-
1
-
-
84993008447
-
Integrated models for construction planning: Object flow and relationship
-
10.1046/j.1365-232x.1999.00105.x
-
Alshawi, M., and, Hassan, Z. (1999). " Integrated models for construction planning: Object flow and relationship." Eng. Constr. Archit. Manage., 6 (2), 197-212. 10.1046/j.1365-232x.1999.00105.x
-
(1999)
Eng. Constr. Archit. Manage.
, vol.6
, Issue.2
, pp. 197-212
-
-
Alshawi, M.1
Hassan, Z.2
-
2
-
-
0033132512
-
Project management and good technical and business practices
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1999)15:3(78)
-
Angelides, D. (1999). " Project management and good technical and business practices." J. Manage. Eng., 15 (3), 78-88. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1999)15:3(78)
-
(1999)
J. Manage. Eng.
, vol.15
, Issue.3
, pp. 78-88
-
-
Angelides, D.1
-
3
-
-
84927635730
-
Causes of delay in large building construction projects
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1995)11:2(45)
-
Assaf, S., Al-Khaliil, M., and, Al-Hazmi, M. (1995). " Causes of delay in large building construction projects." J. Manage. Eng., 11 (2), 45-50. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1995)11:2(45)
-
(1995)
J. Manage. Eng.
, vol.11
, Issue.2
, pp. 45-50
-
-
Assaf, S.1
Al-Khaliil, M.2
Al-Hazmi, M.3
-
4
-
-
36249000519
-
Probabilistic control of project performance using control limit curves
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:12(957)
-
Barraza, G., and, Bueno, R. (2007). " Probabilistic control of project performance using control limit curves." J. Constr. Eng. Manage., 133 (12), 957-965. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:12(957)
-
(2007)
J. Constr. Eng. Manage.
, vol.133
, Issue.12
, pp. 957-965
-
-
Barraza, G.1
Bueno, R.2
-
6
-
-
61549143368
-
A cost control system development: A collaborative approach for small and medium-sized contractors
-
IPMAEL 0263-7863 10.1016/j.ijproman.2008.02.004
-
Benjaoran, V. (2009). " A cost control system development: A collaborative approach for small and medium-sized contractors." Int. J. Proj. Manage., 27 (3), 270-277. IPMAEL 0263-7863 10.1016/j.ijproman.2008.02.004
-
(2009)
Int. J. Proj. Manage.
, vol.27
, Issue.3
, pp. 270-277
-
-
Benjaoran, V.1
-
7
-
-
0035501633
-
Application of Delphi method in selection of procurement systems for construction projects
-
0144-6193 10.1080/01446190110066128
-
Chan, A., Yung, E., Lam, P., Tam, C., and, Cheung, S. (2001 a). " Application of Delphi method in selection of procurement systems for construction projects." Constr. Manage. Econ., 19 (7), 699-718. 0144-6193 10.1080/01446190110066128
-
(2001)
Constr. Manage. Econ.
, vol.19
, Issue.7
, pp. 699-718
-
-
Chan, A.1
Yung, E.2
Lam, P.3
Tam, C.4
Cheung, S.5
-
8
-
-
0031078243
-
A comparative study of causes of time overruns in Honk Kong construction projects
-
IPMAEL
-
Chan, D., and, Kumaraswamy, M. (1997). " A comparative study of causes of time overruns in Honk Kong construction projects." Int. J. Proj. Manage., 15 (1), 55-63. IPMAEL
-
(1997)
Int. J. Proj. Manage.
, vol.15
, Issue.1
, pp. 55-63
-
-
Chan, D.1
Kumaraswamy, M.2
-
9
-
-
0035280018
-
Design and build project success: Multivariate analysis
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2001)127:2(93)
-
Chan, P., Ho, D., and, Tam, C. (2001 b). " Design and build project success: Multivariate analysis." J. Constr. Eng. Manage., 127 (2), 93-100. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2001)127:2(93)
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.2
, pp. 93-100
-
-
Chan, P.1
Ho, D.2
Tam, C.3
-
10
-
-
0036162657
-
Reasons for cost and schedule increase for engineering design projects
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:1(29)
-
Chang, A. (2002). " Reasons for cost and schedule increase for engineering design projects." J. Manage. Eng., 18 (1), 29-36. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:1(29)
-
(2002)
J. Manage. Eng.
, vol.18
, Issue.1
, pp. 29-36
-
-
Chang, A.1
-
11
-
-
77949667255
-
Integrated schedule and cost model for repetitive construction process
-
JMENEA 0742-597X 10.1061/(ASCE)ME.1943-5479.0000009
-
Cho, K., Hong, T., and, Hyun, C. (2010). " Integrated schedule and cost model for repetitive construction process." J. Manage. Eng., 26 (2), 78-88. JMENEA 0742-597X 10.1061/(ASCE)ME.1943-5479.0000009
-
(2010)
J. Manage. Eng.
, vol.26
, Issue.2
, pp. 78-88
-
-
Cho, K.1
Hong, T.2
Hyun, C.3
-
12
-
-
0003964033
-
-
MIT Press, Cambridge, MA
-
Deming, W. (2000). Out of crisis, MIT Press, Cambridge, MA.
