Volumn 84, Issue 3, 2003, Pages 255-270

Improving the performance of job shop manufacturing with demand-pull production control by reducing set-up/processing time variability

Author keywords

Job shop; Just in Time; Kanban; Simulation modelling

Indexed keywords

COMPUTER SIMULATION; JUST IN TIME PRODUCTION; PRODUCTIVITY;

EID: 0037501430     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(02)00447-4     Document Type: Article
Times cited : (26)

References (22)
  • 1
    • 0002958207 scopus 로고
    • Performance of manufacturing cells for group technology: A parametric analysis
    • A.K. et al. Kamrani. Amsterdam: Elsevier Science
    • Agarwal A., Huq F., Sarkis J. Performance of manufacturing cells for group technology. A parametric analysis Kamrani A.K.et al. Planning, Design, and Analysis of Cellular Manufacturing Systems. 1995;299-349 Elsevier Science, Amsterdam.
    • (1995) Planning, Design, and Analysis of Cellular Manufacturing Systems , pp. 299-349
    • Agarwal, A.1    Huq, F.2    Sarkis, J.3
  • 3
    • 0002344815 scopus 로고
    • Simulation modelling and analysis of a JIT production system
    • Chaturvedi M., Golhar D.Y. Simulation modelling and analysis of a JIT production system. Production Planning and Control. 3(1):1992;81-92.
    • (1992) Production Planning and Control , vol.3 , Issue.1 , pp. 81-92
    • Chaturvedi, M.1    Golhar, D.Y.2
  • 4
    • 38249034192 scopus 로고
    • Repetitive lots: The use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops
    • Flynn B.B. Repetitive lots. The use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops Journal of Operations Management. 7(1&2):1987;203-216.
    • (1987) Journal of Operations Management , vol.7 , Issue.1-2 , pp. 203-216
    • Flynn, B.B.1
  • 5
    • 84985773741 scopus 로고
    • An experimental comparison of cellular (group technology) layout with process layout
    • Flynn B.B., Jacobs F.R. An experimental comparison of cellular (group technology) layout with process layout. Decision Sciences. 18(4):1987;562-581.
    • (1987) Decision Sciences , vol.18 , Issue.4 , pp. 562-581
    • Flynn, B.B.1    Jacobs, F.R.2
  • 7
    • 84989486136 scopus 로고
    • A simulation analysis of the Japanese just-in-time technique (with Kanbans) for a multiline, multistage production system
    • Huang P.Y., Rees L.P., Taylor III B.W. A simulation analysis of the Japanese just-in-time technique (with Kanbans) for a multiline, multistage production system. Decision Sciences. 14:1983;326-344.
    • (1983) Decision Sciences , vol.14 , pp. 326-344
    • Huang, P.Y.1    Rees, L.P.2    Taylor B.W. III3
  • 9
    • 84952179325 scopus 로고
    • Design and analysis of pull system, a method of multi-stage production control
    • Kimura O., Terada H. Design and analysis of pull system, a method of multi-stage production control. International Journal of Production Research. 19(3):1981;241-253.
    • (1981) International Journal of Production Research , vol.19 , Issue.3 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 13
    • 0025485232 scopus 로고
    • An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell
    • Mahmoodi F., Dooley K.J., Starr P.J. An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell. International Journal of Production Research. 29(9):1990;1695-1711.
    • (1990) International Journal of Production Research , vol.29 , Issue.9 , pp. 1695-1711
    • Mahmoodi, F.1    Dooley, K.J.2    Starr, P.J.3
  • 14
    • 0003449926 scopus 로고
    • Atlanta: Industrial Engineering and Management Press
    • Monden Y. Toyota Production System. 1983;Industrial Engineering and Management Press, Atlanta.
    • (1983) Toyota Production System
    • Monden, Y.1
  • 16
    • 0023310442 scopus 로고
    • An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans
    • Philipoom P.R., Rees L.P., Taylor III B.W., Huang P.Y. An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans. International Journal of Production Research. 25(3):1987;457-472.
    • (1987) International Journal of Production Research , vol.25 , Issue.3 , pp. 457-472
    • Philipoom, P.R.1    Rees, L.P.2    Taylor B.W. III3    Huang, P.Y.4
  • 19
    • 0025399180 scopus 로고
    • Designing a cellular manufacturing system: A material flow approach based on operation sequences
    • Vakharia A.J., Wemmerlöv U. Designing a cellular manufacturing system. A material flow approach based on operation sequences IIE Transactions. 22(1):1990;84-97.
    • (1990) IIE Transactions , vol.22 , Issue.1 , pp. 84-97
    • Vakharia, A.J.1    Wemmerlöv, U.2
  • 21
    • 0024108248 scopus 로고
    • Increasing the production rate of a just-in-time production system with variable operation times
    • Villeda R., Dudek R., Smith M.L. Increasing the production rate of a just-in-time production system with variable operation times. International Journal of Production Research. 26(11):1988;1749-1768.
    • (1988) International Journal of Production Research , vol.26 , Issue.11 , pp. 1749-1768
    • Villeda, R.1    Dudek, R.2    Smith, M.L.3
  • 22
    • 0001071723 scopus 로고
    • A Kanban-based simulation study of a mixed model just-in-time manufacturing line
    • Yavuz I.H., Şatir A. A Kanban-based simulation study of a mixed model just-in-time manufacturing line. International Journal of Production Research. 33(4):1995;1027-1048.
    • (1995) International Journal of Production Research , vol.33 , Issue.4 , pp. 1027-1048
    • Yavuz, I.H.1    Şatir, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.