Volumn 29, Issue 1, 2013, Pages 60-70

PCIM: Project control and inhibiting-factors management model

Author keywords

Cost control; Management model; Project control; Project management; Schedule control

Indexed keywords

CONSTRUCTION PROJECTS; COST CONTROLS; COST OVERRUNS; GOOD PRACTICES; INHIBITING FACTORS; MANAGEMENT MODEL; NEW PROJECTS; PROJECT CONTROL; PROJECT MANAGERS; PROJECT OBJECTIVES; SCHEDULE CONTROL; TIME CONTROL;

EID: 84872733006     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000125     Document Type: Article
Times cited : (35)

References (49)
  • 1
    • 84993008447 scopus 로고    scopus 로고
    • Integrated models for construction planning: Object flow and relationship
    • 10.1046/j.1365-232x.1999.00105.x
    • Alshawi, M., and, Hassan, Z. (1999). " Integrated models for construction planning: Object flow and relationship." Eng. Constr. Archit. Manage., 6 (2), 197-212. 10.1046/j.1365-232x.1999.00105.x
    • (1999) Eng. Constr. Archit. Manage. , vol.6 , Issue.2 , pp. 197-212
    • Alshawi, M.1    Hassan, Z.2
  • 2
    • 0033132512 scopus 로고    scopus 로고
    • Project management and good technical and business practices
    • JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1999)15:3(78)
    • Angelides, D. (1999). " Project management and good technical and business practices." J. Manage. Eng., 15 (3), 78-88. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1999)15:3(78)
    • (1999) J. Manage. Eng. , vol.15 , Issue.3 , pp. 78-88
    • Angelides, D.1
  • 3
    • 84927635730 scopus 로고
    • Causes of delay in large building construction projects
    • JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1995)11:2(45)
    • Assaf, S., Al-Khaliil, M., and, Al-Hazmi, M. (1995). " Causes of delay in large building construction projects." J. Manage. Eng., 11 (2), 45-50. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(1995)11:2(45)
    • (1995) J. Manage. Eng. , vol.11 , Issue.2 , pp. 45-50
    • Assaf, S.1    Al-Khaliil, M.2    Al-Hazmi, M.3
  • 4
    • 36249000519 scopus 로고    scopus 로고
    • Probabilistic control of project performance using control limit curves
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:12(957)
    • Barraza, G., and, Bueno, R. (2007). " Probabilistic control of project performance using control limit curves." J. Constr. Eng. Manage., 133 (12), 957-965. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2007)133:12(957)
    • (2007) J. Constr. Eng. Manage. , vol.133 , Issue.12 , pp. 957-965
    • Barraza, G.1    Bueno, R.2
  • 6
    • 61549143368 scopus 로고    scopus 로고
    • A cost control system development: A collaborative approach for small and medium-sized contractors
    • IPMAEL 0263-7863 10.1016/j.ijproman.2008.02.004
    • Benjaoran, V. (2009). " A cost control system development: A collaborative approach for small and medium-sized contractors." Int. J. Proj. Manage., 27 (3), 270-277. IPMAEL 0263-7863 10.1016/j.ijproman.2008.02.004
    • (2009) Int. J. Proj. Manage. , vol.27 , Issue.3 , pp. 270-277
    • Benjaoran, V.1
  • 7
    • 0035501633 scopus 로고    scopus 로고
    • Application of Delphi method in selection of procurement systems for construction projects
    • 0144-6193 10.1080/01446190110066128
    • Chan, A., Yung, E., Lam, P., Tam, C., and, Cheung, S. (2001 a). " Application of Delphi method in selection of procurement systems for construction projects." Constr. Manage. Econ., 19 (7), 699-718. 0144-6193 10.1080/01446190110066128