-
(2000)
Out of Crisis
-
-
Deming, W.1
-
13
-
-
12444316997
-
Planning and control processes and techniques for refurbishment management
-
0144-6193 10.1080/014461998372349
-
Egbu, C., Young, B., and, Torrance, V. (1998). " Planning and control processes and techniques for refurbishment management." Constr. Manage. Econ., 16 (3), 315-325. 0144-6193 10.1080/014461998372349
-
(1998)
Constr. Manage. Econ.
, vol.16
, Issue.3
, pp. 315-325
-
-
Egbu, C.1
Young, B.2
Torrance, V.3
-
14
-
-
0031999964
-
Timing of control activities in project planning
-
IPMAEL
-
Falco, M., and, Macchiaroli, R. (1998). " Timing of control activities in project planning." Int. J. Proj. Manage., 16 (1), 51-58. IPMAEL
-
(1998)
Int. J. Proj. Manage.
, vol.16
, Issue.1
, pp. 51-58
-
-
Falco, M.1
MacChiaroli, R.2
-
15
-
-
17244362051
-
Dynamic planning and control methodology for design/build fast-track construction projects
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2001)127:1(1)
-
Fena-Mora, F., and, Li, M. (2001). " Dynamic planning and control methodology for design/build fast-track construction projects." J. Constr. Eng. Manage., 127 (1), 1-17. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2001)127: 1(1)
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 1-17
-
-
Fena-Mora, F.1
Li, M.2
-
17
-
-
75849119176
-
Application of appropriate controls tools for contract type
-
CSTEDM 0274-9696
-
Floyd, L. (2004). " Application of appropriate controls tools for contract type." Cost Eng., 46 (2), 25-30. CSTEDM 0274-9696
-
(2004)
Cost Eng.
, vol.46
, Issue.2
, pp. 25-30
-
-
Floyd, L.1
-
18
-
-
14744299396
-
Budget and schedule success for small capital-facility projects
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:4(186)
-
Gao, Z., Smith, G., and, Minchin, R. (2002). " Budget and schedule success for small capital-facility projects." J. Manage. Eng., 18 (4), 186-193. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:4(186)
-
(2002)
J. Manage. Eng.
, vol.18
, Issue.4
, pp. 186-193
-
-
Gao, Z.1
Smith, G.2
Minchin, R.3
-
19
-
-
67349207068
-
A comprehensive model for planning and controlling contractor cash-flow
-
IPMAEL 0263-7863 10.1016/j.ijproman.2008.08.001
-
Gorog, M. (2009). " A comprehensive model for planning and controlling contractor cash-flow." Int. J. Proj. Manage., 27 (5), 481-492. IPMAEL 0263-7863 10.1016/j.ijproman.2008.08.001
-
(2009)
Int. J. Proj. Manage.
, vol.27
, Issue.5
, pp. 481-492
-
-
Gorog, M.1
-
20
-
-
34548689135
-
Estimating performance time for construction projects
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2007)23:4(193)
-
Hoffman, G., Thal, A., Webb, T., and, Weir, J. (2007). " Estimating performance time for construction projects." J. Manage. Eng., 23 (4), 193-199. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2007)23:4(193)
-
(2007)
J. Manage. Eng.
, vol.23
, Issue.4
, pp. 193-199
-
-
Hoffman, G.1
Thal, A.2
Webb, T.3
Weir, J.4
-
21
-
-
33646584142
-
Optimal planning and scheduling for repetitive construction projects
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2006)22:1(11)
-
Hyari, K., and, El-Rayes, K. (2006). " Optimal planning and scheduling for repetitive construction projects." J. Manage. Eng., 22 (1), 11-19. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2006)22:1(11)
-
(2006)
J. Manage. Eng.
, vol.22
, Issue.1
, pp. 11-19
-
-
Hyari, K.1
El-Rayes, K.2
-
22
-
-
18144374111
-
Factors affecting cost performance: Evidence from Indian construction projects
-
IPMAEL 0263-7863 10.1016/j.ijproman.2004.10.003
-
Iyer, K., and, Jha, K. (2005). " Factors affecting cost performance: Evidence from Indian construction projects." Int. J. Proj. Manage., 23 (4), 283-295. IPMAEL 0263-7863 10.1016/j.ijproman.2004.10.003
-
(2005)
Int. J. Proj. Manage.
