메뉴 건너뛰기




Volumn 18, Issue 4, 2002, Pages 186-193

Budget and schedule success for small capital-facility projects

Author keywords

Budgets; Data analysis; Project management; Project planning

Indexed keywords

BUDGETS; CONSTRUCTION PROJECTS; PROJECT PLANNING; TEAM-BUILDING PROCESSES;

EID: 14744299396     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0742-597X(2002)18:4(186)     Document Type: Article
Times cited : (12)

References (17)
  • 1
    • 0001980630 scopus 로고
    • The determinants of construction project success
    • Ashley, D. B., Jaselskis, E. J., and Lurie, C. B. (1987). "The determinants of construction project success." Proj. Manage. J., XVIII(2), 69-79.
    • (1987) Proj. Manage. J. , vol.18 , Issue.2 , pp. 69-79
    • Ashley, D.B.1    Jaselskis, E.J.2    Lurie, C.B.3
  • 2
    • 0034149307 scopus 로고    scopus 로고
    • Establishment of critical success factors for construction partnering
    • Cheng, E. W. L., Li, H., and Love, P. E. D. (2000). "Establishment of critical success factors for construction partnering." J. Manage. Eng., 16(2), 84-92.
    • (2000) J. Manage. Eng. , vol.16 , Issue.2 , pp. 84-92
    • Cheng, E.W.L.1    Li, H.2    Love, P.E.D.3
  • 3
    • 0032688614 scopus 로고    scopus 로고
    • Critical success factors for different project objectives
    • Chua, D. K. H., Kog, Y. C., and Loh, P. K. (1999). "Critical success factors for different project objectives." J. Constr. Eng. Manage., 125(3), 142-150.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 142-150
    • Chua, D.K.H.1    Kog, Y.C.2    Loh, P.K.3
  • 4
    • 14744301184 scopus 로고
    • Measuring success: The owner's viewpoint
    • Montreal
    • Cleland, D. I. (1986). "Measuring success: The owner's viewpoint." Proc., Project Management Institute, Montreal, 6-12.
    • (1986) Proc., Project Management Institute , pp. 6-12
    • Cleland, D.I.1
  • 5
    • 0032646011 scopus 로고    scopus 로고
    • Partnering on small construction projects
    • Conley, M. A., and Gregory, R. A. (1999). "Partnering on small construction projects." J. Constr. Eng. Manage., 125(5), 320-324.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 320-324
    • Conley, M.A.1    Gregory, R.A.2
  • 6
    • 0344290484 scopus 로고
    • Measuring project success: An illusion
    • Montreal
    • de Wit, A. (1986). "Measuring project success: An illusion." Proc., Project Management Institute, Montreal, 13-21.
    • (1986) Proc., Project Management Institute , pp. 13-21
    • De Wit, A.1
  • 7
    • 0033705228 scopus 로고    scopus 로고
    • Benefits of small projects team initiative
    • Dunston, P. S., and Reed, A. G. (2000). "Benefits of small projects team initiative." J. Constr. Eng. Manage., 126(1), 22-28.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.1 , pp. 22-28
    • Dunston, P.S.1    Reed, A.G.2
  • 8
    • 0026172617 scopus 로고
    • Optical allocation of project management resources for achieving success
    • Jaselskis, E. J., and Ashley, D. B. (1991). "Optical allocation of project management resources for achieving success." J. Constr. Eng. Manage., 117(2), 321-340.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.2 , pp. 321-340
    • Jaselskis, E.J.1    Ashley, D.B.2
  • 9
    • 0342702819 scopus 로고
    • The possibility of anticipating, several years in advance, the success or failure of a project
    • Montreal
    • Jolivet, F., and Batignolles, S. (1986). "The possibility of anticipating, several years in advance, the success or failure of a project." Proc., Project Management Institute, Montreal, 35-39.
    • (1986) Proc., Project Management Institute , pp. 35-39
    • Jolivet, F.1    Batignolles, S.2
  • 10
    • 14744290157 scopus 로고
    • Measuring success: Establishing and maintaining a baseline
    • Montreal
    • McCoy, F. A. (1986). "Measuring success: Establishing and maintaining a baseline." Proc., Project Management Institute, Montreal, 47-52.
    • (1986) Proc., Project Management Institute , pp. 47-52
    • McCoy, F.A.1
  • 11
    • 0022059186 scopus 로고
    • The role of structural factors in determining project management success
    • Might, R. J., and Fischer, W. A. (1985). "The role of structural factors in determining project management success." IEEE Trans. Eng. Manage., 32(2), 71-77.
    • (1985) IEEE Trans. Eng. Manage. , vol.32 , Issue.2 , pp. 71-77
    • Might, R.J.1    Fischer, W.A.2
  • 12
    • 0003098535 scopus 로고
    • Research at Oxford into the preconditions of success and failure of major projects
    • Montreal
    • Morris, P. W. G. (1986). "Research at Oxford into the preconditions of success and failure of major projects." Proc., Project Management Institute, Montreal, 53-66.
    • (1986) Proc., Project Management Institute , pp. 53-66
    • Morris, P.W.G.1
  • 14
    • 0028732528 scopus 로고
    • Critical analysis of time and cost of management and traditional contracts
    • Naoum, S. G. (1994). "Critical analysis of time and cost of management and traditional contracts." J. Constr. Eng. Manage., 120(4), 687-705.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.4 , pp. 687-705
    • Naoum, S.G.1
  • 15
    • 0001926527 scopus 로고
    • Project success: Definition and measurement techniques
    • Pinto, J. K., and Slevin, D. P. (1988). "Project success: Definition and measurement techniques." Proj. Manage. J., XIX(1), 67-72.
    • (1988) Proj. Manage. J. , vol.19 , Issue.1 , pp. 67-72
    • Pinto, J.K.1    Slevin, D.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.