메뉴 건너뛰기




Volumn 24, Issue 4, 1997, Pages 335-351

A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL COMPLEXITY; COMPUTATIONAL METHODS; GENETIC ALGORITHMS; MOBILE ROBOTS; NONLINEAR PROGRAMMING; OPERATIONS RESEARCH; PARAMETER ESTIMATION; PROBLEM SOLVING; SCHEDULING;

EID: 0031124354     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0548(96)00061-5     Document Type: Article
Times cited : (206)

References (38)
  • 1
    • 0041587598 scopus 로고
    • Simultaneous scheduling of machines and material handling devices in automated manufacturing
    • eds K. E. Stecke and R. Suri, Elsevier, Amsterdam
    • Raman, N., Talbot, F. B. and Rachamadgu, R. V., Simultaneous scheduling of machines and material handling devices in automated manufacturing. In Proc. of the Second ORSA/TIMS Conf. on Flexible Manufacturing Systems, eds K. E. Stecke and R. Suri, pp. 455-466. Elsevier, Amsterdam, 1986.
    • (1986) Proc. of the Second ORSA/TIMS Conf. on Flexible Manufacturing Systems , pp. 455-466
    • Raman, N.1    Talbot, F.B.2    Rachamadgu, R.V.3
  • 3
    • 0042471671 scopus 로고
    • Guided vehicle systems: Information/control system implication of alternative design and operation strategies
    • eds S. Y. Nof and C. L. Moodie, NATO ASI Series, Springer-Verlag, Berlin
    • Bozer, Y. A., Guided vehicle systems: information/control system implication of alternative design and operation strategies. In Advanced Information Technologies for Industrial Material Flow Systems, eds S. Y. Nof and C. L. Moodie, NATO ASI Series, pp. 417-436. Springer-Verlag, Berlin, 1989.
    • (1989) Advanced Information Technologies for Industrial Material Flow Systems , pp. 417-436
    • Bozer, Y.A.1
  • 4
    • 0024680284 scopus 로고
    • Control of material handling transporter in automated manufacturing
    • Han, M. and McGinnis, L. F., Control of material handling transporter in automated manufacturing. IIE Trans., 1989, 21, 184-190.
    • (1989) IIE Trans. , vol.21 , pp. 184-190
    • Han, M.1    McGinnis, L.F.2
  • 5
    • 0002297060 scopus 로고
    • Design and planning problems in flexible manufacturing systems: A critical review
    • Kouvelis, P., Design and planning problems in flexible manufacturing systems: a critical review. J. Intelligent Manufacturing, 1992, 3, 75-99.
    • (1992) J. Intelligent Manufacturing , vol.3 , pp. 75-99
    • Kouvelis, P.1
  • 6
    • 0009342519 scopus 로고
    • Design justification of material handling systems
    • ed. J. M. A. Tanchoco, Chapman and Hall
    • Noble, J. S. and Tanchoco, J. M. A., Design justification of material handling systems. In Material Flow Systems in Manufacturing, ed. J. M. A. Tanchoco, pp. 54-72. Chapman and Hall, 1994.
    • (1994) Material Flow Systems in Manufacturing , pp. 54-72
    • Noble, J.S.1    Tanchoco, J.M.A.2
  • 7
    • 0020140765 scopus 로고
    • Design of automated guided vehicles
    • Maxwell, W. L. and Muchstadt, J. A., Design of automated guided vehicles. IIE Trans., 1982, 14, 114-124.
    • (1982) IIE Trans. , vol.14 , pp. 114-124
    • Maxwell, W.L.1    Muchstadt, J.A.2
  • 8
    • 0042612417 scopus 로고
    • An expert system for design of automated material handling systems (INSIMAS)
    • Grosseschallau, W. and Kusiak, A., An expert system for design of automated material handling systems (INSIMAS). Mater. Flow, 1985, 2, 157-166.
    • (1985) Mater. Flow , vol.2 , pp. 157-166
    • Grosseschallau, W.1    Kusiak, A.2
  • 9
    • 0022546416 scopus 로고
    • Using SLAM to design the material handling system of an FMS
    • Chang, Y., Sullivan, R. S. and Wilson, J. R., Using SLAM to design the material handling system of an FMS. Int. J. Prod. Res., 1986, 24, 15-26.