, vol.23
, Issue.4
, pp. 283-295
-
-
Iyer, K.1
Jha, K.2
-
23
-
-
33845805688
-
Knowledge-based standard progress measurement for integrated cost and schedule performance control
-
0733-9364 10.1061/(ASCE)0733-9364(2007)133:1(10)
-
Jung, Y., and, Kang, S. (2007). " Knowledge-based standard progress measurement for integrated cost and schedule performance control." J. Constr. Eng. Manage., 133 (1), 10-21. 0733-9364 10.1061/(ASCE)0733-9364(2007) 133:1(10)
-
(2007)
J. Constr. Eng. Manage.
, vol.133
, Issue.1
, pp. 10-21
-
-
Jung, Y.1
Kang, S.2
-
24
-
-
13944282234
-
Flexible work breakdown structure for integrated cost and schedule control
-
0733-9364 10.1061/(ASCE)0733-9364(2004)130:5(616)
-
Jung, Y., and, Woo, S. (2004). " Flexible work breakdown structure for integrated cost and schedule control." J. Constr. Eng. Manage., 130 (5), 616-625. 0733-9364 10.1061/(ASCE)0733-9364(2004)130:5(616)
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.5
, pp. 616-625
-
-
Jung, Y.1
Woo, S.2
-
25
-
-
84992957330
-
The development of a benchmark model that uses historical data for monitoring the progress of current construction projects
-
0969-9988 10.1046/j.1365-232x.1999.00112.x
-
Kaka, A. (1999). " The development of a benchmark model that uses historical data for monitoring the progress of current construction projects." Eng. Constr. Archit. Manage., 6 (3), 256-266. 0969-9988 10.1046/j.1365-232x.1999.00112.x
-
(1999)
Eng. Constr. Archit. Manage.
, vol.6
, Issue.3
, pp. 256-266
-
-
Kaka, A.1
-
26
-
-
22144498504
-
The relative impacts of selected practices on project cost and schedule
-
0144-6193 10.1080/01446190500040232
-
Lee, S., Thomas, S., and, Tucker, R. (2005). " The relative impacts of selected practices on project cost and schedule." Constr. Manage. Econ., 23 (5), 545-553. 0144-6193 10.1080/01446190500040232
-
(2005)
Constr. Manage. Econ.
, vol.23
, Issue.5
, pp. 545-553
-
-
Lee, S.1
Thomas, S.2
Tucker, R.3
-
27
-
-
51849121510
-
Project performance evaluation based on statistical process control techniques
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:10(813)
-
Leu, S., and, Lin, Y. (2008). " Project performance evaluation based on statistical process control techniques." J. Constr. Eng. Manage., 134 (10), 813-819. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:10(813)
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.10
, pp. 813-819
-
-
Leu, S.1
Lin, Y.2
-
28
-
-
2442471669
-
How project managers can better control the performance of design-build projects
-
IPMAEL 0263-7863 10.1016/j.ijproman.2003.09.003
-
Ling, F. (2004). " How project managers can better control the performance of design-build projects." Int. J. Proj. Manage., 22 (6), 477-488. IPMAEL 0263-7863 10.1016/j.ijproman.2003.09.003
-
(2004)
Int. J. Proj. Manage.
, vol.22
, Issue.6
, pp. 477-488
-
-
Ling, F.1
-
29
-
-
56749097044
-
Key project management practices affecting Singaporean firms' project performance in China
-
IPMAEL
-
Ling, Y., Low, S., Wang, S., and, Lim, H. (2009). " Key project management practices affecting Singaporean firms' project performance in China." Int. J. Proj. Manage., 27 (1), 59-71. IPMAEL
-
(2009)
Int. J. Proj. Manage.
, vol.27
, Issue.1
, pp. 59-71
-
-
Ling, Y.1
Low, S.2
Wang, S.3
Lim, H.4
-
30
-
-
32144432797
-
Sustainable construction and drivers of change in Greece: A Delphi study
-
0144-6193 10.1080/01446190500204804
-
Manoliadis, O., Tsolas, I., and, Nakou, A. (2006). " Sustainable construction and drivers of change in Greece: A Delphi study." Constr. Manage. Econ., 24 (2), 113-120. 0144-6193 10.1080/01446190500204804
-
(2006)
Constr. Manage. Econ.
