-
1
-
-
0003764618
-
-
Richard D. Irwin, Homewood, IL.
-
Alreck, P. L., and, Settle, R. B. (1985). The survey research handbook, Richard D. Irwin, Homewood, IL.
-
(1985)
The Survey Research Handbook
-
-
Alreck, P.L.1
Settle, R.B.2
-
2
-
-
0000238282
-
Cost overruns in public projects
-
IPMAEL 0263-7863, 10.1016/0263-7863(85)90053-5
-
Arditi, D., Tarim, G., and, Gurdamar, S. (1985). " Cost overruns in public projects." Int. J. Project Manage. IPMAEL 0263-7863, 3 (4), 218-224. 10.1016/0263-7863(85)90053-5
-
(1985)
Int. J. Project Manage.
, vol.3
, Issue.4
, pp. 218-224
-
-
Arditi, D.1
Tarim, G.2
Gurdamar, S.3
-
3
-
-
70450263655
-
Analysis of cost and schedule performance of international development projects
-
Ashan, K., and, Gunawan, I. (2010). " Analysis of cost and schedule performance of international development projects." Int. J. Project Manag., 28 (1), 68-78.
-
(2010)
Int. J. Project Manag.
, vol.28
, Issue.1
, pp. 68-78
-
-
Ashan, K.1
Gunawan, I.2
-
4
-
-
13944265044
-
Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression
-
DOI 10.1061/(ASCE)0733-9364(2003)129:4(405)
-
Attala, M., and, Hegazy, T. (2003). " Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression." J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (4), 405-411. 10.1061/(ASCE)0733- 9364(2003)129:4(405) (Pubitemid 40265454)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.4
, pp. 405-411
-
-
Attalla, M.1
Hegazy, T.2
-
6
-
-
77958138408
-
Three-stage least squares analysis of time and cost overruns in construction contracts
-
JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000225
-
Bhargava, A., Anastasopoulos, P., Labi, S., Sinha, K. C., and, Mannering, F. L. (2010). " Three-stage least squares analysis of time and cost overruns in construction contracts." J. Constr. Eng. Manage. JCEMD4 0733-9364, 136 (11), 1207-1218. 10.1061/(ASCE)CO.1943-7862.0000225
-
(2010)
J. Constr. Eng. Manage.
, vol.136
, Issue.11
, pp. 1207-1218
-
-
Bhargava, A.1
Anastasopoulos, P.2
Labi, S.3
Sinha, K.C.4
Mannering, F.L.5
-
7
-
-
0042647199
-
Cost prediction using decision/risk analysis methodologies
-
0144-6193, 10.1080/01446199100000015
-
Birnie, J., and, Yates, A. (1991). " Cost prediction using decision/risk analysis methodologies." Constr. Manage. Econ. 0144-6193, 9 (2), 171-186. 10.1080/01446199100000015
-
(1991)
Constr. Manage. Econ.
, vol.9
, Issue.2
, pp. 171-186
-
-
Birnie, J.1
Yates, A.2
-
8
-
-
0036162657
-
Reasons for cost and schedule increase for engineering design projects
-
DOI 10.1061/(ASCE)0742-597X(2002)18:1(29)
-
Chang, A. S.-T. (2002). " Reasons for cost and schedule increase for engineering design projects." J. Manage. Eng. JMENEA 0742-597X, 18 (1), 29-36. 10.1061/(ASCE)0742-597X(2002)18:1(29) (Pubitemid 34125201)
-
(2002)
Journal of Management in Engineering
, vol.18
, Issue.1
, pp. 29-36
-
-
Chang, A.S.-T.1
-
11
-
-
34547216864
-
Policy and planning for large-infrastructure projects: Problems, causes, cures
-
DOI 10.1068/b32111
-
Flyvbjerg, B. (2007 a). " Policy and planning for large scale-infrastructure projects: Problems, causes, and cures." Environ. Plann. B Plann. Des., 34 (1), 578-597. (Pubitemid 47108921)
-
(2007)
Environment and Planning B: Planning and Design
, vol.34
, Issue.4
, pp. 578-597
-
-
Flyvbjerg, B.1
-
12
-
-
33847708603
-
Cost overruns and demand shortfalls in urban rail and other infrastructure
-
DOI 10.1080/03081060701207938, PII 772540395
-
Flyvbjerg, B. (2007 b). " Cost overruns and demand shortfalls in urban rail and other infrastructure." Transp. Plann. Technol. TPLTAK 0308-1060, 30 (1), 9-30. 10.1080/03081060701207938 (Pubitemid 46371982)
-
(2007)
Transportation Planning and Technology
, vol.30
, Issue.1
, pp. 9-30
-
-
Flyvbjerg, B.1
-
13
-
-
37549021864
-
Curbing optimism bias and strategic misrepresentation in planning: Reference class forecasting in practice
-
0965-4313, 10.1080/09654310701747936
-
Flyvbjerg, B. (2008). " Curbing optimism bias and strategic misrepresentation in planning: Reference class forecasting in practice." Eur. Plann. Stud. 0965-4313, 16 (1), 3-21. 10.1080/09654310701747936
-
(2008)
Eur. Plann. Stud.
