Decision CPM: A method for simultaneous planning, scheduling, and control of projects
-
W. Crowston and G. L. Thompson, "Decision CPM: A method for simultaneous planning, scheduling, and control of projects," Oper. Res., vol. 15, pp. 407-426, 1967.
-
(1967)
Oper. Res.
, vol.15
, pp. 407-426
-
-
Crowston, W.1
Thompson, G.L.2
-
2
-
-
0016566179
-
A dynamic programming solution to cost-time tradeoff for CPM
-
D. R. Robinson, "A dynamic programming solution to cost-time tradeoff for CPM," Manage. Sci., vol. 22, pp. 158-166, 1975.
-
(1975)
Manage. Sci.
, vol.22
, pp. 158-166
-
-
Robinson, D.R.1
-
3
-
-
0030571696
-
Optimal procedures for the discrete time/cost trade-off problem in project networks
-
E. Demeulemeester, S. E. Elmaghraby, and W. Herroelen, "Optimal procedures for the discrete time/cost trade-off problem in project networks," Eur. J. Oper. Res., vol. 88, pp. 50-68, 1996.
-
(1996)
Eur. J. Oper. Res.
, vol.88
, pp. 50-68
-
-
Demeulemeester, E.1
Elmaghraby, S.E.2
Herroelen, W.3
-
4
-
-
0032205606
-
Newcomputational results on the discrete time/cost tradeoff problem in project networks
-
E. Demeulemeester, B. De Reyck, B. Foubert, W. Herroelen, and M.Vanhoucke, "Newcomputational results on the discrete time/cost tradeoff problem in project networks," J. Oper. Res. Soc., vol. 49, pp. 1153- 1163, 1998.
-
(1998)
J. Oper. Res. Soc.
, vol.49
, pp. 1153-1163
-
-
Demeulemeester, E.1
De Reyck, B.2
Foubert, B.3
Herroelen, W.4
Vanhoucke, M.5
-
5
-
-
0025701915
-
A multi stage non-deterministic model for a project scheduling under resource consideration
-
L. V. Tavares, "A multi stage non-deterministic model for a project scheduling under resource consideration," Eur. J. Oper. Res., vol. 49, pp. 92-101, 1990.
-
(1990)
Eur. J. Oper. Res.
, vol.49
, pp. 92-101
-
-
Tavares, L.V.1
-
6
-
-
34848917527
-
The discrete time/cost trade-off problem: Extensions and heuristic procedures
-
M. Vanhoucke and D. Debels, "The discrete time/cost trade-off problem: Extensions and heuristic procedures," J. Scheduling, vol. 10, pp. 311-326, 2007.
-
(2007)
J. Scheduling
, vol.10
, pp. 311-326
-
-
Vanhoucke, M.1
Debels, D.2
-
7
-
-
71949090693
-
Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation
-
A. Aghaie and H. Mokhtari, "Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation," Int. J. Adv. Manuf. Technol., vol. 45, pp. 1051-1067, 2009.
-
(2009)
Int. J. Adv. Manuf. Technol.
, vol.45
, pp. 1051-1067
-
-
Aghaie, A.1
Mokhtari, H.2
-
8
-
-
0000181338
-
A network flow computation for project cost curves
-
D. R. Fulkerson, "A network flow computation for project cost curves," Manage. Sci., vol. 7, pp. 167-178, 1961.
-
(1961)
Manage. Sci.
, vol.7
, pp. 167-178
-
-
Fulkerson, D.R.1
-
9
-
-
34250637152
-
The stochastic time-cost tradeoff problem: A robust optimization approach
-
I. Cohen, B. Golany, and A. Shtub, "The stochastic time-cost tradeoff problem: A robust optimization approach," Networks, vol. 49, pp. 175- 188, 2007.
-
(2007)
Networks
, vol.49
, pp. 175-188
-
-
Cohen, I.1
Golany, B.2
Shtub, A.3
-
10
-
-
0014804811
-
Optimum time compression in project scheduling
-
L. R. Lamberson and R. R. Hocking, "Optimum time compression in project scheduling," Manage. Sci., vol. 16, pp. B597-B606, 1970.
