메뉴 건너뛰기




Volumn 115, Issue 1-4, 2002, Pages 173-191

An improved hybrid model for the generic hoist scheduling problem

Author keywords

Benchmarks; Hoist scheduling; Hybrid methods; Modelling

Indexed keywords


EID: 0036437171     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1023/A:1021101321339     Document Type: Article
Times cited : (20)

References (37)
  • 1
    • 0011744221 scopus 로고
    • A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints
    • Rutgers University
    • R. Armstrong, L. Lei and S. Gu, A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints, GSM Working Paper 92-07, Rutgers University (1992).
    • (1992) GSM Working Paper 92-07
    • Armstrong, R.1    Lei, L.2    Gu, S.3
  • 9
    • 0031142587 scopus 로고    scopus 로고
    • Scheduling in robotic cells: Classification, two and three machine cells
    • N. Hall, H. Kamoun and C. Sriskandarajah, Scheduling in robotic cells: classification, two and three machine cells, Operations Research 45 (1997) 421-439.
    • (1997) Operations Research , vol.45 , pp. 421-439
    • Hall, N.1    Kamoun, H.2    Sriskandarajah, C.3
  • 10
    • 0028766191 scopus 로고
    • Study of a NP-hard cyclic scheduling problem: The recurrent job-shop
    • C. Hanen, Study of a NP-hard cyclic scheduling problem: the recurrent job-shop, European Journal of Operations Research 72 (1994) 82-101.
    • (1994) European Journal of Operations Research , vol.72 , pp. 82-101
    • Hanen, C.1
  • 11
    • 0042874655 scopus 로고
    • Pilotage periodique d'une ligne de galvanoplastie à plusieurs robots
    • C. Hanen and A. Munier, Pilotage periodique d'une ligne de galvanoplastie à plusieurs robots, Research report, LITP (1994).
    • (1994) Research Report, LITP
    • Hanen, C.1    Munier, A.2
  • 14
    • 0031540827 scopus 로고    scopus 로고
    • Minimizing the number of robots to meet a given cyclic structure
    • V. Kats and E. Levner, Minimizing the number of robots to meet a given cyclic structure, Annals of Operations Research 69 (1997) 209-226.
    • (1997) Annals of Operations Research , vol.69 , pp. 209-226
    • Kats, V.1    Levner, E.2
  • 18
    • 0027663342 scopus 로고
    • Minimizing the fleet size with dependent time-window and single-track constraints
    • L. Lei, R. Armstrong and S. Gu, Minimizing the fleet size with dependent time-window and single-track constraints, Operations Research Letters 14 (1993) 91-98.
    • (1993) Operations Research Letters , vol.14 , pp. 91-98
    • Lei, L.1    Armstrong, R.2    Gu, S.3
  • 19
    • 0000402860 scopus 로고
    • The minimum common-cycle algorithm for cycle scheduling of two material handling hoists with time window constraints
    • L. Lei and T Wang, The minimum common-cycle algorithm for cycle scheduling of two material handling hoists with time window constraints, Management Science 37(12) (1991) 1629-1639.
    • (1991) Management Science , vol.37 , Issue.12 , pp. 1629-1639
    • Lei, L.1    Wang, T.2
  • 20
    • 0028396353 scopus 로고
    • Determining optimal cyclic hoist schedules in a single hoist electroplating line
    • L. Lei and T. Wang, Determining optimal cyclic hoist schedules in a single hoist electroplating line, IEE Transactions 26(2) (1994) 25-33.
    • (1994) IEE Transactions , vol.26 , Issue.2 , pp. 25-33
    • Lei, L.1    Wang, T.2
  • 24
    • 0031375139 scopus 로고    scopus 로고
    • A genetic algorithm for a single hoist scheduling in the printed circuit board electroplating line
    • J.-M. Lim, A genetic algorithm for a single hoist scheduling in the printed circuit board electroplating line, Computers in Industrial Engineering 33(3-4) (1997) 789-792.
    • (1997) Computers in Industrial Engineering , vol.33 , Issue.3-4 , pp. 789-792
    • Lim, J.-M.1
  • 25
    • 0032268607 scopus 로고    scopus 로고
    • A practical algorithm for cyclic hoist scheduling in a PCB manufacturing facility
    • R. Mak, K. Lam and S.M. Gupta, A practical algorithm for cyclic hoist scheduling in a PCB manufacturing facility, Journal of Electronics Manufacturing 8(3/4) (1998) 193-207.
    • (1998) Journal of Electronics Manufacturing , vol.8 , Issue.3-4 , pp. 193-207
    • Mak, R.1    Lam, K.2    Gupta, S.M.3
  • 27
    • 0034175276 scopus 로고    scopus 로고
    • Constraint based model for cyclic multi-hoist scheduling problem
    • M. Manier, C. Varnier and P. Baptiste, Constraint based model for cyclic multi-hoist scheduling problem, Production Planning and Control 11(3) (2000) 244-257.
    • (2000) Production Planning and Control , vol.11 , Issue.3 , pp. 244-257
    • Manier, M.1    Varnier, C.2    Baptiste, P.3
  • 28
    • 0031186888 scopus 로고    scopus 로고
    • Determining the optimal move times for a given cyclic schedule of a material handling hoist
    • W. Ng and J. Leung, Determining the optimal move times for a given cyclic schedule of a material handling hoist, Computers in Industrial Engineering 32(3) (1997) 595-606.
    • (1997) Computers in Industrial Engineering , vol.32 , Issue.3 , pp. 595-606
    • Ng, W.1    Leung, J.2
  • 30
    • 0016962332 scopus 로고
    • Mathematical programming solution of a hoist scheduling problem
    • L. Phillips and P. Unger, Mathematical programming solution of a hoist scheduling problem, AIIE Transactions 8(2) (1976) 219-255.
    • (1976) AIIE Transactions , vol.8 , Issue.2 , pp. 219-255
    • Phillips, L.1    Unger, P.2
  • 32
    • 0042094661 scopus 로고    scopus 로고
    • A new approach to integrating mixed integer programming with constraint logic programming
    • R. Rodošek, M. Wallace and M. Hajian, A new approach to integrating mixed integer programming with constraint logic programming, Annals of Operations Research 86 (1997) 63-87.
    • (1997) Annals of Operations Research , vol.86 , pp. 63-87
    • Rodošek, R.1    Wallace, M.2    Hajian, M.3
  • 33
    • 0024029390 scopus 로고
    • Hoist scheduling for a PCB electroplating facility
    • G. Shapiro and H. Nuttle, Hoist scheduling for a PCB electroplating facility, IIE Transactions 20(2) (1988) 157-167.
    • (1988) IIE Transactions , vol.20 , Issue.2 , pp. 157-167
    • Shapiro, G.1    Nuttle, H.2
  • 34
  • 37
    • 0027562597 scopus 로고
    • Robot scheduling in a circuit board production line, an OR/ANN approach
    • Y. Yih, T. Liang and H. Moskowitz, Robot scheduling in a circuit board production line, an OR/ANN approach, IIE Transactions 25(2) (1993) 26-33.
    • (1993) IIE Transactions , vol.25 , Issue.2 , pp. 26-33
    • Yih, Y.1    Liang, T.2    Moskowitz, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.