    • (1986) Int. J. Prod. Res. , vol.24 , pp. 15-26
    • Chang, Y.1    Sullivan, R.S.2    Wilson, J.R.3
  • 10
    • 0025482436 scopus 로고
    • Design of an automated guided vehicle design-based material handling system for an FMS
    • Mahadevan, B. and Narendran, T. T., Design of an automated guided vehicle design-based material handling system for an FMS. Int. J. Prod. Res., 1990, 28, 1611-1622.
    • (1990) Int. J. Prod. Res. , vol.28 , pp. 1611-1622
    • Mahadevan, B.1    Narendran, T.T.2
  • 11
    • 0000687077 scopus 로고
    • A model for the design of zone control automated guided vehicle systems
    • Malmborg, C. J., A model for the design of zone control automated guided vehicle systems. Int. J. Prod. Res., 1990, 28, 1741-1758.
    • (1990) Int. J. Prod. Res. , vol.28 , pp. 1741-1758
    • Malmborg, C.J.1
  • 12
    • 0004428849 scopus 로고
    • A simulation model for estimating vehicle requirements in automated guided vehicle systems
    • Gobal, S. L. and Kasilingam, R. G., A simulation model for estimating vehicle requirements in automated guided vehicle systems. Computers Industrial Engg, 1991, 21, 623-627.
    • (1991) Computers Industrial Engg , vol.21 , pp. 623-627
    • Gobal, S.L.1    Kasilingam, R.G.2
  • 13
    • 0009401509 scopus 로고
    • An integrated framework for the design of material flow systems
    • ed. J. M. A. Tanchoco. Chapman and Hull
    • Rembold, B. F., and Tanchoco, J. M. A., An integrated framework for the design of material flow systems. In Material Flow Systems in Manufacturing, ed. J. M. A. Tanchoco. Chapman and Hull, 1994, pp. 3-53.
    • (1994) Material Flow Systems in Manufacturing , pp. 3-53
    • Rembold, B.F.1    Tanchoco, J.M.A.2
  • 14
    • 0024731596 scopus 로고
    • An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
    • Wu, S. D. and Wysk, R. A., An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing. Int. J. Prod. Res., 1989, 27, 1603-1623.
    • (1989) Int. J. Prod. Res. , vol.27 , pp. 1603-1623
    • Wu, S.D.A.1    Wysk, R.A.2
  • 15
    • 0025262878 scopus 로고
    • Multi-criteria operational control rules in flexible manufacturing systems
    • Ro, I. and Kim, J., Multi-criteria operational control rules in flexible manufacturing systems. Int. J. Prod. Res., 1990, 28, 47-63.
    • (1990) Int. J. Prod. Res. , vol.28 , pp. 47-63
    • Ro, I.A.1    Kim, J.2
  • 16
    • 0026866144 scopus 로고
    • Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system
    • Sabuncuoǧlu, I. and Hommertzheim, D. L., Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system. Int. J. Prod. Res., 1992, 30, 1059-1079.
    • (1992) Int. J. Prod. Res. , vol.30 , pp. 1059-1079
    • Sabuncuoǧlu, I.1    Hommertzheim, D.L.2
  • 17
    • 0042972702 scopus 로고
    • Scheduling of machines and vehicles in an FMS: Single-level versus multi-level approach
    • Sawik, T., Scheduling of machines and vehicles in an FMS: single-level versus multi-level approach. Automatyka, 1993, 64, 541-568.
    • (1993) Automatyka , vol.64 , pp. 541-568
    • Sawik, T.1
  • 18
    • 0023963149 scopus 로고
    • A LISP based controller for free-ranging automated guided vehicle systems
    • Taghaboni, F. and Tanchoco, J. M. A., A LISP based controller for free-ranging automated guided vehicle systems. Int. J. Prod. Res., 1988, 26, 173-188.