-
(1970)
Manage. Sci.
, vol.16
-
-
Lamberson, L.R.1
Hocking, R.R.2
-
11
-
-
78650277585
-
Project time-cost trade-off scheduling: A hybrid optimization approach
-
to be published, DOI:10.1007/s00170-010-2543-4
-
H. Mokhtari, A. Aghaie, J. Rahimi, and A. Mozdgir, "Project time-cost trade-off scheduling: A hybrid optimization approach," Int. J. Adv. Manuf. Technol., to be published DOI: 10.1007/s00170-010-2543-4, 2011.
-
(2011)
Int. J. Adv. Manuf. Technol.
-
-
Mokhtari, H.1
Aghaie, A.2
Rahimi, J.3
Mozdgir, A.4
-
12
-
-
0030289778
-
Time-resource tradeoff problem
-
Nov.
-
P. S. Pulat and S. J. Horn, "Time-resource tradeoff problem," IEEE Trans. Eng. Manage., vol. 43, no. 4, pp. 411-417, Nov. 1996.
-
(1996)
IEEE Trans. Eng. Manage.
, vol.43
, Issue.4
, pp. 411-417
-
-
Pulat, P.S.1
Horn, S.J.2
-
13
-
-
0042416400
-
Resource allocation in PERT network under activity continuous time-cost functions
-
E. B. Berman, "Resource allocation in PERT network under activity continuous time-cost functions," Manage. Sci., vol. 10, pp. 734-745, 1964.
-
(1964)
Manage. Sci.
, vol.10
, pp. 734-745
-
-
Berman, E.B.1
-
14
-
-
46149142447
-
A goal programming model for project crashing with piecewise linear time-cost trade-off
-
P. Vrat and C. Kriengkrairut, "A goal programming model for project crashing with piecewise linear time-cost trade-off," Eng. Costs Prod. Econ., vol. 10, pp. 161-172, 1986.
-
(1986)
Eng. Costs Prod. Econ.
, vol.10
, pp. 161-172
-
-
Vrat, P.1
Kriengkrairut, C.2
-
15
-
-
0001620447
-
Critical-path planning and scheduling: Mathematical basis
-
J. R. Kelley, "Critical-path planning and scheduling: Mathematical basis," Oper. Res., vol. 9, pp. 296-320, 1961.
-
(1961)
Oper. Res.
, vol.9
, pp. 296-320
-
-
Kelley, J.R.1
-
16
-
-
0001036327
-
Nonlinear time-cost tradeoff models in project management
-
R. F. Deckro, J. E. Hebert, W. A. Verdini, P. H. Grimsurd, and E. Venkateshwar, "Nonlinear time-cost tradeoff models in project management," Comput. Ind. Eng., vol. 28, pp. 219-229, 1995.
-
(1995)
Comput. Ind. Eng.
, vol.28
, pp. 219-229
-
-
Deckro, R.F.1
Hebert, J.E.2
Verdini, W.A.3
Grimsurd, P.H.4
Venkateshwar, E.5
-
17
-
-
0035193271
-
A GA-based fuzzy optimal model for construction time cost trade off
-
S. Leu, A. Chen, and C. Yang, "A GA-based fuzzy optimal model for construction time cost trade off," Int. J. Proj. Manage., vol. 19, pp. 47- 58, 2001.
-
(2001)
Int. J. Proj. Manage.
, vol.19
, pp. 47-58
-
-
Leu, S.1
Chen, A.2
Yang, C.3
-
18
-
-
4544318435
-
The Lp/Ip hybrid method for construction time cost trade of analysis
-
S. A. Burns, L. Liu, and C. Weifeng, "The Lp/Ip hybrid method for construction time cost trade of analysis," Constr. Manage. Econ., vol. 14, pp. 265-275, 1996.
-
(1996)
Constr. Manage. Econ.
, vol.14
, pp. 265-275
-
-
Burns, S.A.1
Liu, L.2
Weifeng, C.3
-
19
-
-
33749155193
-
Properties of multi-mode resourceconstrained project scheduling problems with resource vacations and activity splitting
-
J. Buddhakulsomsiri and D. Kim, "Properties of multi-mode resourceconstrained project scheduling problems with resource vacations and activity splitting," Eur. J. Oper. Res., vol. 175, pp. 279-295, 2006.