    • (2001) Constr. Manage. Econ. , vol.19 , Issue.7 , pp. 699-718
    • Chan, A.1    Yung, E.2    Lam, P.3    Tam, C.4    Cheung, S.5
  • 8
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Honk Kong construction projects
    • IPMAEL
    • Chan, D., and, Kumaraswamy, M. (1997). " A comparative study of causes of time overruns in Honk Kong construction projects." Int. J. Proj. Manage., 15 (1), 55-63. IPMAEL
    • (1997) Int. J. Proj. Manage. , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.1    Kumaraswamy, M.2
  • 9
    • 0035280018 scopus 로고    scopus 로고
    • Design and build project success: Multivariate analysis
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2001)127:2(93)
    • Chan, P., Ho, D., and, Tam, C. (2001 b). " Design and build project success: Multivariate analysis." J. Constr. Eng. Manage., 127 (2), 93-100. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2001)127:2(93)
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.2 , pp. 93-100
    • Chan, P.1    Ho, D.2    Tam, C.3
  • 10
    • 0036162657 scopus 로고    scopus 로고
    • Reasons for cost and schedule increase for engineering design projects
    • JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:1(29)
    • Chang, A. (2002). " Reasons for cost and schedule increase for engineering design projects." J. Manage. Eng., 18 (1), 29-36. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:1(29)
    • (2002) J. Manage. Eng. , vol.18 , Issue.1 , pp. 29-36
    • Chang, A.1
  • 11
    • 77949667255 scopus 로고    scopus 로고
    • Integrated schedule and cost model for repetitive construction process
    • JMENEA 0742-597X 10.1061/(ASCE)ME.1943-5479.0000009
    • Cho, K., Hong, T., and, Hyun, C. (2010). " Integrated schedule and cost model for repetitive construction process." J. Manage. Eng., 26 (2), 78-88. JMENEA 0742-597X 10.1061/(ASCE)ME.1943-5479.0000009
    • (2010) J. Manage. Eng. , vol.26 , Issue.2 , pp. 78-88
    • Cho, K.1    Hong, T.2    Hyun, C.3
  • 12
    • 0003964033 scopus 로고    scopus 로고
    • MIT Press, Cambridge, MA
    • Deming, W. (2000). Out of crisis, MIT Press, Cambridge, MA.
    • (2000) Out of Crisis
    • Deming, W.1
  • 13
    • 12444316997 scopus 로고    scopus 로고
    • Planning and control processes and techniques for refurbishment management
    • 0144-6193 10.1080/014461998372349
    • Egbu, C., Young, B., and, Torrance, V. (1998). " Planning and control processes and techniques for refurbishment management." Constr. Manage. Econ., 16 (3), 315-325. 0144-6193 10.1080/014461998372349
    • (1998) Constr. Manage. Econ. , vol.16 , Issue.3 , pp. 315-325
    • Egbu, C.1    Young, B.2    Torrance, V.3
  • 14
    • 0031999964 scopus 로고    scopus 로고
    • Timing of control activities in project planning
    • IPMAEL
    • Falco, M., and, Macchiaroli, R. (1998). " Timing of control activities in project planning." Int. J. Proj. Manage., 16 (1), 51-58. IPMAEL
    • (1998) Int. J. Proj. Manage. , vol.16 , Issue.1 , pp. 51-58
    • Falco, M.1    MacChiaroli, R.2
  • 15
    • 17244362051 scopus 로고    scopus 로고
    • Dynamic planning and control methodology for design/build fast-track construction projects
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2001)127:1(1)
    • Fena-Mora, F., and, Li, M. (2001). " Dynamic planning and control methodology for design/build fast-track construction projects." J. Constr. Eng. Manage., 127 (1), 1-17. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2001)127: 1(1)
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 1-17
