메뉴 건너뛰기




Volumn 51, Issue 10, 2013, Pages 2997-3017

Kanban number optimisation in a supermarket warehouse feeding a mixed-model assembly system

Author keywords

Assembly lines; Feeding; Kanban; Supermarket

Indexed keywords

ASSEMBLY LINE; DECISION VARIABLES; FEEDING SYSTEM; KANBAN; MIXED-MODEL ASSEMBLY SYSTEMS; OPTIMISATIONS; PRODUCTION MIX; SUPERMARKET;

EID: 84876319368     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2012.751516     Document Type: Article
Times cited : (49)

References (33)
  • 1
  • 3
    • 84868225520 scopus 로고    scopus 로고
    • Sequencing procedure for balancing the workloads variations in case of mixed model assembly system with multiple secondary feeder lines
    • Azzi, A., D. Battini, M. Faccio, and A. Persona. 2012a. "Sequencing procedure for balancing the workloads variations in case of mixed model assembly system with multiple secondary feeder lines." International Journal of Production Research 50 (18): 5132-5151.
    • (2012) International Journal of Production Research , vol.50 , Issue.18 , pp. 5132-5151
    • Azzi, A.1    Battini, D.2    Faccio, M.3    Persona, A.4
  • 4
    • 84867037593 scopus 로고    scopus 로고
    • Mixed model assembly system with multiple secondary feeder lines: Layout design and balancing procedure for ato environment
    • Azzi A., D. Battini, M. Faccio, and Persona A. 2012b. "Mixed Model Assembly System with Multiple Secondary Feeder Lines: Layout Design and Balancing Procedure for ATO Environment." International Journal of Production Research http://dx.doi.org/10.1080/00207543.2011.653590.
    • (2012) International Journal of Production Research
    • Azzi, A.1    Battini, D.2    Faccio, M.3    Persona, A.4
  • 5
    • 68949211423 scopus 로고    scopus 로고
    • Balancing-sequencing for a mixed model assembly system in case of finite buffer capacity
    • Battini, D., M. Faccio, A. Persona, and F. Sgarbossa. 2009a. "Balancing-sequencing for a mixed model assembly system in case of finite buffer capacity." Journal of Advanced Manufacturing Technology 44 (3-4): 345-359.
    • (2009) Journal of Advanced Manufacturing Technology , vol.44 , Issue.3-4 , pp. 345-359
    • Battini, D.1    Faccio, M.2    Persona, A.3    Sgarbossa, F.4
  • 9
    • 79951504916 scopus 로고    scopus 로고
    • A methodology for selecting assembly systems feeding Policy
    • Caputo, A.C., and M.P. Pelagagge. 2011. "A methodology for selecting assembly systems feeding Policy." Industrial Management & Data Systems 111 (1): 84-112.
    • (2011) Industrial Management & Data Systems , vol.111 , Issue.1 , pp. 84-112
    • Caputo, A.C.1    Pelagagge, M.P.2
  • 10
    • 0035944508 scopus 로고    scopus 로고
    • Effect of kanban size on just in time manufacturing system
    • Chan, F.T.S. 2001. "Effect of kanban size on just in time manufacturing system." Journal of Material Processing Technology 116: 146-160.
    • (2001) Journal of Material Processing Technology , vol.116 , pp. 146-160
    • Chan, F.T.S.1
  • 11
    • 0036642734 scopus 로고    scopus 로고
    • A dynamic part-feeding system for an automotive assembly line
    • Choi, W., and Y. Lee. 2002. "A dynamic part-feeding system for an automotive assembly line." Computers & Industrial Engineering 43: 123-134.
    • (2002) Computers & Industrial Engineering , vol.43 , pp. 123-134
    • Choi, W.1    Lee, Y.2
  • 12
    • 0009918617 scopus 로고    scopus 로고
    • Effect of correlated demands on safety stock centralization: Patterns of correlation versus degree of centralization
    • Das, C., and R. Tyagi. 1999. "Effect of correlated demands on safety stock centralization: patterns of correlation versus degree of centralization." Int. J. Bus. Logist. 20 (1): 205-213.
    • (1999) Int. J. Bus. Logist , vol.20 , Issue.1 , pp. 205-213
    • Das, C.1    Tyagi, R.2
  • 13
    • 0035295083 scopus 로고    scopus 로고
    • Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
    • Drexl, A., and A. Kimms. 2001. "Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints." Management Science 47 (3): 480-491.
    • (2001) Management Science , vol.47 , Issue.3 , pp. 480-491
    • Drexl, A.1    Kimms, A.2
  • 14
    • 80055039560 scopus 로고    scopus 로고
    • Optimally locating in house logistics areas to facilitate JIT-supply of mixed-model assembly lines
    • Emde, S., and N. Boysen. 2012a. "Optimally locating in house logistics areas to facilitate JIT-supply of mixed-model assembly lines." International Journal of Production Economics 135: 393-402.
    • (2012) International Journal of Production Economics , vol.135 , pp. 393-402
    • Emde, S.1    Boysen, N.2
  • 15
    • 80755186522 scopus 로고    scopus 로고
    • Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines
    • Emde, S., and N. Boysen. 2012b. "Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines." European Journal of Operational Research 217: 287-299.
    • (2012) European Journal of Operational Research , vol.217 , pp. 287-299
    • Emde, S.1    Boysen, N.2