    • (1988) Int. J. Prod. Res. , vol.26 , pp. 173-188
    • Taghaboni, F.1    Tanchoco, J.M.A.2
  • 19
    • 0002756061 scopus 로고
    • Real-time control strategies for multiple-load AGVs
    • ed. J. M. A. Tanchoco. Chapman and Hull
    • Tanchoco, J. M. A. and Co, C., Real-time control strategies for multiple-load AGVs. In Material Flow Systems in Manufacturing, ed. J. M. A. Tanchoco. Chapman and Hull, 1994, pp. 300-331.
    • (1994) Material Flow Systems in Manufacturing , pp. 300-331
    • Tanchoco, J.M.A.1    Co, C.2
  • 20
    • 0027841435 scopus 로고
    • A beam search based algorithm for scheduling machines and AGVs in an FMS
    • Karabük, S. and Sabuncuoǧlu, I., A beam search based algorithm for scheduling machines and AGVs in an FMS. In Proc. Second Industrial Engg Res. Conf., 1993, pp. 308-312.
    • (1993) Proc. Second Industrial Engg Res. Conf. , pp. 308-312
    • Karabük, S.1    Sabuncuoǧlu, I.2
  • 23
    • 0029404820 scopus 로고
    • A time window approach to simultaneous scheduling of machines and material handling system in an FMS
    • Bilge, Ü. and Ulusoy, G., A time window approach to simultaneous scheduling of machines and material handling system in an FMS. Opns Res., 1995, 43, 1058-1070.
    • (1995) Opns Res. , vol.43 , pp. 1058-1070
    • Bilge, Ü.1    Ulusoy, G.2
  • 24
    • 34250111322 scopus 로고
    • Design, planning, scheduling, and control problems of flexible manufacturing systems
    • Stecke, K. E., Design, planning, scheduling, and control problems of flexible manufacturing systems. Annals of Opns Res., 1985, 3, 3-12.
    • (1985) Annals of Opns Res. , vol.3 , pp. 3-12
    • Stecke, K.E.1
  • 25
    • 0041971068 scopus 로고
    • Working Paper 86-01, University of Southern California, Department of Industrial and Systems Engineering, Los Angeles, California
    • Kiran, A. S. and Tansel, B., Mathematical programming models for FMSs. Working Paper 86-01, University of Southern California, Department of Industrial and Systems Engineering, Los Angeles, California, 1986.
    • (1986) Mathematical Programming Models for FMSs
    • Kiran, A.S.1    Tansel, B.2
  • 27
    • 0002755938 scopus 로고
    • Schedule optimization using genetic algorithms
    • ed. L. Davis.
    • Syswerda, G., Schedule optimization using genetic algorithms. In Handbook of Genetic Algorithms, ed. L. Davis. 1991, pp. 332-349.
    • (1991) Handbook of Genetic Algorithms , pp. 332-349
    • Syswerda, G.1
  • 28
    • 0027629091 scopus 로고
    • A genetics based hybrid scheduler for generating static schedules in flexible manufacturing contexts
    • Holsapple, G. W., Jacop, V. S., Pakath, R. and Zaveri, J. S., A genetics based hybrid scheduler for generating static schedules in flexible manufacturing contexts. IEEE Trans. Systems Man and Cybernetics, 1993, SMC-23, 953-972.
    • (1993) IEEE Trans. Systems Man and Cybernetics , vol.SMC-23 , pp. 953-972
    • Holsapple, G.W.1    Jacop, V.S.2    Pakath, R.3    Zaveri, J.S.4
  • 29
  • 30
    • 0026206548 scopus 로고
    • PROGENITOR: A GA for production scheduling
    • Kanet, J. J. and Sridharan, V., PROGENITOR: A GA for production scheduling. Wirtschaftsinformatik, 1991, 33, 4 332-336.
    • (1991) Wirtschaftsinformatik , vol.33 , Issue.4 , pp. 332-336
    • Kanet, J.J.1    Sridharan, V.2
  • 31
    • 0003067290 scopus 로고
    • Direct chromosome representation and advanced genetic operators for production scheduling
    • ed. S. Forest. Morgan Kaufmann, Fairfax, Virginia
    • Bruns, R., Direct chromosome representation and advanced genetic operators for production scheduling. In Proc. 5th Int. Conf. on Genetic Algorithms, ed. S. Forest. Morgan Kaufmann, Fairfax, Virginia, 1993, pp. 352-359.