    • Fena-Mora, F.1    Li, M.2
  • 17
    • 75849119176 scopus 로고    scopus 로고
    • Application of appropriate controls tools for contract type
    • CSTEDM 0274-9696
    • Floyd, L. (2004). " Application of appropriate controls tools for contract type." Cost Eng., 46 (2), 25-30. CSTEDM 0274-9696
    • (2004) Cost Eng. , vol.46 , Issue.2 , pp. 25-30
    • Floyd, L.1
  • 18
    • 14744299396 scopus 로고    scopus 로고
    • Budget and schedule success for small capital-facility projects
    • JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:4(186)
    • Gao, Z., Smith, G., and, Minchin, R. (2002). " Budget and schedule success for small capital-facility projects." J. Manage. Eng., 18 (4), 186-193. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2002)18:4(186)
    • (2002) J. Manage. Eng. , vol.18 , Issue.4 , pp. 186-193
    • Gao, Z.1    Smith, G.2    Minchin, R.3
  • 19
    • 67349207068 scopus 로고    scopus 로고
    • A comprehensive model for planning and controlling contractor cash-flow
    • IPMAEL 0263-7863 10.1016/j.ijproman.2008.08.001
    • Gorog, M. (2009). " A comprehensive model for planning and controlling contractor cash-flow." Int. J. Proj. Manage., 27 (5), 481-492. IPMAEL 0263-7863 10.1016/j.ijproman.2008.08.001
    • (2009) Int. J. Proj. Manage. , vol.27 , Issue.5 , pp. 481-492
    • Gorog, M.1
  • 20
    • 34548689135 scopus 로고    scopus 로고
    • Estimating performance time for construction projects
    • JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2007)23:4(193)
    • Hoffman, G., Thal, A., Webb, T., and, Weir, J. (2007). " Estimating performance time for construction projects." J. Manage. Eng., 23 (4), 193-199. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2007)23:4(193)
    • (2007) J. Manage. Eng. , vol.23 , Issue.4 , pp. 193-199
    • Hoffman, G.1    Thal, A.2    Webb, T.3    Weir, J.4
  • 21
    • 33646584142 scopus 로고    scopus 로고
    • Optimal planning and scheduling for repetitive construction projects
    • JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2006)22:1(11)
    • Hyari, K., and, El-Rayes, K. (2006). " Optimal planning and scheduling for repetitive construction projects." J. Manage. Eng., 22 (1), 11-19. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2006)22:1(11)
    • (2006) J. Manage. Eng. , vol.22 , Issue.1 , pp. 11-19
    • Hyari, K.1    El-Rayes, K.2
  • 22
    • 18144374111 scopus 로고    scopus 로고
    • Factors affecting cost performance: Evidence from Indian construction projects
    • IPMAEL 0263-7863 10.1016/j.ijproman.2004.10.003
    • Iyer, K., and, Jha, K. (2005). " Factors affecting cost performance: Evidence from Indian construction projects." Int. J. Proj. Manage., 23 (4), 283-295. IPMAEL 0263-7863 10.1016/j.ijproman.2004.10.003
    • (2005) Int. J. Proj. Manage. , vol.23 , Issue.4 , pp. 283-295
    • Iyer, K.1    Jha, K.2
  • 23
    • 33845805688 scopus 로고    scopus 로고
    • Knowledge-based standard progress measurement for integrated cost and schedule performance control
    • 0733-9364 10.1061/(ASCE)0733-9364(2007)133:1(10)
    • Jung, Y., and, Kang, S. (2007). " Knowledge-based standard progress measurement for integrated cost and schedule performance control." J. Constr. Eng. Manage., 133 (1), 10-21. 0733-9364 10.1061/(ASCE)0733-9364(2007) 133:1(10)
    • (2007) J. Constr. Eng. Manage. , vol.133 , Issue.1 , pp. 10-21
    • Jung, Y.1    Kang, S.2
  • 24
    • 13944282234 scopus 로고    scopus 로고