, vol.24
, Issue.2
, pp. 113-120
-
-
Manoliadis, O.1
Tsolas, I.2
Nakou, A.3
-
31
-
-
0003847064
-
-
Englemere Services Ltd. Ascot, UK
-
Mawdesley, M., Askey, W., and, O'Reilly, M. (1997). Planning and controlling construction projects: The best laid plans, Englemere Services Ltd., Ascot, UK.
-
(1997)
Planning and Controlling Construction Projects: The Best Laid Plans
-
-
Mawdesley, M.1
Askey, W.2
O'Reilly, M.3
-
32
-
-
15844412260
-
Standardized project management may increase development projects success
-
IPMAEL 0263-7863 10.1016/j.ijproman.2004.11.002
-
Milosevic, D., and, Patanakul, P. (2005). " Standardized project management may increase development projects success." Int. J. Proj. Manage., 23 (3), 181-192. IPMAEL 0263-7863 10.1016/j.ijproman.2004.11.002
-
(2005)
Int. J. Proj. Manage.
, vol.23
, Issue.3
, pp. 181-192
-
-
Milosevic, D.1
Patanakul, P.2
-
33
-
-
27744523298
-
Evaluating cost overruns of asphalt paving projects using statistical process control methods
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2005)131:11(1173)
-
Nassar, K., Nassar, W., and, Hegab, M. (2005). " Evaluating cost overruns of asphalt paving projects using statistical process control methods." J. Constr. Eng. Manage., 131 (11), 1173-1178. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2005)131:11(1173)
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.11
, pp. 1173-1178
-
-
Nassar, K.1
Nassar, W.2
Hegab, M.3
-
34
-
-
77953674695
-
Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice
-
0144-6193 10.1080/01446191003674519
-
Olawale, Y., and, Sun, M. (2010 a). " Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice." Constr. Manage. Econ., 28 (5), 509-526. 0144-6193 10.1080/01446191003674519
-
(2010)
Constr. Manage. Econ.
, vol.28
, Issue.5
, pp. 509-526
-
-
Olawale, Y.1
Sun, M.2
-
35
-
-
77953682107
-
Cost and time control of construction projects: A survey of contractors and consultants in the UK
-
Olawale, Y., and, Sun, M. (2010 b). " Cost and time control of construction projects: A survey of contractors and consultants in the UK." Constr. Inform. Quart., 11 (2), 53-59.
-
(2010)
Constr. Inform. Quart.
, vol.11
, Issue.2
, pp. 53-59
-
-
Olawale, Y.1
Sun, M.2
-
37
-
-
26644441907
-
Cost control in consulting engineering firms
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2005)21:4(189)
-
Pellicer, E. (2005). " Cost control in consulting engineering firms." J. Manage. Eng., 21 (4), 189-192. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2005)21:4(189)
-
(2005)
J. Manage. Eng.
, vol.21
, Issue.4
, pp. 189-192
-
-
Pellicer, E.1
-
38
-
-
0032142667
-
From plan-do-check-action to PIDCAM: The further evolution of the Deming-wheel
-
IPMAEL 0263-7863 10.1016/S0263-7863(97)00031-8
-
Platje, A., and, Wadman, S. (1998). " From plan-do-check-action to PIDCAM: The further evolution of the Deming-wheel." Int. J. Proj. Manage., 16 (4), 201-208. IPMAEL 0263-7863 10.1016/S0263-7863(97)00031-8
-
(1998)
Int. J. Proj. Manage.
, vol.16
, Issue.4
, pp. 201-208
-
-
Platje, A.1
Wadman, S.2
-
39
-
-
0348146476
-
MPCS: Multidimensional project control system
-
IPMAEL 0263-7863 10.1016/S0263-7863(03)00002-4
-
Rozenes, S., Vitner, G., and, Spraggett, S. (2004). " MPCS: Multidimensional project control system." Int. J. Proj. Manage., 22 (2), 109-118. IPMAEL 0263-7863 10.1016/S0263-7863(03)00002-4
-
(2004)
Int. J. Proj. Manage.
, vol.22
, Issue.2
, pp. 109-118
-
-
Rozenes, S.1
Vitner, G.2
Spraggett, S.3
-
40
-
-
44649162020
-
Project control: Literature review
-
1938-9507
-
Rozenes, S., Vitner, G., and, Spraggett, S. (2006). " Project control: Literature review." Proj. Manage. J., 37 (4), 4-14. 1938-9507
-
(2006)
Proj. Manage. J.
