopus 로고
    • Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradeoff in construction
    • Zhang, H.; Xing, F. 2010. Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradeoff in construction, Automation in Construction 19(8): 1067-1075. http://dx.doi.org/10.1016/j.autcon.2010.07.014
    • (2010) Automation in Construction , vol.19 , Issue.8 , pp. 1067-1075
    • Zhang, H.1    Xing, F.2
  • 20
    • 12744266507 scopus 로고    scopus 로고
    • Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front
    • Zheng, D. X. M.; Ng, S. T. 2005. Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front, Journal of Construction Engineering and Management ASCE 131(2): 176-186.http://dx.doi.org/ 10.1061/(ASCE)0733-9364(2005)131:2(176)
    • (2005) Journal of Construction Engineering and Management ASCE , vol.131 , Issue.2 , pp. 176-186
    • Zheng, D.X.M.1    Ng, S.T.2
  • 21
    • 2342615793 scopus 로고    scopus 로고
    • Applying a genetic algorithm-based multiobjective approach for time-cost optimization
    • Zheng, D. X. M.; Ng, S. T.; Kumaraswamy, M. M. 2004. Applying a genetic algorithm-based multiobjective approach for time-cost optimization, Journal of Construction Engi- neering and Management ASCE 130(2): 168-176. http://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:2(168)
    • (2004) Journal of Construction Engi- Neering and Management ASCE , vol.130 , Issue.2 , pp. 168-176
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3
  • 22
    • 12344265028 scopus 로고    scopus 로고
    • Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
    • Zheng, D. X. M.; Ng, S. T.; Kumaraswamy, M. M. 2005. Applying Pareto ranking and niche formation to genetic algorithm- based multiobjective time-cost optimization, Jour- nal of Construction Engineering and Management ASCE 131(1): 81-91. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:1(81)
    • (2005) Jour- Nal of Construction Engineering and Management ASCE , vol.131 , Issue.1 , pp. 81-91
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.