-
1
-
-
0032643432
-
Balancing and sequencing manual mixed-model assembly lines
-
C Merengo F Nava A Pozetti 1999 Balancing and sequencing manual mixed-model assembly lines Int J Prod Res 37 2835 2860
-
(1999)
Int J Prod Res
, vol.37
, pp. 2835-2860
-
-
Merengo, C.1
Nava, F.2
Pozetti, A.3
-
3
-
-
84946995620
-
Optimal buffer storage capacity in production line system
-
DR Anderson CL Moodie 1969 Optimal buffer storage capacity in production line system Int J Prod Res 7 233 240
-
(1969)
Int J Prod Res
, vol.7
, pp. 233-240
-
-
Anderson, D.R.1
Moodie, C.L.2
-
4
-
-
67651189730
-
The interstage buffer storage capacity of non-powered assembly lines, a simple mathematical approach
-
RN Basu 1977 The interstage buffer storage capacity of non-powered assembly lines, a simple mathematical approach Int J Prod Res 15 365 382
-
(1977)
Int J Prod Res
, vol.15
, pp. 365-382
-
-
Basu, R.N.1
-
5
-
-
0023981046
-
The role of work in process inventory in serial production lines
-
R Conway W Maxwell JO McClain LJ Thomas 1988 The role of work in process inventory in serial production lines Oper Res 36 299 241
-
(1988)
Oper Res
, vol.36
, pp. 299-241
-
-
Conway, R.1
Maxwell, W.2
McClain, J.O.3
Thomas, L.J.4
-
6
-
-
0024714288
-
Optimal inventory control in a production flow system with failures
-
WJ Hopp N Pati PC Jones 1989 Optimal inventory control in a production flow system with failures Int J Prod Res 27 1367 1384
-
(1989)
Int J Prod Res
, vol.27
, pp. 1367-1384
-
-
Hopp, W.J.1
Pati, N.2
Jones, P.C.3
-
7
-
-
29444437732
-
Optimizing total safety inventory or large transfer lines
-
AZ Szendrovitis GJ Miltenburg Z Goldstein 1990 Optimizing total safety inventory or large transfer lines OMEGA 18 299 313
-
(1990)
OMEGA
, vol.18
, pp. 299-313
-
-
Szendrovitis, A.Z.1
Miltenburg, G.J.2
Goldstein, Z.3
-
8
-
-
0001340484
-
Assembly line balancing with buffers by multiple criteria optimization
-
JLC Malakooti 1994 Assembly line balancing with buffers by multiple criteria optimization Int J Prod Res 32 2159 2178
-
(1994)
Int J Prod Res
, vol.32
, pp. 2159-2178
-
-
Malakooti, J.L.C.1
-
9
-
-
85135755631
-
The assembly line balancing problem
-
ME Salveson 1955 The assembly line balancing problem J Ind Eng 6 18 25
-
(1955)
J Ind Eng
, vol.6
, pp. 18-25
-
-
Salveson, M.E.1
-
11
-
-
0004807273
-
The mixed and multi model line balancing problem: A comparison
-
J De Fokkert T De Kok 1996 The mixed and multi model line balancing problem: a comparison Eur J Oper Res 100 399 412
-
(1996)
Eur J Oper Res
, vol.100
, pp. 399-412
-
-
De Fokkert, J.1
De Kok, T.2
-
12
-
-
68949198095
-
-
Battini D, Faccio M, Persona A, Sgarbossa F (2008) The mixed model assembly line balancing problem: evalutation of the balancing methodologies in presence of variability of task time and demand, GBID 2008, Proceeding
-
(2008)
The Mixed Model Assembly Line Balancing Problem: Evalutation of the Balancing Methodologies in Presence of Variability of Task Time and Demand, GBID 2008, Proceeding
-
-
Battini, D.1
Faccio, M.2
Persona, A.3
Sgarbossa, F.4
-
13
-
-
0040599941
-
-
R.E. Miller J.W. Thatcher (eds) Plenum New York
-
Karp RM (1972) Reducibility among combinatorial problems. In: Miller RE, Thatcher JW (eds) Complexity of computer computation. Plenum, New York, pp 85-103
-
(1972)
Reducibility among Combinatorial Problems
, pp. 85-103
-
-
Karp, R.M.1
-
14
-
-
0026851799
-
Branch and bound algorithms for the multi-product assembly line balancing problem
-
I Berger JM Bourjolly G Laporte 1992 Branch and bound algorithms for the multi-product assembly line balancing problem Eur J Oper Res 58 215 222
-
(1992)
Eur J Oper Res
, vol.58
, pp. 215-222
-
-
Berger, I.1
Bourjolly, J.M.2
Laporte, G.3
-
15
-
-
0001108060
-
Assembly line balancing using the ranked positional weight technique
-