, vol.16
, Issue.1
, pp. 3-21
-
-
Flyvbjerg, B.1
-
15
-
-
0036319174
-
Underestimating costs in public works projects: Errors or lie
-
JAPAD9 0194-4363, 10.1080/01944360208976273
-
Flyvbjerg, B., Holm, M., and, Buhl, S. (2002). " Underestimating costs in public works projects: Errors or lie ?" J. Am. Plann. Assoc. JAPAD9 0194-4363, 68 (3), 279-295. 10.1080/01944360208976273
-
(2002)
J. Am. Plann. Assoc.
, vol.68
, Issue.3
, pp. 279-295
-
-
Flyvbjerg, B.1
Holm, M.2
Buhl, S.3
-
16
-
-
0038721064
-
Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study
-
DOI 10.1016/S0263-7863(02)00055-8
-
Frimpong, Y., Oluwoye, J., and, Crawford, L. (2003). " Causes of delays and cost overruns in construction groundwater projects in developing countries: Ghana case study." Int. J. Proj. Manage. IPMAEL 0263-7863, 21 (5), 321-326. 10.1016/S0263-7863(02)00055-8 (Pubitemid 36689540)
-
(2003)
International Journal of Project Management
, vol.21
, Issue.5
, pp. 321-326
-
-
Frimpong, Y.1
Oluwoye, J.2
Crawford, L.3
-
17
-
-
56349122591
-
Estimating cost discrepancies in highway contracts: Multistep economic approach
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(2008)134:12(953)
-
Gkritza, K., and, Labi, S. (2008). " Estimating cost discrepancies in highway contracts: Multistep economic approach." J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (12), 953-962. 10.1061/(ASCE)0733-9364(2008)134:12(953)
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.12
, pp. 953-962
-
-
Gkritza, K.1
Labi, S.2
-
18
-
-
34250681003
-
Budgeting owner's construction contingency
-
DOI 10.1061/(ASCE)0733-9364(2007)133:7(492)
-
Gunhan, S., and, Arditi, D. (2007). " Budgeting owner's construction contingency." J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (7), 492-497. 10.1061/(ASCE)0733-9364(2007)133:7(492) (Pubitemid 46935012)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.7
, pp. 492-497
-
-
Gunhan, S.1
Arditi, D.2
-
19
-
-
0040941588
-
-
Construction Industry Institute, Univ. of Texas, Austin, TX.
-
Hester, W. T., Kuprenas, J. A., and, Chang, T. C. (1991). " Construction changes and change orders: Their magnitude and impact, Source document 66." Construction Industry Institute, Univ. of Texas, Austin, TX.
-
(1991)
Construction Changes and Change Orders: Their Magnitude and Impact, Source Document 66
-
-
Hester, W.T.1
Kuprenas, J.A.2
Chang, T.C.3
-
20
-
-
77955331395
-
-
Transportation Research Record 1351, Transportation Research Board, Washington, DC.
-
Hinze, J., Selstead, G., and, Mahoney, J. P. (1992). " Cost overruns on State of Washington construction contracts." Transportation Research Record 1351, Transportation Research Board, Washington, DC, 87-93.
-
(1992)
Cost Overruns on State of Washington Construction Contracts
, pp. 87-93
-
-
Hinze, J.1
Selstead, G.2
Mahoney, J.P.3
-
21
-
-
4143128716
-
-
Construction Industry Institute, Univ. of Texas, Austin, TX.
-
Ibbs, C. W., and, Allen, W. E. (1995). " Quantitative impacts of project change, Source document 118." Construction Industry Institute, Univ. of Texas, Austin, TX.
