-
1
-
-
0011744221
-
A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints
-
Rutgers University
-
R. Armstrong, L. Lei and S. Gu, A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints, GSM Working Paper 92-07, Rutgers University (1992).
-
(1992)
GSM Working Paper 92-07
-
-
Armstrong, R.1
Lei, L.2
Gu, S.3
-
2
-
-
84872996412
-
Creating and evaluating hybrid algorithms for inventory management problems
-
P. Baptiste, Y. Caseau, T Kökény, C. Le Pape and R. Rodošek, Creating and evaluating hybrid algorithms for inventory management problems, Journées Nationales sur la Résolution Pratique de Problèmes NP-Complets (1998).
-
(1998)
Journées Nationales sur la Résolution Pratique de Problèmes NP-Complets
-
-
Baptiste, P.1
Caseau, Y.2
Kökény, T.3
Le Pape, C.4
Rodošek, R.5
-
9
-
-
0031142587
-
Scheduling in robotic cells: Classification, two and three machine cells
-
N. Hall, H. Kamoun and C. Sriskandarajah, Scheduling in robotic cells: classification, two and three machine cells, Operations Research 45 (1997) 421-439.
-
(1997)
Operations Research
, vol.45
, pp. 421-439
-
-
Hall, N.1
Kamoun, H.2
Sriskandarajah, C.3
-
10
-
-
0028766191
-
Study of a NP-hard cyclic scheduling problem: The recurrent job-shop
-
C. Hanen, Study of a NP-hard cyclic scheduling problem: the recurrent job-shop, European Journal of Operations Research 72 (1994) 82-101.
-
(1994)
European Journal of Operations Research
, vol.72
, pp. 82-101
-
-
Hanen, C.1
-
11
-
-
0042874655
-
Pilotage periodique d'une ligne de galvanoplastie à plusieurs robots
-
C. Hanen and A. Munier, Pilotage periodique d'une ligne de galvanoplastie à plusieurs robots, Research report, LITP (1994).
-
(1994)
Research Report, LITP
-
-
Hanen, C.1
Munier, A.2
-
12
-
-
0034155409
-
A scheme for unifying optimization and constraint satisfaction methods
-
J. Hooker, G. Ottosson, E. Thorsteinsson and H.-J. Kim, A scheme for unifying optimization and constraint satisfaction methods, Knowledge Engineering Review, Special issue on AI/OR 15(1) (2000) 11-30.
-
(2000)
Knowledge Engineering Review, Special Issue on AI/OR
, vol.15
, Issue.1
, pp. 11-30
-
-
Hooker, J.1
Ottosson, G.2
Thorsteinsson, E.3
Kim, H.-J.4
-
14
-
-
0031540827
-
Minimizing the number of robots to meet a given cyclic structure
-
V. Kats and E. Levner, Minimizing the number of robots to meet a given cyclic structure, Annals of Operations Research 69 (1997) 209-226.
-
(1997)
Annals of Operations Research
, vol.69
, pp. 209-226
-
-
Kats, V.1
Levner, E.2
-
18
-
-
0027663342
-
Minimizing the fleet size with dependent time-window and single-track constraints
-
L. Lei, R. Armstrong and S. Gu, Minimizing the fleet size with dependent time-window and single-track constraints, Operations Research Letters 14 (1993) 91-98.
-
(1993)
Operations Research Letters
, vol.14
, pp. 91-98
-
-
Lei, L.1
Armstrong, R.2
Gu, S.3
-
19
-
-
0000402860
-
The minimum common-cycle algorithm for cycle scheduling of two material handling hoists with time window constraints
-
L. Lei and T Wang, The minimum common-cycle algorithm for cycle scheduling of two material handling hoists with time window constraints, Management Science 37(12) (1991) 1629-1639.
-
(1991)
Management Science
, vol.37
, Issue.12
, pp. 1629-1639
-
-
Lei, L.1
Wang, T.2
-
20
-
-
0028396353
-
Determining optimal cyclic hoist schedules in a single hoist electroplating line
-
L. Lei and T. Wang, Determining optimal cyclic hoist schedules in a single hoist electroplating line, IEE Transactions 26(2) (1994) 25-33.
-
(1994)
IEE Transactions
, vol.26
, Issue.2
, pp. 25-33
-
-
Lei, L.1
Wang, T.2
-
22
-
-
0141779937
-
An improved algorithm for a cyclic robot scheduling problem
-
ed. E. Levner, CTEH
-
E. Levner, V. Kats and V. Levit, An improved algorithm for a cyclic robot scheduling problem, in: Intelligent Scheduling of Robots and Flexible Manufacturing Systems, ed. E. Levner, CTEH (1995) pp. 129-141.
