메뉴 건너뛰기




Volumn 22, Issue 6, 2004, Pages 477-488

How project managers can better control the performance of design-build projects

Author keywords

Cost; Procurement; Quality; Success and strategy; Time

Indexed keywords

CONTRACTS; MANAGERS; QUALITY ASSURANCE;

EID: 2442471669     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2003.09.003     Document Type: Article
Times cited : (61)

References (22)
  • 1
    • 0000610842 scopus 로고
    • Determinants of performance in the traditional building process
    • Mohsini R.A. Davidson C.H. Determinants of performance in the traditional building process Construct. Mgmt. Econ. 10 4 1992 343-359
    • (1992) Construct. Mgmt. Econ. , vol.10 , Issue.4 , pp. 343-359
    • Mohsini, R.A.1    Davidson, C.H.2
  • 5
    • 0032207592 scopus 로고    scopus 로고
    • Comparison of US project delivery systems
    • Konchar M. Sanvido V. Comparison of US project delivery systems J. Construct. Eng. Mgmt. 124 6 1998 435-444
    • (1998) J. Construct. Eng. Mgmt. , vol.124 , Issue.6 , pp. 435-444
    • Konchar, M.1    Sanvido, V.2
  • 6
    • 0032208060 scopus 로고    scopus 로고
    • Model for public sector design-build project selection
    • Molenaar K.R. Songer A.D. Model for public sector design-build project selection J. Construct. Eng. Mgmt. 124 6 1998 467-479
    • (1998) J. Construct. Eng. Mgmt. , vol.124 , Issue.6 , pp. 467-479
    • Molenaar, K.R.1    Songer, A.D.2
  • 7
    • 0001842404 scopus 로고    scopus 로고
    • The logical framework method for defining project success
    • Baccarini D. The logical framework method for defining project success Project Mgmt. J. 30 4 1999 25-32
    • (1999) Project Mgmt. J. , vol.30 , Issue.4 , pp. 25-32
    • Baccarini, D.1
  • 8
    • 0026172617 scopus 로고
    • Optimal allocation of project management resources for achieving success
    • Jaselskis E.J. Ashley D.B. Optimal allocation of project management resources for achieving success J. Construct. Eng. Mgmt. 117 2 1991 321-340
    • (1991) J. Construct. Eng. Mgmt. , vol.117 , Issue.2 , pp. 321-340
    • Jaselskis, E.J.1    Ashley, D.B.2
  • 9
    • 5244317236 scopus 로고    scopus 로고
    • Model for construction budget performance - neural network approach
    • Chua D.K.H. Kog Y.C. Loh P.K. Jaselskis E.J. Model for construction budget performance - neural network approach J. Construct. Eng. Mgmt. 123 3 1997 214-222
    • (1997) J. Construct. Eng. Mgmt. , vol.123 , Issue.3 , pp. 214-222
    • Chua, D.K.H.1    Kog, Y.C.2    Loh, P.K.3    Jaselskis, E.J.4
  • 10
    • 0032688614 scopus 로고    scopus 로고
    • Critical success factors for different project objectives
    • Chua D.K.H. Kog Y.C. Loh P.K. Critical success factors for different project objectives J. Construct. Eng. Mgmt. 125 3 1999 142-150
    • (1999) J. Construct. Eng. Mgmt. , vol.125 , Issue.3 , pp. 142-150
    • Chua, D.K.H.1    Kog, Y.C.2    Loh, P.K.3
  • 12
    • 0035280018 scopus 로고    scopus 로고
    • Design and build project success factors: Multivariate analysis
    • Chan A.P.C. Ho D.C.K. Tam C.M. Design and build project success factors: Multivariate analysis J. Construct. Eng. Mgmt. 127 2 2001 93-100
    • (2001) J. Construct. Eng. Mgmt. , vol.127 , Issue.2 , pp. 93-100
    • Chan, A.P.C.1    Ho, D.C.K.2    Tam, C.M.3
  • 16
    • 0000942012 scopus 로고    scopus 로고
    • Evaluating contractor prequalification data: Selection criteria and project success factors
    • Hatush Z. Skitmore M. Evaluating contractor prequalification data: Selection criteria and project success factors Construct. Mgmt. Econ. 15 1997 129-147
    • (1997) Construct. Mgmt. Econ. , vol.15 , pp. 129-147
    • Hatush, Z.1    Skitmore, M.2
  • 17
    • 0028452760 scopus 로고
    • Building procurement by design and build approach
    • Ndekugri I. Turner A. Building procurement by design and build approach J. Construct. Eng. Mgmt. 120 1994 243-256
    • (1994) J. Construct. Eng. Mgmt. , vol.120 , pp. 243-256
    • Ndekugri, I.1    Turner, A.2
  • 18
    • 58149372734 scopus 로고
    • Impact of job experience and ability on job knowledge, work sample performance, and supervisory ratings of job performance
    • Schmidt F.L. Hunter J.E. Outerbridge A.N. Impact of job experience and ability on job knowledge, work sample performance, and supervisory ratings of job performance J. Appl. Psychol. 71 1986 432-439
    • (1986) J. Appl. Psychol. , vol.71 , pp. 432-439
    • Schmidt, F.L.1    Hunter, J.E.2    Outerbridge, A.N.3
  • 19
    • 0000995248 scopus 로고    scopus 로고
    • Relationship between project interaction and performance indicators
    • Pocock J.B. Chang T.H. Liang Y.L. Kim M.K. Relationship between project interaction and performance indicators J. Construct. Eng. Mgmt. 122 3 1996 165-176
    • (1996) J. Construct. Eng. Mgmt. , vol.122 , Issue.3 , pp. 165-176
    • Pocock, J.B.1    Chang, T.H.2    Liang, Y.L.3    Kim, M.K.4
  • 20
    • 2142765733 scopus 로고    scopus 로고
    • A theoretical model for optimum project (time) performance based on European best practice
    • Proverbs D.G. Holt G.D. A theoretical model for optimum project (time) performance based on European best practice Construct. Mgmt. Econ. 17 2000 657-665
    • (2000) Construct. Mgmt. Econ. , vol.17 , pp. 657-665
    • Proverbs, D.G.1    Holt, G.D.2
  • 22
    • 0032643154 scopus 로고    scopus 로고
    • Construction delivery system of the information age
    • Kashiwagi D.T. Construction delivery system of the information age Automat. Construct. 8 4 1999 417-425
    • (1999) Automat. Construct. , vol.8 , Issue.4 , pp. 417-425
    • Kashiwagi, D.T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.