  • 16
    • 84856698416 scopus 로고    scopus 로고
    • Optimally loading tow trains for JIT-supply of mixed-model assembly lines
    • Emde, S., M. Fliedner, and N. Boysen. 2012. "Optimally loading tow trains for JIT-supply of mixed-model assembly lines." IIE Transactions 44: 121-135.
    • (2012) IIE Transactions , vol.44 , pp. 121-135
    • Emde, S.1    Fliedner, M.2    Boysen, N.3
  • 17
    • 0028396352 scopus 로고
    • Lot sizing in assembly systems with random component yields
    • Gerchak, Yigal, Yunzeng Wang, and Candace A. Yano. 1994. "Lot Sizing in Assembly Systems with Random Component Yields." IIE Transactions 26 (2): 19-26.
    • (1994) IIE Transactions , vol.26 , Issue.2 , pp. 19-26
    • Yigal, G.1    Wang, Y.2    Yano, C.A.3
  • 19
    • 74549216440 scopus 로고    scopus 로고
    • Research issues on factors influencing the choice of kitting versus line stocking
    • Huaa, S. Y., and D. J. Johnson. 2010. "Research issues on factors influencing the choice of kitting versus line stocking." International Journal of Production Research 48 (3): 779-800.
    • (2010) International Journal of Production Research , vol.48 , Issue.3 , pp. 779-800
    • Huaa, S.Y.1    Johnson, D.J.2
  • 20
    • 0037501430 scopus 로고    scopus 로고
    • Improving the performance of Job shop manufacturing with demand-pull production control by reducing setup/processing time variability
    • Jing-wen-Li. 2003. "Improving the performance of Job shop manufacturing with demand-pull production control by reducing setup/processing time variability." International Journal of Production Economics 84: 255-270.
    • (2003) International Journal of Production Economics , vol.84 , pp. 255-270
    • Jing-Wen-Li1
  • 24
    • 0035546214 scopus 로고    scopus 로고
    • Optimal just in time buffer inventory for regular preventive maintenance
    • Salameh, M. K., and R. E. Ghattas. 2001. "Optimal Just in Time buffer inventory for regular preventive maintenance." International Journal of Production Economics 74: 157-161.
    • (2001) International Journal of Production Economics , vol.74 , pp. 157-161
    • Salameh, M.K.1    Ghattas, R.E.2
  • 25
    • 0032708083 scopus 로고    scopus 로고
    • Operations planning for a multi-stage kanban system
    • Sarker, B., and C. V. Balan. 1999. "Operations planning for a multi-stage kanban system." European Journal of Operational Research 112 (2): 284-303.
    • (1999) European Journal of Operational Research , vol.112 , Issue.2 , pp. 284-303
    • Sarker, B.1    Balan, C.V.2
  • 28
    • 0031273822 scopus 로고    scopus 로고
    • Scheduling in kanban-controlled flow shop with dual blocking mechanisms and missing operations for part types
    • Sharadapriyadarshini, R., and C. Rajendran. 1997. "Scheduling in kanban-controlled flow shop with dual blocking mechanisms and missing operations for part types." International Journal of Production Research 35 (11): 3133-3156.
    • (1997) International Journal of Production Research , vol.35 , Issue.11 , pp. 3133-3156
    • Sharadapriyadarshini, R.1    Rajendran, C.2
  • 30
    • 0017557653 scopus 로고
    • Toyota production system and kanban system materialization of just-intime and respect-for-human system
    • Sugimori, Y., K. Kusunoki, F. Cho, and S. Uchikawa. 1977. "Toyota production system and kanban system materialization of just-intime and respect-for-human system." International Journal of Production Research 15 (6): 553-564.
    • (1977) International Journal of Production Research , vol.15 , Issue.6 , pp. 553-564
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikawa, S.4
  • 31
    • 0008917934 scopus 로고
    • Approximation approach for performance analysis production lines under a kanban discipline
    • Vito, A., M. Dassisti, and G.O. Okogbaa. 1995. "Approximation approach for performance analysis production lines under a kanban discipline." International Journal of Production Economics 40: 197-207.
    • (1995) International Journal of Production Economics , vol.40 , pp. 197-207
    • Vito, A.1    Dassisti, M.2    Okogbaa, G.O.3
  • 32
    • 0030818944 scopus 로고    scopus 로고
    • Algorithms for sequencing mixed models on an assembly line in a JIT Production system
    • Xiaobo, Z., and K. Ohno. 1997. "Algorithms for sequencing mixed models on an assembly line in a JIT Production system." Computers & Industrial Engineering 32 (1): 47-56.
    • (1997) Computers & Industrial Engineering , vol.32 , Issue.1 , pp. 47-56
    • Xiaobo, Z.1    Ohno, K.2
  • 33
    • 0001071723 scopus 로고
    • A kanban based simulation study of a mixed model just in time manufacture line
    • Yavuz, I. H., and A. Satir. 1995. "A kanban based simulation study of a mixed model just in time manufacture line." International Journal of Production Research 33 (4): 1027-1048.
    • (1995) International Journal of Production Research , vol.33 , Issue.4 , pp. 1027-1048
    • Yavuz, I.H.1    Satir, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.