    • Flexible work breakdown structure for integrated cost and schedule control
    • 0733-9364 10.1061/(ASCE)0733-9364(2004)130:5(616)
    • Jung, Y., and, Woo, S. (2004). " Flexible work breakdown structure for integrated cost and schedule control." J. Constr. Eng. Manage., 130 (5), 616-625. 0733-9364 10.1061/(ASCE)0733-9364(2004)130:5(616)
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.5 , pp. 616-625
    • Jung, Y.1    Woo, S.2
  • 25
    • 84992957330 scopus 로고    scopus 로고
    • The development of a benchmark model that uses historical data for monitoring the progress of current construction projects
    • 0969-9988 10.1046/j.1365-232x.1999.00112.x
    • Kaka, A. (1999). " The development of a benchmark model that uses historical data for monitoring the progress of current construction projects." Eng. Constr. Archit. Manage., 6 (3), 256-266. 0969-9988 10.1046/j.1365-232x.1999.00112.x
    • (1999) Eng. Constr. Archit. Manage. , vol.6 , Issue.3 , pp. 256-266
    • Kaka, A.1
  • 26
    • 22144498504 scopus 로고    scopus 로고
    • The relative impacts of selected practices on project cost and schedule
    • 0144-6193 10.1080/01446190500040232
    • Lee, S., Thomas, S., and, Tucker, R. (2005). " The relative impacts of selected practices on project cost and schedule." Constr. Manage. Econ., 23 (5), 545-553. 0144-6193 10.1080/01446190500040232
    • (2005) Constr. Manage. Econ. , vol.23 , Issue.5 , pp. 545-553
    • Lee, S.1    Thomas, S.2    Tucker, R.3
  • 27
    • 51849121510 scopus 로고    scopus 로고
    • Project performance evaluation based on statistical process control techniques
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:10(813)
    • Leu, S., and, Lin, Y. (2008). " Project performance evaluation based on statistical process control techniques." J. Constr. Eng. Manage., 134 (10), 813-819. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:10(813)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.10 , pp. 813-819
    • Leu, S.1    Lin, Y.2
  • 28
    • 2442471669 scopus 로고    scopus 로고
    • How project managers can better control the performance of design-build projects
    • IPMAEL 0263-7863 10.1016/j.ijproman.2003.09.003
    • Ling, F. (2004). " How project managers can better control the performance of design-build projects." Int. J. Proj. Manage., 22 (6), 477-488. IPMAEL 0263-7863 10.1016/j.ijproman.2003.09.003
    • (2004) Int. J. Proj. Manage. , vol.22 , Issue.6 , pp. 477-488
    • Ling, F.1
  • 29
    • 56749097044 scopus 로고    scopus 로고
    • Key project management practices affecting Singaporean firms' project performance in China
    • IPMAEL
    • Ling, Y., Low, S., Wang, S., and, Lim, H. (2009). " Key project management practices affecting Singaporean firms' project performance in China." Int. J. Proj. Manage., 27 (1), 59-71. IPMAEL
    • (2009) Int. J. Proj. Manage. , vol.27 , Issue.1 , pp. 59-71
    • Ling, Y.1    Low, S.2    Wang, S.3    Lim, H.4
  • 30
    • 32144432797 scopus 로고    scopus 로고
    • Sustainable construction and drivers of change in Greece: A Delphi study
    • 0144-6193 10.1080/01446190500204804
    • Manoliadis, O., Tsolas, I., and, Nakou, A. (2006). " Sustainable construction and drivers of change in Greece: A Delphi study." Constr. Manage. Econ., 24 (2), 113-120. 0144-6193 10.1080/01446190500204804
    • (2006) Constr. Manage. Econ. , vol.24 , Issue.2 , pp. 113-120
    • Manoliadis, O.1    Tsolas, I.2    Nakou, A.3
  • 32
    • 15844412260 scopus 로고    scopus 로고
    • Standardized project management may increase development projects success