WB Helgeson DP Bimie 1961 Assembly line balancing using the ranked positional weight technique J Ind Eng XII 6 394 398
-
(1961)
J Ind Eng
, vol.12
, Issue.6
, pp. 394-398
-
-
Helgeson, W.B.1
Bimie, D.P.2
-
16
-
-
0015483845
-
Production-line balances for mixed-model lines
-
JLC Macaskill 1972 Production-line balances for mixed-model lines Manage Sci 19 4 423 434
-
(1972)
Manage Sci
, vol.19
, Issue.4
, pp. 423-434
-
-
MacAskill, J.L.C.1
-
17
-
-
0000566084
-
Mixed model line balancing with smoothed station assignments
-
NT Thomopoulos 1970 Mixed model line balancing with smoothed station assignments Manage Sci 16 593 603
-
(1970)
Manage Sci
, vol.16
, pp. 593-603
-
-
Thomopoulos, N.T.1
-
18
-
-
40849130689
-
COMSOAL a computer method of sequencing operations for assembly lines
-
AL Arcus 1966 COMSOAL a computer method of sequencing operations for assembly lines Int J Prod Res 4 4 259 277
-
(1966)
Int J Prod Res
, vol.4
, Issue.4
, pp. 259-277
-
-
Arcus, A.L.1
-
19
-
-
0007642284
-
Assembly line balancing Let's remove the mystery
-
GH Milas 1990 Assembly line balancing Let's remove the mystery Ind Eng 22 5 31 36
-
(1990)
Ind Eng
, vol.22
, Issue.5
, pp. 31-36
-
-
Milas, G.H.1
-
20
-
-
84960656106
-
On a multiproduct assembly line-balancing problem
-
December
-
Roberts SD, Villa CD (1970) On a multiproduct assembly line-balancing problem. AIIE Transactions, December, 361-364
-
(1970)
AIIE Transactions
, pp. 361-364
-
-
Roberts, S.D.1
Villa, C.D.2
-
21
-
-
0016428867
-
Assembly line balancing, zero-one programming with Fibonacci search
-
JH Patterson JJ Albracht 1975 Assembly line balancing, zero-one programming with Fibonacci search Oper Res 23 166 172
-
(1975)
Oper Res
, vol.23
, pp. 166-172
-
-
Patterson, J.H.1
Albracht, J.J.2
-
22
-
-
0000363908
-
Sequencing mixed-model assembly lines to level parts usage and minimize line length
-
JF Bard A Shtub SB Joshi 1994 Sequencing mixed-model assembly lines to level parts usage and minimize line length Int J Prod Res 32 2431 2454
-
(1994)
Int J Prod Res
, vol.32
, pp. 2431-2454
-
-
Bard, J.F.1
Shtub, A.2
Joshi, S.B.3
-
24
-
-
0016974393
-
A cost model for optimal mix of balanced stochastic assembly line and the modular assembly system for a customer oriented production system
-
P Vrat A Virani 1976 A cost model for optimal mix of balanced stochastic assembly line and the modular assembly system for a customer oriented production system Int J Prod Res 14 445 463
-
(1976)
Int J Prod Res
, vol.14
, pp. 445-463
-
-
Vrat, P.1
Virani, A.2
-
25
-
-
68949212249
-
The product rate variation problem and its relevance in real world mixed model assembly lines
-
Friedrich-Schiller-Universitat Jena
-
Boysen N, Flieder M, Scholl A (2007a) The product rate variation problem and its relevance in real world mixed model assembly lines. Jena Research Papers in Business and Economics, Friedrich-Schiller-Universitat Jena, 1;1-11
-
(2007)
Jena Research Papers in Business and Economics
, vol.1
, pp. 1-11
-
-
Boysen, N.1
Flieder, M.2
Scholl, A.3
-
26
-
-
38349091243
-
Sequencing mixed-model assembly lines: Survey, classification and model critique
-
Friedrich-Schiller-Universitat Jena
-
Boysen N, Flieder M, Scholl A (2007b) Sequencing mixed-model assembly lines: survey, classification and model critique. Jena Research Papers in Business and Economics, Friedrich-Schiller-Universitat Jena, 2;1-33
-
(2007)
Jena Research Papers in Business and Economics
, vol.2
, pp. 1-33
-
-
Boysen, N.1
Flieder, M.2
Scholl, A.3
-
27
-
-
68949206361
-
Solving the car sequencing problem via Branch & Bound
-
Fliedner M, Boysen N (2007) Solving the car sequencing problem via Branch & Bound. Int J Oper Res, 2-20
-
(2007)
Int J Oper Res
, pp. 2-20
-
-
Fliedner, M.1
Boysen, N.2
-
28
-
-
0032120278
-
