Volumn 26, Issue 2, 2010, Pages 78-88

Integrated schedule and cost model for repetitive construction process

Author keywords

Construction cost; Core walls; Decision making; Integrated systems; Models; Planning; Scheduling

Indexed keywords

CONSTRUCTION COSTS; CONSTRUCTION PROCESS; CONSTRUCTION PROJECTS; CONSTRUCTION SITES; CORE WALL; CORE WALLS; COST MODELS; HIGH RISE BUILDING; INTEGRATED SCHEDULE; INTEGRATED SYSTEMS; INTEGRATION MODELS; PLANNING AND CONTROL; PROJECT MANAGERS; REPETITIVE PROCESS;

EID: 77949667255     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000009     Document Type: Article
Times cited : (21)

References (15)
  • 1
    • 77949669960 scopus 로고
    • A process oriented planning and control model for computer integrated construction
    • ASCE, Reston, Va..
    • Attia, T., and Dernold, L. (1994). " A process oriented planning and control model for computer integrated construction.." Proc., Computing in Civil Engineering, ASCE, Reston, Va., 1756-1763.
    • (1994) Proc., Computing in Civil Engineering , pp. 1756-1763
    • Attia, T.1    Dernold, L.2
  • 2
    • 0027609613 scopus 로고
    • Cost, schedule, and time variances and integration
    • JMENEA 0742-597X.
    • Car, R. (1993). " Cost, schedule, and time variances and integration.." J. Manage. Eng. JMENEA 0742-597X, 119 (2), 245-265.
    • (1993) J. Manage. Eng. , vol.119 , Issue.2 , pp. 245-265
    • Car, R.1
  • 3
    • 77949667255 scopus 로고    scopus 로고
    • Integrated schedule and cost model for repetitive construction process
    • " JMENEA 0742-597X, (),. 10.1061/(ASCE)0742-597X(2010)26:1(19)
    • Cho, K., Hong, T., and Hyun, C. (2010). " Integrated schedule and cost model for repetitive construction process.." J. Manage. Eng. JMENEA 0742-597X, 26 (2), 78-88. 10.1061/(ASCE)0742-597X(2010)26:1(19)
    • (2010) J. Manage. Eng. , vol.26 , Issue.2 , pp. 78-88
    • Cho, K.1    Hong, T.2    Hyun, C.3
  • 4
    • 77949671688 scopus 로고    scopus 로고
    • Earned value management system
    • Project Management Institute, Arlington, Va.
    • Fleming, Q., and Koppleman, J. (1996). " Earned value management system.." EIA Publication No. ANSI/EIA-748-1998, Project Management Institute, Arlington, Va.
    • (1996) EIA Publication No. ANSI/EIA-748-1998
    • Fleming, Q.1    Koppleman, J.2
  • 6
    • 46849098451 scopus 로고    scopus 로고
    • Production prediction of conventional and earthmoving systems using a simulation methodology and multiple regression analysis
    • " CJCEB8 0315-1468, (),. 10.1139/L08-005
    • Han, S., Hong, T., and Lee, S. (2008). " Production prediction of conventional and earthmoving systems using a simulation methodology and multiple regression analysis.." Can. J. Civ. Eng. CJCEB8 0315-1468, 35 (6), 574-587. 10.1139/L08-005
    • (2008) Can. J. Civ. Eng. , vol.35 , Issue.6 , pp. 574-587
    • Han, S.1    Hong, T.2    Lee, S.3
  • 8
    • 79959412033 scopus 로고    scopus 로고
    • A simulation-based schedule control model for core wall construction of high-rise building
    • " JCEMD4 0733-9364 (under review).
    • Hong, T., Cho, K., Hyun, C., and Han, S. (2010). " A simulation-based schedule control model for core wall construction of high-rise building.." J. Constr. Eng. Manage. JCEMD4 0733-9364 (under review).
    • (2010) J. Constr. Eng. Manage.
    • Hong, T.1    Cho, K.2    Hyun, C.3    Han, S.4
  • 9
    • 34147170085 scopus 로고    scopus 로고
    • Simulation study on construction process of FRP bridge deck panels
    • DOI 10.1016/j.autcon.2006.10.004, PII S0926580506001105
    • Hong, T., and Hastak, M. (2007). " Simulation study on construction process of FRP bridge deck panels.." Autom. Constr. AUCOES 0926-5805, 16 (5), 620-631. 10.1016/j.autcon.2006.10.004 (Pubitemid 46575191)
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 620-631
    • Hong, T.1    Hastak, M.2
  • 10
    • 8644292857 scopus 로고    scopus 로고
    • Multiple simulation analysis for probabilistic cost and schedule integration
    • JMENEA 0742-597X.
    • Isidore, L., and Back, W. (2002). " Multiple simulation analysis for probabilistic cost and schedule integration.." J. Manage. Eng. JMENEA 0742-597X, 128 (3), 211-219.
    • (2002) J. Manage. Eng. , vol.128 , Issue.3 , pp. 211-219
    • Isidore, L.1    Back, W.2
  • 11
    • 13944282234 scopus 로고    scopus 로고
    • Flexible work breakdown structure for integrated cost and schedule control
    • JMENEA 0742-597X.
    • Jung, Y., and Woo, S. (2004). " Flexible work breakdown structure for integrated cost and schedule control.." J. Manage. Eng. JMENEA 0742-597X, 130 (5), 616-625.
    • (2004) J. Manage. Eng. , vol.130 , Issue.5 , pp. 616-625
    • Jung, Y.1    Woo, S.2
  • 14
    • 0026219168 scopus 로고
    • Cost and schedule control integration: Issues and needs
    • JMENEA 0742-597X.
    • Rasdorf, W., and Abudayyeh, O. (1991). " Cost and schedule control integration: Issues and needs.." J. Manage. Eng. JMENEA 0742-597X, 117 (3), 486-502.
    • (1991) J. Manage. Eng. , vol.117 , Issue.3 , pp. 486-502
    • Rasdorf, W.1    Abudayyeh, O.2
  • 15
    • 0025447970 scopus 로고
    • RPM: Repetitive project modeling
    • JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1990)116:2(316)
    • Reda, R. (1990). " RPM: Repetitive project modeling.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 116 (2), 316-330. 10.1061/(ASCE)0733- 9364(1990)116:2(316)
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.2 , pp. 316-330
    • Reda, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.