-
(1995)
Intelligent Scheduling of Robots and Flexible Manufacturing Systems
, pp. 129-141
-
-
Levner, E.1
Kats, V.2
Levit, V.3
-
23
-
-
0013188060
-
A geometric algorithm for finding two-unit cyclic schedules in a no-wait robotic flowshop
-
ed. E. Levner, CTEH
-
E. Levner, V. Kats and C. Sriskandarajah, A geometric algorithm for finding two-unit cyclic schedules in a no-wait robotic flowshop, in: Intelligent Scheduling of Robots and Flexible Manufacturing Systems II, ed. E. Levner, CTEH (1996) pp. 101-112.
-
(1996)
Intelligent Scheduling of Robots and Flexible Manufacturing Systems II
, pp. 101-112
-
-
Levner, E.1
Kats, V.2
Sriskandarajah, C.3
-
24
-
-
0031375139
-
A genetic algorithm for a single hoist scheduling in the printed circuit board electroplating line
-
J.-M. Lim, A genetic algorithm for a single hoist scheduling in the printed circuit board electroplating line, Computers in Industrial Engineering 33(3-4) (1997) 789-792.
-
(1997)
Computers in Industrial Engineering
, vol.33
, Issue.3-4
, pp. 789-792
-
-
Lim, J.-M.1
-
25
-
-
0032268607
-
A practical algorithm for cyclic hoist scheduling in a PCB manufacturing facility
-
R. Mak, K. Lam and S.M. Gupta, A practical algorithm for cyclic hoist scheduling in a PCB manufacturing facility, Journal of Electronics Manufacturing 8(3/4) (1998) 193-207.
-
(1998)
Journal of Electronics Manufacturing
, vol.8
, Issue.3-4
, pp. 193-207
-
-
Mak, R.1
Lam, K.2
Gupta, S.M.3
-
27
-
-
0034175276
-
Constraint based model for cyclic multi-hoist scheduling problem
-
M. Manier, C. Varnier and P. Baptiste, Constraint based model for cyclic multi-hoist scheduling problem, Production Planning and Control 11(3) (2000) 244-257.
-
(2000)
Production Planning and Control
, vol.11
, Issue.3
, pp. 244-257
-
-
Manier, M.1
Varnier, C.2
Baptiste, P.3
-
28
-
-
0031186888
-
Determining the optimal move times for a given cyclic schedule of a material handling hoist
-
W. Ng and J. Leung, Determining the optimal move times for a given cyclic schedule of a material handling hoist, Computers in Industrial Engineering 32(3) (1997) 595-606.
-
(1997)
Computers in Industrial Engineering
, vol.32
, Issue.3
, pp. 595-606
-
-
Ng, W.1
Leung, J.2
-
30
-
-
0016962332
-
Mathematical programming solution of a hoist scheduling problem
-
L. Phillips and P. Unger, Mathematical programming solution of a hoist scheduling problem, AIIE Transactions 8(2) (1976) 219-255.
-
(1976)
AIIE Transactions
, vol.8
, Issue.2
, pp. 219-255
-
-
Phillips, L.1
Unger, P.2
-
32
-
-
0042094661
-
A new approach to integrating mixed integer programming with constraint logic programming
-
R. Rodošek, M. Wallace and M. Hajian, A new approach to integrating mixed integer programming with constraint logic programming, Annals of Operations Research 86 (1997) 63-87.
-
(1997)
Annals of Operations Research
, vol.86
, pp. 63-87
-
-
Rodošek, R.1
Wallace, M.2
Hajian, M.3
-
33
-
-
0024029390
-
Hoist scheduling for a PCB electroplating facility
-
G. Shapiro and H. Nuttle, Hoist scheduling for a PCB electroplating facility, IIE Transactions 20(2) (1988) 157-167.
-
(1988)
IIE Transactions
, vol.20
, Issue.2
, pp. 157-167
-
-
Shapiro, G.1
Nuttle, H.2
-
36
-
-
0008941947
-
Resolution of the cyclic multi-hoists scheduling problem with overlapping partitions
-
C. Varnier, A. Bachelu and to Baptiste, Resolution of the cyclic multi-hoists scheduling problem with overlapping partitions, INFOR, Special Issue on Intelligent Scheduling of Robots 35(4) (1997) 309-324.
-
(1997)
INFOR, Special Issue on Intelligent Scheduling of Robots
, vol.35
, Issue.4
, pp. 309-324
-
-
Varnier, C.1
Bachelu, A.2
Baptiste, P.3
-
37
-
-
0027562597
-
Robot scheduling in a circuit board production line, an OR/ANN approach
-
Y. Yih, T. Liang and H. Moskowitz, Robot scheduling in a circuit board production line, an OR/ANN approach, IIE Transactions 25(2) (1993) 26-33.
-
(1993)
IIE Transactions
, vol.25
, Issue.2
, pp. 26-33
-
-
Yih, Y.1
Liang, T.2
Moskowitz, H.3
|