-
(2006)
Eur. J. Oper. Res.
, vol.175
, pp. 279-295
-
-
Buddhakulsomsiri, J.1
Kim, D.2
-
20
-
-
0000302371
-
A note on a simple CPM time-cost tradeoff algorithm
-
S. K. Goyal, "A note on "a simple CPM time-cost tradeoff algorithm"," Manage. Sci., vol. 21, pp. 718-722, 1975.
-
(1975)
Manage. Sci.
, vol.21
, pp. 718-722
-
-
Goyal, S.K.1
-
21
-
-
19244376018
-
A simple CPM time-cost tradeoff algorithm
-
N. Siemens, "A simple CPM time-cost tradeoff algorithm," Manage. Sci., vol. 17, pp. B354-B363, 1971.
-
(1971)
Manage. Sci.
, vol.17
-
-
Siemens, N.1
-
22
-
-
33846884364
-
A stochastic multimode model for time cost tradeoffs undermanagement flexibility
-
P. C. Godinho and J. P. Costa, "A stochastic multimode model for time cost tradeoffs undermanagement flexibility," OR Spectr., vol. 29, pp. 311-334, 2007.
-
(2007)
OR Spectr.
, vol.29
, pp. 311-334
-
-
Godinho, P.C.1
Costa, J.P.2
-
23
-
-
0025701917
-
Project compression: A method for speeding up resource constrained projects which preserve the activity schedule
-
C. Yau and E. Ritche, "Project compression: A method for speeding up resource constrained projects which preserve the activity schedule," Eur. J. Oper. Res., vol. 49, pp. 140-152, 1990.
-
(1990)
Eur. J. Oper. Res.
, vol.49
, pp. 140-152
-
-
Yau, C.1
Ritche, E.2
-
24
-
-
0034172005
-
Stochastic construction time-cost trade off analysis
-
C. W. Feng, L. Liu, and S. A. Burns, "Stochastic construction time-cost trade off analysis," J. Comput. Civil Eng., vol. 14, pp. 117-126, 2000.
-
(2000)
J. Comput. Civil Eng.
, vol.14
, pp. 117-126
-
-
Feng, C.W.1
Liu, L.2
Burns, S.A.3
-
25
-
-
47349107175
-
Time-cost optimization: UsingGAand fuzzy sets theory for uncertainties in cost
-
E. Eshtehardian, A. Afshar, and R. Abbasnia, "Time-cost optimization: UsingGAand fuzzy sets theory for uncertainties in cost," Constr.Manage. Econ., vol. 26, pp. 679-691, 2008.
-
(2008)
Constr.Manage. Econ.
, vol.26
, pp. 679-691
-
-
Eshtehardian, E.1
Afshar, A.2
Abbasnia, R.3
-
26
-
-
0030082551
-
Ant system: Optimization by a colony of cooperating agents
-
Feb.
-
M. Dorigo, V. Maniezzo, and A. Colorni, "Ant system: Optimization by a colony of cooperating agents," IEEE Trans. Syst., Man, Cybern.-Part B, vol. 26, no. 1, pp. 29-41, Feb. 1996.
-
(1996)
IEEE Trans. Syst., Man, Cybern.-Part B
, vol.26
, Issue.1
, pp. 29-41
-
-
Dorigo, M.1
Maniezzo, V.2
Colorni, A.3
-
27
-
-
0031122887
-
Ant colony system: A cooperative learning approach to the traveling salesman problem
-
Apr.
-
M. Dorigo and L. M. Gambardella, "Ant colony system: A cooperative learning approach to the traveling salesman problem," IEEE Trans. Evol. Comput., vol. 1, no. 1, pp. 53-66, Apr. 1997.
-
(1997)
IEEE Trans. Evol. Comput.
, vol.1
, Issue.1
, pp. 53-66
-
-
Dorigo, M.1
Gambardella, L.M.2
|