메뉴 건너뛰기




Volumn 44, Issue 2, 2012, Pages 121-135

Optimally loading tow trains for just-in-time supply of mixed-model assembly lines

Author keywords

in process inventory; just in time; Mixed model assembly lines; tow trains

Indexed keywords

AUTOMOBILE MANUFACTURERS; COMPUTATIONAL STUDIES; IN-PROCESS; JUST IN TIME; LIMITED CAPACITY; LOADING PROBLEM; MIXED-MODEL ASSEMBLY LINES; POLYNOMIAL-TIME; PRODUCT MODELS; PRODUCT VARIETY; PRODUCTION PLANNING; RECENT TRENDS; SEQUENCING PROBLEMS; SHOP FLOOR; SOLUTION PROCEDURE; TOW TRAINS; VERTICAL INTEGRATION;

EID: 84856698416     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/0740817X.2011.575442     Document Type: Article
Times cited : (101)

References (22)
  • 1
    • 10444242132 scopus 로고    scopus 로고
    • Effective cross docking for improving distribution efficiencies
    • Apte, U.M. and Viswanathan, S. (2000) Effective cross docking for improving distribution efficiencies. International Journal of Logistics, 3, 91-302.
    • (2000) International Journal of Logistics , vol.3 , pp. 91-302
    • Apte, U.M.1    Viswanathan, S.2
  • 3
    • 0026108478 scopus 로고
    • A model for fleet sizing and vehicle allocation
    • Beaujon, G.J. and Turnquist, M.A. (1991) A model for fleet sizing and vehicle allocation. Transportation Science, 25, 19-45.
    • (1991) Transportation Science , vol.25 , pp. 19-45
    • Beaujon, G.J.1    Turnquist, M.A.2
  • 7
    • 51249121803 scopus 로고    scopus 로고
    • Sequencingmixed-model assembly lines: Survey, classification and model critique
    • Boysen,N., Fliedner, M. and Scholl, A. (2009c) Sequencingmixed-model assembly lines: Survey, classification and model critique. European Journal of Operational Research, 192, 349-373.
    • (2009) European Journal of Operational Research , vol.192 , pp. 349-373
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 8
    • 0002591207 scopus 로고    scopus 로고
    • The inventory routing problem
    • Crainic, T.G. and Laporte, G. (eds), Kluwer, Dordrecht, The Netherlands
    • Campbell, A., Clarke, L., Kleywegt, A. and Savelsbergh, M.W.P. (1998) The inventory routing problem, in Fleet Management and Logistics, Crainic, T.G. and Laporte, G. (eds). Kluwer, Dordrecht, The Netherlands, pp. 95-113.
    • (1998) Fleet Management and Logistics , pp. 95-113
    • Campbell, A.1    Clarke, L.2    Kleywegt, A.3    Savelsbergh, M.W.P.4
  • 13
    • 0026187108 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: part I
    • Hodgson, T.J. and Wang, D. (1991) Optimal hybrid push/pull control strategies for a parallel multistage system: Part I. International Journal of Production Research, 29, 1279-1287 (Pubitemid 21652852)
    • (1991) International Journal of Production Research , vol.29 , Issue.6 , pp. 1279-1287
    • Hodgson Thom, J.1    Wang Dingwei2
  • 14
    • 33847417402 scopus 로고    scopus 로고
    • The genealogy of lean production
    • DOI 10.1016/j.jom.2006.04.001, PII S0272696306000313, Special Issue Evolution of the Field of Operations Management SI/ Special Issue Organisation Theory and Supply Chain Management
    • Holweg, M. (2007) The genealogy of lean production. Journal of Operations Management, 25, 420-437. (Pubitemid 46341523)
    • (2007) Journal of Operations Management , vol.25 , Issue.2 , pp. 420-437
    • Holweg, M.1
  • 15
    • 0036474928 scopus 로고    scopus 로고
    • The stochastic inventory routing problem with direct deliveries
    • DOI 10.1287/trsc.36.1.94.574
    • Kleywegt, A.J., Nori, V.S. and Savelsbergh, M.W.P. (2002) The stochastic inventory routing problem with direct deliveries. Transportation Science, 36, 94-118. (Pubitemid 34268736)
    • (2002) Transportation Science , vol.36 , Issue.1 , pp. 94-118
    • Kleywegt, A.J.1    Nori, V.S.2    Savelsbergh, M.W.P.3
  • 16
    • 1642324107 scopus 로고    scopus 로고
    • Dynamic programming approximations for a stochastic inventory routing problem
    • Kleywegt, A.J., Nori, V.S. and Savelsbergh,M.W.P. (2004) Dynamic programming approximations for a stochastic inventory routing problem. Transportation Science, 38, 42-70.
    • (2004) Transportation Science , vol.38 , pp. 42-70
    • Kleywegt, A.J.1    Nori, V.S.2    Savelsbergh, M.W.P.3
  • 17
    • 8444229387 scopus 로고    scopus 로고
    • Facility location models for distribution system design
    • Klose, A. and Drexl, A. (2005) Facility location models for distribution system design. European Journal of Operational Research, 162, 4-29.
    • (2005) European Journal of Operational Research , vol.162 , pp. 4-29
    • Klose, A.1    Drexl, A.2
  • 18
    • 0027595182 scopus 로고
    • Minimizing variation of production rates in just-intime systems: A survey
    • Kubiak, W. (1993) Minimizing variation of production rates in just-intime systems: A survey. European Journal of Operational Research, 66, 259-271.
    • (1993) European Journal of Operational Research , vol.66 , pp. 259-271
    • Kubiak, W.1
  • 20
    • 0024715082 scopus 로고
    • A comparative analysis of an MRP lot-for-lot system and a kanban system for a multistage production operation
    • Norcoss, GA. Rees, L.P., Huang, P.Y. and Taylor, B.W. (1989) A comparative analysis of an MRP lot-for-lot system and a kanban system for a multistage production operation. International Journal of Production Research, 27, 1427-1443.
    • (1989) International Journal of Production Research , vol.27 , pp. 1427-1443
    • Norcoss, G.A.1    Rees, L.P.2    Huang, P.Y.3    Taylor, B.W.4
  • 21
    • 0029276615 scopus 로고
    • Production planning in a MRP/JIT repetitive manufacturing environment
    • Spencer, M. (1995) Production planning in a MRP/JIT repetitive manufacturing environment. Production Planning & Control, 6, 176-184.
    • (1995) Production Planning & Control , vol.6 , pp. 176-184
    • Spencer, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.