-
(1995)
Quantitative Impacts of Project Change, Source Document 118
-
-
Ibbs, C.W.1
Allen, W.E.2
-
22
-
-
0025494340
-
Predictors of cost-overrun rates
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1990)116:3(548)
-
Jahren, C., and, Ashe, A. M. (1990). " Predictors of cost-overrun rates." J. Constr. Eng. Manage. JCEMD4 0733-9364, 116 (3), 548-552. 10.1061/(ASCE)0733-9364(1990)116:3(548)
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.3
, pp. 548-552
-
-
Jahren, C.1
Ashe, A.M.2
-
23
-
-
75649146301
-
Why cost and schedule overruns on mega oil sands projects
-
PPSCFX 1084-0680, 10.1061/(ASCE)SC.1943-5576.0000024
-
Jergeas, G. F., and, Runwanpura, J. (2010). " Why cost and schedule overruns on mega oil sands projects ?" Pract. Period. Struct. Des. Constr. PPSCFX 1084-0680, 15 (1), 40-43. 10.1061/(ASCE)SC.1943-5576.0000024
-
(2010)
Pract. Period. Struct. Des. Constr.
, vol.15
, Issue.1
, pp. 40-43
-
-
Jergeas, G.F.1
Runwanpura, J.2
-
24
-
-
0039929013
-
Strategic misrepresentation in budgeting
-
JPRTEC
-
Jones, L. R., and, Euske, K. J. (1991). " Strategic misrepresentation in budgeting." Journal of public administration research and theory: J-PART JPRTEC, 1 (4), 437-460.
-
(1991)
Journal of Public Administration Research and Theory: J-PART
, vol.1
, Issue.4
, pp. 437-460
-
-
Jones, L.R.1
Euske, K.J.2
-
25
-
-
0003768818
-
-
Cambridge Univ. Press, Cambridge.
-
Kahneman, D., Slovic, P., and, Tversky, A. (1982). Judgment under uncertainty: Heuristics and biases, Cambridge Univ. Press, Cambridge.
-
(1982)
Judgment under Uncertainty: Heuristics and Biases
-
-
Kahneman, D.1
Slovic, P.2
Tversky, A.3
-
26
-
-
12744251343
-
Use of fuzzy logic for predicting design cost overruns on building projects
-
DOI 10.1061/(ASCE)0733-9364(2002)128:6(503)
-
Knight, K., and, Fayak, A. R. (2002). " Use of fuzzy logic for predicting design cost overruns on building projects." J. Constr. Eng. Manage. JCEMD4 0733-9364, 128 (6), 503-512. 10.1061/(ASCE)0733-9364(2002)128: 6(503) (Pubitemid 40265514)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.6
, pp. 503-512
-
-
Knight, K.1
Fayek, A.R.2
-
27
-
-
1642277111
-
Delusions of success: How optimism undermines executives' decisions
-
HABRAX.
-
Lovallo, D., and, Kahneman, D. (2003). " Delusions of success: How optimism undermines executives' decisions." Harvard Bus. Rev. HABRAX, 56-63.
-
(2003)
Harvard Bus. Rev.
, pp. 56-63
-
-
Lovallo, D.1
Kahneman, D.2
-
28
-
-
0042689966
-
Influence of project type and procurement method on rework costs in building construction projects
-
DOI 10.1061/(ASCE)0733-9364(2002)128:1(18)
-
Love, P. E. D. (2002). " Influence of project type and procurement method on rework costs in building construction projects." J. Constr. Eng. Manage. JCEMD4 0733-9364, 128 (1), 18-29. 10.1061/(ASCE)0733-9364(2002)128:1(18) (Pubitemid 40264891)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.1
, pp. 18-29
-
-
Love, P.E.D.1
-
29
-
-
79960713839
-
Causal discovery and inference of project disputes
-
IEEMA4 0018-9391, 10.1109/TEM.2010.2048907
-
Love, P. E. D., Cheung, S. O., Irani, Z., and, Davis, P. R. (2011). " Causal discovery and inference of project disputes." IEEE Trans. Eng. Manage. IEEMA4 0018-9391, 58 (3), 400-411. 10.1109/TEM.2010.2048907
-
(2011)
IEEE Trans. Eng. Manage.
, vol.58
, Issue.3
, pp. 400-411
-
-
Love, P.E.D.1
Cheung, S.O.2
Irani, Z.3
Davis, P.R.4
-
30
-
-
84867839822
-
Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns
-
IEEMA4 0018-9391, 10.1109/TEM.2011.2163628
-
Love, P. E. D., Edwards, D. J., and, Irani, Z. (2012). " Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns." IEEE Trans. Eng. Manage. IEEMA4 0018-9391, 59 (4), 560-571. 10.1109/TEM.2011.2163628
-
(2012)
IEEE Trans. Eng. Manage.