    • IPMAEL 0263-7863 10.1016/j.ijproman.2004.11.002
    • Milosevic, D., and, Patanakul, P. (2005). " Standardized project management may increase development projects success." Int. J. Proj. Manage., 23 (3), 181-192. IPMAEL 0263-7863 10.1016/j.ijproman.2004.11.002
    • (2005) Int. J. Proj. Manage. , vol.23 , Issue.3 , pp. 181-192
    • Milosevic, D.1    Patanakul, P.2
  • 33
    • 27744523298 scopus 로고    scopus 로고
    • Evaluating cost overruns of asphalt paving projects using statistical process control methods
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2005)131:11(1173)
    • Nassar, K., Nassar, W., and, Hegab, M. (2005). " Evaluating cost overruns of asphalt paving projects using statistical process control methods." J. Constr. Eng. Manage., 131 (11), 1173-1178. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2005)131:11(1173)
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.11 , pp. 1173-1178
    • Nassar, K.1    Nassar, W.2    Hegab, M.3
  • 34
    • 77953674695 scopus 로고    scopus 로고
    • Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice
    • 0144-6193 10.1080/01446191003674519
    • Olawale, Y., and, Sun, M. (2010 a). " Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice." Constr. Manage. Econ., 28 (5), 509-526. 0144-6193 10.1080/01446191003674519
    • (2010) Constr. Manage. Econ. , vol.28 , Issue.5 , pp. 509-526
    • Olawale, Y.1    Sun, M.2
  • 35
    • 77953682107 scopus 로고    scopus 로고
    • Cost and time control of construction projects: A survey of contractors and consultants in the UK
    • Olawale, Y., and, Sun, M. (2010 b). " Cost and time control of construction projects: A survey of contractors and consultants in the UK." Constr. Inform. Quart., 11 (2), 53-59.
    • (2010) Constr. Inform. Quart. , vol.11 , Issue.2 , pp. 53-59
    • Olawale, Y.1    Sun, M.2
  • 37
    • 26644441907 scopus 로고    scopus 로고
    • Cost control in consulting engineering firms
    • JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2005)21:4(189)
    • Pellicer, E. (2005). " Cost control in consulting engineering firms." J. Manage. Eng., 21 (4), 189-192. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2005)21:4(189)
    • (2005) J. Manage. Eng. , vol.21 , Issue.4 , pp. 189-192
    • Pellicer, E.1
  • 38
    • 0032142667 scopus 로고    scopus 로고
    • From plan-do-check-action to PIDCAM: The further evolution of the Deming-wheel
    • IPMAEL 0263-7863 10.1016/S0263-7863(97)00031-8
    • Platje, A., and, Wadman, S. (1998). " From plan-do-check-action to PIDCAM: The further evolution of the Deming-wheel." Int. J. Proj. Manage., 16 (4), 201-208. IPMAEL 0263-7863 10.1016/S0263-7863(97)00031-8
    • (1998) Int. J. Proj. Manage. , vol.16 , Issue.4 , pp. 201-208
    • Platje, A.1    Wadman, S.2
  • 39
    • 0348146476 scopus 로고    scopus 로고
    • MPCS: Multidimensional project control system
    • IPMAEL 0263-7863 10.1016/S0263-7863(03)00002-4
    • Rozenes, S., Vitner, G., and, Spraggett, S. (2004). " MPCS: Multidimensional project control system." Int. J. Proj. Manage., 22 (2), 109-118. IPMAEL 0263-7863 10.1016/S0263-7863(03)00002-4
    • (2004) Int. J. Proj. Manage. , vol.22 , Issue.2 , pp. 109-118
    • Rozenes, S.1    Vitner, G.2    Spraggett, S.3
  • 40
    • 44649162020 scopus 로고    scopus 로고
    • Project control: Literature review
    • 1938-9507
    • Rozenes, S., Vitner, G., and, Spraggett, S. (2006). " Project control: Literature review." Proj. Manage. J., 37 (4), 4-14. 1938-9507