, vol.37
, Issue.4
, pp. 4-14
-
-
Rozenes, S.1
Vitner, G.2
Spraggett, S.3
-
41
-
-
70349342801
-
Construction project cost escalation factors
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:4(221)
-
Shane, J., Molenaar, K., Anderson, S., and, Schexnayder, C. (2009). " Construction project cost escalation factors." J. Manage. Eng., 25 (4), 221-229. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:4(221)
-
(2009)
J. Manage. Eng.
, vol.25
, Issue.4
, pp. 221-229
-
-
Shane, J.1
Molenaar, K.2
Anderson, S.3
Schexnayder, C.4
-
42
-
-
1142293847
-
Performance indicators for micro-projects in developing countries
-
0144-6193 10.1080/0144619042000186022
-
Sohail, M., and, Baldwin, A. (2004). " Performance indicators for micro-projects in developing countries." Constr. Manage. Econ., 22 (1), 11-23. 0144-6193 10.1080/0144619042000186022
-
(2004)
Constr. Manage. Econ.
, vol.22
, Issue.1
, pp. 11-23
-
-
Sohail, M.1
Baldwin, A.2
-
43
-
-
34548694839
-
The Delphi technique
-
JOGYDW 0144-3615 10.1576/toag.7.2.120.27071
-
Thangaratinam, S., and, Redman, C. (2005). " The Delphi technique." Obstet. Gynecologist, 7 (2), 120-125. JOGYDW 0144-3615 10.1576/toag.7.2.120.27071
-
(2005)
Obstet. Gynecologist
, vol.7
, Issue.2
, pp. 120-125
-
-
Thangaratinam, S.1
Redman, C.2
-
45
-
-
33645967441
-
A comparison of different project duration forecasting methods using earned value metrics
-
IPMAEL 0263-7863 10.1016/j.ijproman.2005.10.004
-
Vandevoorde, S., and, Vanhoucke, M. (2005). " A comparison of different project duration forecasting methods using earned value metrics." Int. J. Proj. Manage., 24 (4), 289-302. IPMAEL 0263-7863 10.1016/j.ijproman. 2005.10.004
-
(2005)
Int. J. Proj. Manage.
, vol.24
, Issue.4
, pp. 289-302
-
-
Vandevoorde, S.1
Vanhoucke, M.2
-
46
-
-
84872697491
-
Applying Dr Deming's dynamic control model to project cost control
-
Royal Institution of Chartered Surveyors (RICS), Brussels, Belgium
-
Watson, P., and, Davis, R. (2002). " Applying Dr Deming's dynamic control model to project cost control." Proc., Royal Institution of Chartered Surveyors (RICS) Foundation Construction and Building Research Conf., Royal Institution of Chartered Surveyors (RICS), Brussels, Belgium.
-
(2002)
Proc. Royal Institution of Chartered Surveyors (RICS) Foundation Construction and Building Research Conf
-
-
Watson, P.1
Davis, R.2
-
47
-
-
0036132577
-
Current practice in project management - An empirical study
-
IPMAEL
-
White, D., and, Fortune, J. (2002). " Current practice in project management-An empirical study." Int. J. Proj. Manage., 20 (2), 1-11. IPMAEL
-
(2002)
Int. J. Proj. Manage.
, vol.20
, Issue.2
, pp. 1-11
-
-
White, D.1
Fortune, J.2
-
48
-
-
2342446285
-
Construction time performance: An evaluation of contractors from Japan, the UK and the US
-
0969-9988
-
Xiao, H., and, Proverbs, D. (2002). " Construction time performance: An evaluation of contractors from Japan, the UK and the US." Eng. Constr. Archit. Manage., 9 (2), 81-89. 0969-9988
-
(2002)
Eng. Constr. Archit. Manage.
, vol.9
, Issue.2
, pp. 81-89
-
-
Xiao, H.1
Proverbs, D.2
-
49
-
-
62549151788
-
Developing a performance index for relationship-based construction projects in Australia: Delphi study
-
JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:2(59)
-
Yeung, J., Chan, P., and, Chan, D. (2009). " Developing a performance index for relationship-based construction projects in Australia: Delphi study." J. Manage. Eng., 25 (2), 59-67. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:2(59)
-
(2009)
J. Manage. Eng.
, vol.25
, Issue.2
, pp. 59-67
-
-
Yeung, J.1
Chan, P.2
Chan, D.3
|