, vol.59
, Issue.4
, pp. 560-571
-
-
Love, P.E.D.1
Edwards, D.J.2
Irani, Z.3
-
31
-
-
70450206280
-
Congruence or divergence? A path model of rework in building and civil engineering projects
-
JPCFEV 0887-3828, 10.1061/(ASCE)CF.1943-5509.0000054
-
Love, P. E. D., Edwards, D. J., Smith, J., and, Walker, D. H. T. (2009). " Congruence or divergence? A path model of rework in building and civil engineering projects." J. Perform. Constr. Facil. JPCFEV 0887-3828, 23 (6), 480-488. 10.1061/(ASCE)CF.1943-5509.0000054
-
(2009)
J. Perform. Constr. Facil.
, vol.23
, Issue.6
, pp. 480-488
-
-
Love, P.E.D.1
Edwards, D.J.2
Smith, J.3
Walker, D.H.T.4
-
32
-
-
77149177666
-
Rework in civil engineering projects: Determination of cost predictors
-
JCEMD4 0733-9364, 10.1061/(ASCE)CO.1943-7862.0000136
-
Love, P. E. D., Edwards, D. J., Watson, H., and, Davis, P. R. (2010). " Rework in civil engineering projects: Determination of cost predictors." J. Constr. Eng. Manage. JCEMD4 0733-9364, 136 (3), 275-282. 10.1061/(ASCE)CO.1943-7862.0000136
-
(2010)
J. Constr. Eng. Manage.
, vol.136
, Issue.3
, pp. 275-282
-
-
Love, P.E.D.1
Edwards, D.J.2
Watson, H.3
Davis, P.R.4
-
33
-
-
0031599142
-
Mersenne Twister: A 623-dimensionally equidistributed uniform pseudo-random number generator
-
1049-3301, 10.1145/272991.272995
-
Matsumoto, M., and, Nishimura, T. (1998). " Mersenne Twister: A 623-dimensionally equidistributed uniform pseudo-random number generator." ACM Trans. Modell. Comput. Simul. 1049-3301, 8 (1), 3-30. 10.1145/272991.272995
-
(1998)
ACM Trans. Modell. Comput. Simul.
, vol.8
, Issue.1
, pp. 3-30
-
-
Matsumoto, M.1
Nishimura, T.2
-
34
-
-
84958535633
-
-
Faculty of Economics, Business Administration and Econometrics, Free Univ. Amsterdam, the Netherlands.
-
Nijkamp, P., and, Ubbels, B. (1999). How reliable are estimates of infrastructure costs? A comparative analysis, Faculty of Economics, Business Administration and Econometrics, Free Univ., Amsterdam, the Netherlands.
-
(1999)
How Reliable Are Estimates of Infrastructure Costs? A Comparative Analysis
-
-
Nijkamp, P.1
Ubbels, B.2
-
35
-
-
1642538212
-
Cost overruns in road construction - what are their sizesand determinants?
-
DOI 10.1016/S0967-070X(03)00017-9
-
Odeck, J. (2004). " Cost overruns in road construction: What are their sizes and determinants ?" Transport Policy 0967-070X TRPOE9, 11 (1), 43-53. 10.1016/S0967-070X(03)00017-9 (Pubitemid 38122907)
-
(2004)
Transport Policy
, vol.11
, Issue.1
, pp. 43-53
-
-
Odeck, J.1
-
36
-
-
0005114736
-
Assessing Norwegian toll roads
-
TRQUDV
-
Odeck, J., and, Skjeseth, T. (1995). " Assessing Norwegian toll roads." Transportation quarterly / Eno Foundation for Transportation TRQUDV, 49 (2), 89-98.
-
(1995)
Transportation Quarterly / Eno Foundation for Transportation
, vol.49
, Issue.2
, pp. 89-98
-
-
Odeck, J.1
Skjeseth, T.2
-
38
-
-
58049139009
-
-
Project Management Institute. 4th Ed. Project Management Institute, Newton Square, PA.
-
Project Management Institute. (2008). A guide to the project management of knowledge (PMBOK), 4th Ed., Project Management Institute, Newton Square, PA.