    • (2006) Proj. Manage. J. , vol.37 , Issue.4 , pp. 4-14
    • Rozenes, S.1    Vitner, G.2    Spraggett, S.3
  • 41
    • 70349342801 scopus 로고    scopus 로고
    • Construction project cost escalation factors
    • JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:4(221)
    • Shane, J., Molenaar, K., Anderson, S., and, Schexnayder, C. (2009). " Construction project cost escalation factors." J. Manage. Eng., 25 (4), 221-229. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:4(221)
    • (2009) J. Manage. Eng. , vol.25 , Issue.4 , pp. 221-229
    • Shane, J.1    Molenaar, K.2    Anderson, S.3    Schexnayder, C.4
  • 42
    • 1142293847 scopus 로고    scopus 로고
    • Performance indicators for micro-projects in developing countries
    • 0144-6193 10.1080/0144619042000186022
    • Sohail, M., and, Baldwin, A. (2004). " Performance indicators for micro-projects in developing countries." Constr. Manage. Econ., 22 (1), 11-23. 0144-6193 10.1080/0144619042000186022
    • (2004) Constr. Manage. Econ. , vol.22 , Issue.1 , pp. 11-23
    • Sohail, M.1    Baldwin, A.2
  • 43
    • 34548694839 scopus 로고    scopus 로고
    • The Delphi technique
    • JOGYDW 0144-3615 10.1576/toag.7.2.120.27071
    • Thangaratinam, S., and, Redman, C. (2005). " The Delphi technique." Obstet. Gynecologist, 7 (2), 120-125. JOGYDW 0144-3615 10.1576/toag.7.2.120.27071
    • (2005) Obstet. Gynecologist , vol.7 , Issue.2 , pp. 120-125
    • Thangaratinam, S.1    Redman, C.2
  • 45
    • 33645967441 scopus 로고    scopus 로고
    • A comparison of different project duration forecasting methods using earned value metrics
    • IPMAEL 0263-7863 10.1016/j.ijproman.2005.10.004
    • Vandevoorde, S., and, Vanhoucke, M. (2005). " A comparison of different project duration forecasting methods using earned value metrics." Int. J. Proj. Manage., 24 (4), 289-302. IPMAEL 0263-7863 10.1016/j.ijproman. 2005.10.004
    • (2005) Int. J. Proj. Manage. , vol.24 , Issue.4 , pp. 289-302
    • Vandevoorde, S.1    Vanhoucke, M.2
  • 47
    • 0036132577 scopus 로고    scopus 로고
    • Current practice in project management - An empirical study
    • IPMAEL
    • White, D., and, Fortune, J. (2002). " Current practice in project management-An empirical study." Int. J. Proj. Manage., 20 (2), 1-11. IPMAEL
    • (2002) Int. J. Proj. Manage. , vol.20 , Issue.2 , pp. 1-11
    • White, D.1    Fortune, J.2
  • 48
    • 2342446285 scopus 로고    scopus 로고
    • Construction time performance: An evaluation of contractors from Japan, the UK and the US
    • 0969-9988
    • Xiao, H., and, Proverbs, D. (2002). " Construction time performance: An evaluation of contractors from Japan, the UK and the US." Eng. Constr. Archit. Manage., 9 (2), 81-89. 0969-9988
    • (2002) Eng. Constr. Archit. Manage. , vol.9 , Issue.2 , pp. 81-89
    • Xiao, H.1    Proverbs, D.2
  • 49
    • 62549151788 scopus 로고    scopus 로고
    • Developing a performance index for relationship-based construction projects in Australia: Delphi study
    • JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:2(59)
    • Yeung, J., Chan, P., and, Chan, D. (2009). " Developing a performance index for relationship-based construction projects in Australia: Delphi study." J. Manage. Eng., 25 (2), 59-67. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2009)25:2(59)
    • (2009) J. Manage. Eng. , vol.25 , Issue.2 , pp. 59-67
    • Yeung, J.1    Chan, P.2    Chan, D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.