    • (1993) Proc. 5th Int. Conf. on Genetic Algorithms , pp. 352-359
    • Bruns, R.1
  • 32
    • 0003011391 scopus 로고
    • A promising GA approach to job-shop scheduling, rescheduling and open-shop scheduling problems
    • ed. S. Forest. Morgan Kaufmann, Fairfax, Virginia
    • Fang, H.-L., P. Ross, P. and Corne, D., A promising GA approach to job-shop scheduling, rescheduling and open-shop scheduling problems. In Proc. 5th Int. Conf. on Genetic Algorithms, ed. S. Forest. Morgan Kaufmann, Fairfax, Virginia, 1993, pp. 375-382.
    • (1993) Proc. 5th Int. Conf. on Genetic Algorithms , pp. 375-382
    • Fang, H.-L.1    Ross, P.P.2    Corne, D.3
  • 33
    • 0007634676 scopus 로고
    • Joint lot sizing and sequencing with GAs for scheduling: Evolving the chromosome structure
    • ed. S. Forest. Morgan Kaufmann, Fairfax, Virginia
    • Lee, I., Sikora, R. and Shaw, M. J., Joint lot sizing and sequencing with GAs for scheduling: Evolving the chromosome structure. In Proc. 5th Int. Conf. on Genetic Algorithms, ed. S. Forest. Morgan Kaufmann, Fairfax, Virginia, 1993, pp. 383-389.
    • (1993) Proc. 5th Int. Conf. on Genetic Algorithms , pp. 383-389
    • Lee, I.1    Sikora, R.2    Shaw, M.J.3
  • 34
    • 0022559425 scopus 로고
    • Optimization of control parameters for genetic algorithms
    • Grefenstette, J. J., Optimization of control parameters for genetic algorithms. IEEE Trans. Systems Man and Cybernetics, 1986, SMC-16, 122-128.
    • (1986) IEEE Trans. Systems Man and Cybernetics , vol.SMC-16 , pp. 122-128
    • Grefenstette, J.J.1
  • 35
    • 0001650502 scopus 로고
    • Sizing populations for serial and parallel genetic algorithms
    • ed. D. J. Schaffer. Morgan Kaufmann, Fairfax, Virginia
    • Goldberg, D. E., Sizing populations for serial and parallel genetic algorithms. In Proc. 3rd Int. Conf. on Genetic Algorithms, ed. D. J. Schaffer. Morgan Kaufmann, Fairfax, Virginia, 1989, pp. 70-79.
    • (1989) Proc. 3rd Int. Conf. on Genetic Algorithms , pp. 70-79
    • Goldberg, D.E.1
  • 36
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • Baker, K. R. and Scudder, G. D., Sequencing with earliness and tardiness penalties: A review. Opns Res., 1990, 38, 22-36.
    • (1990) Opns Res. , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 37
    • 0024765468 scopus 로고
    • A bottleneck based beam search for job scheduling in a flexible manufacturing system
    • Chang, Y. L., Matsua, H. and Sullivan, R., A bottleneck based beam search for job scheduling in a flexible manufacturing system. Int. J. Prod. Res., 1989, 27, 1949-1963.
    • (1989) Int. J. Prod. Res. , vol.27 , pp. 1949-1963
    • Chang, Y.L.1    Matsua, H.2    Sullivan, R.3
  • 38
    • 0025568585 scopus 로고
    • Performance of dispatch rules under perfect sequence flexibility
    • eds O. Balci, R. Sadowski and R. E. Nance.
    • Rachamadugu, R. and Schriber, T. J., Performance of dispatch rules under perfect sequence flexibility. In Proc. of the Winter Simulation Conf., eds O. Balci, R. Sadowski and R. E. Nance. 1990, pp. 653-658.
    • (1990) Proc. of the Winter Simulation Conf. , pp. 653-658
    • Rachamadugu, R.1    Schriber, T.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.