A process oriented planning and control model for computer integrated construction
-
ASCE, Reston, Va..
-
Attia, T., and Dernold, L. (1994). " A process oriented planning and control model for computer integrated construction.." Proc., Computing in Civil Engineering, ASCE, Reston, Va., 1756-1763.
-
(1994)
Proc., Computing in Civil Engineering
, pp. 1756-1763
-
-
Attia, T.1
Dernold, L.2
-
2
-
-
0027609613
-
Cost, schedule, and time variances and integration
-
JMENEA 0742-597X.
-
Car, R. (1993). " Cost, schedule, and time variances and integration.." J. Manage. Eng. JMENEA 0742-597X, 119 (2), 245-265.
-
(1993)
J. Manage. Eng.
, vol.119
, Issue.2
, pp. 245-265
-
-
Car, R.1
-
3
-
-
77949667255
-
Integrated schedule and cost model for repetitive construction process
-
" JMENEA 0742-597X, (),. 10.1061/(ASCE)0742-597X(2010)26:1(19)
-
Cho, K., Hong, T., and Hyun, C. (2010). " Integrated schedule and cost model for repetitive construction process.." J. Manage. Eng. JMENEA 0742-597X, 26 (2), 78-88. 10.1061/(ASCE)0742-597X(2010)26:1(19)
-
(2010)
J. Manage. Eng.
, vol.26
, Issue.2
, pp. 78-88
-
-
Cho, K.1
Hong, T.2
Hyun, C.3
-
4
-
-
77949671688
-
Earned value management system
-
Project Management Institute, Arlington, Va.
-
Fleming, Q., and Koppleman, J. (1996). " Earned value management system.." EIA Publication No. ANSI/EIA-748-1998, Project Management Institute, Arlington, Va.
-
(1996)
EIA Publication No. ANSI/EIA-748-1998
-
-
Fleming, Q.1
Koppleman, J.2
-
6
-
-
46849098451
-
Production prediction of conventional and earthmoving systems using a simulation methodology and multiple regression analysis
-
" CJCEB8 0315-1468, (),. 10.1139/L08-005
-
Han, S., Hong, T., and Lee, S. (2008). " Production prediction of conventional and earthmoving systems using a simulation methodology and multiple regression analysis.." Can. J. Civ. Eng. CJCEB8 0315-1468, 35 (6), 574-587. 10.1139/L08-005
-
(2008)
Can. J. Civ. Eng.
, vol.35
, Issue.6
, pp. 574-587
-
-
Han, S.1
Hong, T.2
Lee, S.3
-
7
-
-
0003921398
-
-
Prentice-Hall, Englewood Cliffs, N.J.
-
Hendrickson, C. T., and Au, T. (1989). Project management for construction: Fundamental concepts for owners, engineers, architects, and builders, Prentice-Hall, Englewood Cliffs, N.J.
-
(1989)
Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders
-
-
Hendrickson, C.T.1
Au, T.2
-
8
-
-
79959412033
-
A simulation-based schedule control model for core wall construction of high-rise building
-
" JCEMD4 0733-9364 (under review).
-
Hong, T., Cho, K., Hyun, C., and Han, S. (2010). " A simulation-based schedule control model for core wall construction of high-rise building.." J. Constr. Eng. Manage. JCEMD4 0733-9364 (under review).
-
(2010)
J. Constr. Eng. Manage.
-
-
Hong, T.1
Cho, K.2
Hyun, C.3
Han, S.4
-
9
-
-
34147170085
-
Simulation study on construction process of FRP bridge deck panels
-
DOI 10.1016/j.autcon.2006.10.004, PII S0926580506001105
-
Hong, T., and Hastak, M. (2007). " Simulation study on construction process of FRP bridge deck panels.." Autom. Constr. AUCOES 0926-5805, 16 (5), 620-631. 10.1016/j.autcon.2006.10.004 (Pubitemid 46575191)
-
(2007)
Automation in Construction
, vol.16
, Issue.5
, pp. 620-631
-
-
Hong, T.1
Hastak, M.2
-
10
-
-
8644292857
-
Multiple simulation analysis for probabilistic cost and schedule integration
-
JMENEA 0742-597X.
-
Isidore, L., and Back, W. (2002). " Multiple simulation analysis for probabilistic cost and schedule integration.." J. Manage. Eng. JMENEA 0742-597X, 128 (3), 211-219.
-
(2002)
J. Manage. Eng.
, vol.128
, Issue.3
, pp. 211-219
-
-
Isidore, L.1
Back, W.2
-
11
-
-
13944282234
-
Flexible work breakdown structure for integrated cost and schedule control
-
JMENEA 0742-597X.
-
Jung, Y., and Woo, S. (2004). " Flexible work breakdown structure for integrated cost and schedule control.." J. Manage. Eng. JMENEA 0742-597X, 130 (5), 616-625.
-
(2004)
J. Manage. Eng.
, vol.130
, Issue.5
, pp. 616-625
-
-
Jung, Y.1
Woo, S.2
-
14
-
-
0026219168
-
Cost and schedule control integration: Issues and needs
-
JMENEA 0742-597X.
-
Rasdorf, W., and Abudayyeh, O. (1991). " Cost and schedule control integration: Issues and needs.." J. Manage. Eng. JMENEA 0742-597X, 117 (3), 486-502.
-
(1991)
J. Manage. Eng.
, vol.117
, Issue.3
, pp. 486-502
-
-
Rasdorf, W.1
Abudayyeh, O.2
-
15
-
-
0025447970
-
RPM: Repetitive project modeling
-
JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1990)116:2(316)
-
Reda, R. (1990). " RPM: Repetitive project modeling.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 116 (2), 316-330. 10.1061/(ASCE)0733- 9364(1990)116:2(316)
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.2
, pp. 316-330
-
-
Reda, R.1
|