JIT sequencing for mixed-model assembly lines with setups using Tabu Search
-
PRM McMullen 1999 JIT sequencing for mixed-model assembly lines with setups using Tabu Search Prod Plan Control 9 5 504 510
-
(1999)
Prod Plan Control
, vol.9
, Issue.5
, pp. 504-510
-
-
McMullen, P.R.M.1
-
29
-
-
0032120699
-
A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines
-
CJ Hyun Y Kim YK Kim 1998 A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines Comput Oper Res 25 7/8 675 690
-
(1998)
Comput Oper Res
, vol.25
, Issue.7-8
, pp. 675-690
-
-
Hyun, C.J.1
Kim, Y.2
Kim, Y.K.3
-
30
-
-
0001169951
-
A simulated annealing approach to mixed-model sequencing with multiple objectives on a just-in-time line
-
PR McMullen GV Frazier 2000 A simulated annealing approach to mixed-model sequencing with multiple objectives on a just-in-time line IIE Trans 32 679 686
-
(2000)
IIE Trans
, vol.32
, pp. 679-686
-
-
McMullen, P.R.1
Frazier, G.V.2
-
31
-
-
33846576096
-
Balancing and sequencing mixed-model just-in-time U-lines with multiple objectives
-
DOI 10.1016/j.amc.2006.05.185, PII S0096300306007314
-
Y Kara U Ozcan A Peker 2007 Balancing and sequencing mixed-model just-in-time U-lines with multiple objectives Appl Math Comput 184 566 588 (Pubitemid 46176114)
-
(2007)
Applied Mathematics and Computation
, vol.184
, Issue.2
, pp. 566-588
-
-
Kara, Y.1
Ozcan, U.2
Peker, A.3
-
32
-
-
38749123964
-
Minimizing work overload in mixed-model assembly lines
-
J Bautista J Cano 2008 Minimizing work overload in mixed-model assembly lines Int J Prod Econ 112 177 191
-
(2008)
Int J Prod Econ
, vol.112
, pp. 177-191
-
-
Bautista, J.1
Cano, J.2
-
33
-
-
0034297657
-
Multi-agent system in production planning and control: An application to the scheduling of mixed-model assembly lines
-
M Caridi A Sianesi 1999 Multi-agent system in production planning and control: an application to the scheduling of mixed-model assembly lines Int J Prod Econ 68 29 42
-
(1999)
Int J Prod Econ
, vol.68
, pp. 29-42
-
-
Caridi, M.1
Sianesi, A.2
-
35
-
-
0141976792
-
Human factor policy testing in the sequencing of manual mixed model assembly lines
-
G Celano A Costa S Fichera G Perrone 2001 Human factor policy testing in the sequencing of manual mixed model assembly lines Comput Oper Res 21 39 59
-
(2001)
Comput Oper Res
, vol.21
, pp. 39-59
-
-
Celano, G.1
Costa, A.2
Fichera, S.3
Perrone, G.4
-
36
-
-
0035295083
-
Sequencing JIT mixed model assembly lines under station load and part usage constrains
-
A Drexl A Kimms 2001 Sequencing JIT mixed model assembly lines under station load and part usage constrains Manage Sci 47 3 480 491
-
(2001)
Manage Sci
, vol.47
, Issue.3
, pp. 480-491
-
-
Drexl, A.1
Kimms, A.2
-
37
-
-
23844435565
-
PCB assembly line assignment: A genetic algorithm approach
-
W Ho P Ji 2003 PCB assembly line assignment: a genetic algorithm approach J Manuf Tech Manag 16 6 682 692
-
(2003)
J Manuf Tech Manag
, vol.16
, Issue.6
, pp. 682-692
-
-
Ho, W.1
Ji, P.2
-
38
-
-
0030398997
-
Sequencing in mixed model assembly lines: A genetic algorithm approach
-
YK Kim CJ Hyun Y Kim 1996 Sequencing in mixed model assembly lines: a genetic algorithm approach Comput Oper Res 23 12 1131 1145
-
(1996)
Comput Oper Res
, vol.23
, Issue.12
, pp. 1131-1145
-
-
Kim, Y.K.1
Hyun, C.J.2
Kim, Y.3
-
39
-
-
0035341955
-
Bicriteria sequencing methods for the mixed model assembly line in just-in-time production systems
-
T Korkmazel S Meral 2001 Bicriteria sequencing methods for the mixed model assembly line in just-in-time production systems Eur J Oper Res 131 188 207
-
(2001)
Eur J Oper Res
, vol.131
, pp. 188-207
-
-
Korkmazel, T.1
Meral, S.2
-
41
-
-
13544275547
-
A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines
-
SA Mansouri 2004 A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines Int J Oper Res 167 696 716
