메뉴 건너뛰기




Volumn 47, Issue 1, 2004, Pages 91-101

A constraint propagation heuristic for the single-hoist, multiple-products scheduling problem

Author keywords

Backtracking; Constraint satisfaction problem; Heuristics; Hoist scheduling

Indexed keywords

ALGORITHMS; COMPUTATIONAL METHODS; HOISTS; PLATING; PROBLEM SOLVING; SCHEDULING; SMELTING;

EID: 3242735620     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2004.03.002     Document Type: Article
Times cited : (35)

References (12)
  • 1
    • 0021466185 scopus 로고
    • Towards a general theory of actions and time
    • Allen J.F. Towards a general theory of actions and time. Artificial Intelligence. 23:1984;123-154.
    • (1984) Artificial Intelligence , vol.23 , pp. 123-154
    • Allen, J.F.1
  • 2
    • 0031517380 scopus 로고    scopus 로고
    • Applying constraint satisfaction techniques to job shop scheduling
    • Cheng C., Smith S. Applying constraint satisfaction techniques to job shop scheduling. Annals of Operations Research. 70:1997;327-357.
    • (1997) Annals of Operations Research , vol.70 , pp. 327-357
    • Cheng, C.1    Smith, S.2
  • 3
    • 0031375139 scopus 로고    scopus 로고
    • A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating line
    • Lim J. A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating line. Computers and Industrial Engineering. 33:(3/4):1997;789-792.
    • (1997) Computers and Industrial Engineering , vol.33 , Issue.3-4 , pp. 789-792
    • Lim, J.1
  • 5
    • 0029770852 scopus 로고    scopus 로고
    • A branch and bound algorithm for hoist scheduling of a circuit board production line
    • NG W. A branch and bound algorithm for hoist scheduling of a circuit board production line. The International Journal of Flexible Manufacturing systems. 8:1996;45-65.
    • (1996) The International Journal of Flexible Manufacturing Systems , vol.8 , pp. 45-65
    • Ng, W.1
  • 6
    • 0024029390 scopus 로고
    • Hoist scheduling for a pcb electroplating facility
    • Shapiro G., Nuttle H. Hoist scheduling for a pcb electroplating facility. IIE Transactions. 20:(2):1988;157-167.
    • (1988) IIE Transactions , vol.20 , Issue.2 , pp. 157-167
    • Shapiro, G.1    Nuttle, H.2
  • 8
    • 0000168684 scopus 로고
    • An expert scheduling for material handling hoists
    • Thesen A., Lei L. An expert scheduling for material handling hoists. Journal of Manufacturing Systems. 9:(3):1990;247-252.
    • (1990) Journal of Manufacturing Systems , vol.9 , Issue.3 , pp. 247-252
    • Thesen, A.1    Lei, L.2
  • 10
    • 0016962332 scopus 로고
    • Mathematical programming solution of a hoist scheduling problem
    • Unger P., Philips L. Mathematical programming solution of a hoist scheduling problem. AIEE Transactions. 8:(2):1976;219-225.
    • (1976) AIEE Transactions , vol.8 , Issue.2 , pp. 219-225
    • Unger, P.1    Philips, L.2
  • 11
    • 0008941947 scopus 로고    scopus 로고
    • Resolution of the cyclic multi-hoists scheduling problem with overlapping partitions
    • Varnier C., Bachelu A., Baptiste P. Resolution of the cyclic multi-hoists scheduling problem with overlapping partitions. INFOR. 35:(4):1997;309-324.
    • (1997) INFOR , vol.35 , Issue.4 , pp. 309-324
    • Varnier, C.1    Bachelu, A.2    Baptiste, P.3
  • 12
    • 0028395989 scopus 로고
    • An algorithm for hoist scheduling problem
    • Yih Y. An algorithm for hoist scheduling problem. International Journal of Production Research. 32:(3):1994;501-516.
    • (1994) International Journal of Production Research , vol.32 , Issue.3 , pp. 501-516
    • Yih, Y.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.