메뉴 건너뛰기




Volumn 30, Issue 2, 2006, Pages 156-167

A contract net based intelligent agent system for solving the reactive hoist scheduling problem

Author keywords

Contract net protocol; Cooperative systems; Hoist scheduling problem; Multi agent systems

Indexed keywords

MULTI AGENT SYSTEMS; PROBLEM SOLVING; SCHEDULING;

EID: 28544441283     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2005.06.019     Document Type: Article
Times cited : (25)

References (22)
  • 2
    • 0033280134 scopus 로고    scopus 로고
    • Cooperation and coordination between fuzzy reinforcement learning agents in continuous state partially observable markov decision processes
    • IEEE
    • Berenji, H.R., Vengerov, D. (1999). Cooperation and coordination between fuzzy reinforcement learning agents in continuous state partially observable markov decision processes, in: 1999 IEEE International Fuzzy Systems Conference Proceedings, Vol. 2, IEEE, (pp. 621-628).
    • (1999) 1999 IEEE International Fuzzy Systems Conference Proceedings , vol.2 , pp. 621-628
    • Berenji, H.R.1    Vengerov, D.2
  • 3
    • 0032599497 scopus 로고    scopus 로고
    • Agent-based shop-floor scheduling of multistage systems
    • A. Brun, and A. Portioli Agent-based shop-floor scheduling of multistage systems Computers and Industrial Engineering 37 1999 457 460
    • (1999) Computers and Industrial Engineering , vol.37 , pp. 457-460
    • Brun, A.1    Portioli, A.2
  • 4
    • 0034297657 scopus 로고    scopus 로고
    • Multi-agent systems in production planning and control: An application to the scheduling of mixed-model assembly lines
    • M. Caridi, and A. Sianesi Multi-agent systems in production planning and control: an application to the scheduling of mixed-model assembly lines International Journal of Production Economics 20 2000 29 42
    • (2000) International Journal of Production Economics , vol.20 , pp. 29-42
    • Caridi, M.1    Sianesi, A.2
  • 5
    • 0034298926 scopus 로고    scopus 로고
    • An experimental benchmarking of two multi-agent architectures for production scheduling and control
    • S. Cavalieri, M. Garetti, M. Macchi, and M. Taisch An experimental benchmarking of two multi-agent architectures for production scheduling and control Computers in Industry 43 2000 139 152
    • (2000) Computers in Industry , vol.43 , pp. 139-152
    • Cavalieri, S.1    Garetti, M.2    MacChi, M.3    Taisch, M.4
  • 8
    • 0033617056 scopus 로고    scopus 로고
    • Agent-based design of holonic manufacturing systems
    • K. Fischer Agent-based design of holonic manufacturing systems Robotics and Autonomous Systems 27 1999 3 13
    • (1999) Robotics and Autonomous Systems , Issue.27 , pp. 3-13
    • Fischer, K.1
  • 13
    • 0036437171 scopus 로고    scopus 로고
    • An improved hybrid model for the generic hoist scheduling problem
    • D. Riera, and N. Yorke-Smith An improved hybrid model for the generic hoist scheduling problem Annals of Operations Research 115 1-4 2002 173 191
    • (2002) Annals of Operations Research , vol.115 , Issue.1-4 , pp. 173-191
    • Riera, D.1    Yorke-Smith, N.2
  • 14
    • 0011773057 scopus 로고
    • An implementation of the contract net protocol based on marginal cost calculations
    • Hidden Valley, Pennsylvania URL citeseer.nj.nec.com/ sandholm93implementation.html
    • Sandholm, T.W. (1993). An implementation of the contract net protocol based on marginal cost calculations, in: Proceedings of the 12th International Workshop on Distributed Artificial Intelligence, Hidden Valley, Pennsylvania (pp. 295-308). URL citeseer.nj.nec.com/sandholm93implementation.html.
    • (1993) Proceedings of the 12th International Workshop on Distributed Artificial Intelligence , pp. 295-308
    • Sandholm, T.W.1
  • 15
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication and control in distributed problem solver
    • R.G. Smith The contract net protocol: High-level communication and control in distributed problem solver IEEE Transactions on Computer C-29 12 1980 1104 1113
    • (1980) IEEE Transactions on Computer , vol.C-29 , Issue.12 , pp. 1104-1113
    • Smith, R.G.1
  • 16
    • 0028317755 scopus 로고
    • A study of heuristics for bidirectionnal multi-hoist production scheduling systems
    • T. Sun, K. Lai, K. Lam, and K. So A study of heuristics for bidirectionnal multi-hoist production scheduling systems International Journal of Production Economics 33 1994 207 214
    • (1994) International Journal of Production Economics , vol.33 , pp. 207-214
    • Sun, T.1    Lai, K.2    Lam, K.3    So, K.4
  • 17
    • 0000168684 scopus 로고
    • An expert scheduling system for material handling hoists
    • A. Thesen, and L. Lei An expert scheduling system for material handling hoists Journal of Manufacturing Systems 9 3 1990 247 252
    • (1990) Journal of Manufacturing Systems , vol.9 , Issue.3 , pp. 247-252
    • Thesen, A.1    Lei, L.2
  • 18
    • 0026254010 scopus 로고
    • Semi-markov decision models for real-time scheduling
    • Y. Yih, and A. Thesen Semi-markov decision models for real-time scheduling International Journal of Production Research 29 11 1991 2331 2346
    • (1991) International Journal of Production Research , vol.29 , Issue.11 , pp. 2331-2346
    • Yih, Y.1    Thesen, A.2
  • 19
    • 0003965419 scopus 로고
    • Learning real-time scheduling rules from optimal policy of semi-markov decision processes
    • Y. Yih Learning real-time scheduling rules from optimal policy of semi-markov decision processes International Journal of Computer Integrated Manufacturing 5 3 1992 171 181
    • (1992) International Journal of Computer Integrated Manufacturing , vol.5 , Issue.3 , pp. 171-181
    • Yih, Y.1
  • 20
    • 0027562597 scopus 로고
    • Robot scheduling in a circuit board production line: A hybrid or/ann approach
    • Y. Yih, T.-P. Liang, and H. Moskowitz Robot scheduling in a circuit board production line: a hybrid or/ann approach IIE Transactions 25 2 1993 26 33
    • (1993) IIE Transactions , vol.25 , Issue.2 , pp. 26-33
    • Yih, Y.1    Liang, T.-P.2    Moskowitz, H.3
  • 21
    • 0037404554 scopus 로고    scopus 로고
    • Single hoist cyclic scheduling with multiple tanks: A material handling solution
    • Z. Zhou, and L. Li Single hoist cyclic scheduling with multiple tanks: A material handling solution Computers and Operations Research 30 6 2003 811 819
    • (2003) Computers and Operations Research , vol.30 , Issue.6 , pp. 811-819
    • Zhou, Z.1    Li, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.