-
(2004)
Int J Oper Res
, vol.167
, pp. 696-716
-
-
Mansouri, S.A.1
-
42
-
-
0033736797
-
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constrains
-
MW Park YD Kim 2000 A branch and bound algorithm for a production scheduling problem in an assembly system under due date constrains Eur J Oper Res 123 504 518
-
(2000)
Eur J Oper Res
, vol.123
, pp. 504-518
-
-
Park, M.W.1
Kim, Y.D.2
-
43
-
-
34248654556
-
A new particle swarm algorithm for a multi objective mixed-model assembly line sequencing problem
-
AR Rahimi-Vahed SM Mirghorbani M Rabbani 2007 A new particle swarm algorithm for a multi objective mixed-model assembly line sequencing problem Soft Comput 11 10 998 1011
-
(2007)
Soft Comput
, vol.11
, Issue.10
, pp. 998-1011
-
-
Rahimi-Vahed, A.R.1
Mirghorbani, S.M.2
Rabbani, M.3
-
44
-
-
33750480526
-
Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
-
DOI 10.1016/j.amc.2006.02.033, PII S0096300306002761
-
R Tavakkoli-Moghaddam AR Rahimi-Vahed 2006 Multi-criteria sequencing problem for a mixed-model assembly line in al JIT production system Appl Math Comput 181 1471 1481 (Pubitemid 44646619)
-
(2006)
Applied Mathematics and Computation
, vol.181
, Issue.2
, pp. 1471-1481
-
-
Tavakkoli-Moghaddam, R.1
Rahimi-Vahed, A.R.2
-
45
-
-
0036507643
-
Sequencing mixed model assembly lines for a Just-in-time production system
-
JA Ventura S Radhakrishnan 2002 Sequencing mixed model assembly lines for a Just-in-time production system Prod Planning Control 13 2 199 210
-
(2002)
Prod Planning Control
, vol.13
, Issue.2
, pp. 199-210
-
-
Ventura, J.A.1
Radhakrishnan, S.2
-
46
-
-
0030818944
-
Algorithms for sequencing mixed models on an assembly line in a JIT production system
-
Z Xiaobo K Ohno 1996 Algorithms for sequencing mixed models on an assembly line in a JIT production system Comput Ind Eng 32 1 47 56
-
(1996)
Comput Ind Eng
, vol.32
, Issue.1
, pp. 47-56
-
-
Xiaobo, Z.1
Ohno, K.2
-
47
-
-
0033728251
-
Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages
-
Z Xiaobo K Ohno 1998 Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages Eur J Oper Res 124 560 570
-
(1998)
Eur J Oper Res
, vol.124
, pp. 560-570
-
-
Xiaobo, Z.1
Ohno, K.2
-
48
-
-
68949207852
-
-
Wiley New York
-
Xiaobo Z, Liu J, Ohno K, Kotani S (2005) Modeling and analysis of a mixed-model assembly lime with stochastic operation times. Wiley, New York, pp 682-691
-
(2005)
Modeling and Analysis of A Mixed-model Assembly Lime with Stochastic Operation Times
, pp. 682-691
-
-
Xiaobo, Z.1
Liu, J.2
Ohno, K.3
Kotani, S.4
-
49
-
-
0032688594
-
A note on Toyota's goal of sequencing mixed models on an assembly line
-
Z Xiaobo Z Zhou A Asres 1999 A note on Toyota's goal of sequencing mixed models on an assembly line Comput Ind Eng 36 57 65
-
(1999)
Comput Ind Eng
, vol.36
, pp. 57-65
-
-
Xiaobo, Z.1
Zhou, Z.2
Asres, A.3
-
50
-
-
0242281041
-
A transformed two-stage method for reducing the part usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines
-
J Zhu FY Ding 2000 A transformed two-stage method for reducing the part usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines Eur J Oper Res 127 203 216
-
(2000)
Eur J Oper Res
, vol.127
, pp. 203-216
-
-
Zhu, J.1
Ding, F.Y.2
-
51
-
-
33644861570
-
Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives
-
FY Ding J Zhu H Sun 2004 Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives Int J Prod Econ 102 108 131
-
(2004)
Int J Prod Econ
, vol.102
, pp. 108-131
-
-
Ding, F.Y.1
Zhu, J.2
Sun, H.3
-
52
-
-
0242364700
-
Algorithm for agile assembly-to-order in the automotive industry
-
RR Inman DM Schmeling 2003 Algorithm for agile assembly-to-order in the automotive industry Int J Prod Res 41 3831 3848
-
(2003)
Int J Prod Res
, vol.41
, pp. 3831-3848
-
-
Inman, R.R.1
Schmeling, D.M.2
|