-
(2008)
A Guide to the Project Management of Knowledge (PMBOK)
-
-
-
39
-
-
0023440196
-
Using risk management techniques to control construction costs
-
JCEMD4 0733-9364, 10.1061/(ASCE)9742-597X(1987)3:4(314)
-
Randolph, D. A., Rajandra, K., and, Campfield, J. J. (1987). " Using risk management techniques to control construction costs." J. Constr. Eng. Manage. JCEMD4 0733-9364, 3 (4), 314-324. 10.1061/(ASCE)9742-597X(1987)3:4(314)
-
(1987)
J. Constr. Eng. Manage.
, vol.3
, Issue.4
, pp. 314-324
-
-
Randolph, D.A.1
Rajandra, K.2
Campfield, J.J.3
-
41
-
-
0345881437
-
-
A definition of procurement systems." S. Rowlinson and P. McDermott, eds. E & F Spon, London.
-
Rowlinson, S. (1999). " A definition of procurement systems." Procurement systems: A guide to best practice in construction, S. Rowlinson and P. McDermott., eds., E & F Spon, London, 27-53.
-
(1999)
Procurement Systems: A Guide to Best Practice in Construction
, pp. 27-53
-
-
Rowlinson, S.1
-
42
-
-
0028754078
-
Construction claims and disputes: Causes and cost/time overruns
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1994)120:4(785)
-
Semple, C., Harman, F. T., and, Jergeas, G. (1994). " Construction claims and disputes: Causes and cost/time overruns." J. Constr. Eng. Manage. JCEMD4 0733-9364, 120 (4), 785-795. 10.1061/(ASCE)0733-9364(1994)120: 4(785)
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.4
, pp. 785-795
-
-
Semple, C.1
Harman, F.T.2
Jergeas, G.3
-
43
-
-
0030182201
-
-
Transportation Research Record 1518, Transportation Research Board, Washington, DC.
-
Skamris, M. K., and, Flyvbjerg, B. (1996). " Accuracy of traffic forecasts and cost estimates on large transportation projects." Transportation Research Record 1518, Transportation Research Board, Washington, DC, 65-69.
-
(1996)
Accuracy of Traffic Forecasts and Cost Estimates on Large Transportation Projects
, pp. 65-69
-
-
Skamris, M.K.1
Flyvbjerg, B.2
-
44
-
-
0031423446
-
Inaccuracy of traffic forecasts and cost estimates on large transportation projects
-
10.1016/S0967-070X(97)00007-3 TRPOE9
-
Skamris, M. K., and, Flyvbjerg, B. (1997). " Inaccuracy of traffic forecasts and cost estimates on large transportation projects." Transport Policy, 4 (3), 141-146. 10.1016/S0967-070X(97)00007-3 TRPOE9
-
(1997)
Transport Policy
, vol.4
, Issue.3
, pp. 141-146
-
-
Skamris, M.K.1
Flyvbjerg, B.2
-
45
-
-
33645711074
-
Cost and time overruns in highway construction
-
Vidalis, S. M., and, Najafi, F. T. (2002). " Cost and time overruns in highway construction." Proc., 4th Transportation Specialty Conf. of the Canadian Society of Civil Engineering, Canadian Society of Civil Engineering, Montreal, QC.
-
(2002)
Proc. 4th Transportation Specialty Conf. of the Canadian Society of Civil Engineering, Canadian Society of Civil Engineering, Montreal, QC.
-
-
Vidalis, S.M.1
Najafi, F.T.2
-
46
-
-
84874584011
-
-
Western Australia Auditor General. (a) (Jul. 18, 2011).
-
Western Australia Auditor General. (2010 a). " Fiona Stanley Hospital project, Report 5." 〈 www.audit.wa.gov.au/reports 〉 (Jul. 18, 2011).
-
(2010)
Fiona Stanley Hospital Project, Report 5
-
-
-
47
-
-
84874623325
-
-
Western Australia Auditor General (Jul. 18, 2011).
-
Western Australia Auditor General. (2010 b). " Planning and Management of Perth Arena, Report 1." 〈 www.audit.wa.gov.au/reports 〉 (Jul. 18, 2011).
-
(2010)
Planning and Management of Perth Arena, Report 1
-
-
-
48
-
-
24944534114
-
-
Construction Industry Institute, Univ. of Texas, Austin, TX.
-
Zeitoun, A., and, Oberlander, G. (1993). Early warning signs of project changes, Source Document 91, Construction Industry Institute, Univ. of Texas, Austin, TX.
-
(1993)
Early Warning Signs of Project Changes, Source Document 91
-
-
Zeitoun, A.1
Oberlander, G.2
|