-
1
-
-
0033154342
-
Robustness of the EWMA control charts to non-normality
-
Borror, C. M., Montgomery, D. C., and Runger, G. C. (1999). "Robustness of the EWMA control charts to non-normality." J. Quality Technol., 31(3), 16-25.
-
(1999)
J. Quality Technol.
, vol.31
, Issue.3
, pp. 16-25
-
-
Borror, C.M.1
Montgomery, D.C.2
Runger, G.C.3
-
2
-
-
0003084462
-
An EWMA for monitoring a process standard deviation
-
Crowder, S. V. (1992). "An EWMA for monitoring a process standard deviation." J. Quality Technol., 24(1), 13-17.
-
(1992)
J. Quality Technol.
, vol.24
, Issue.1
, pp. 13-17
-
-
Crowder, S.V.1
-
3
-
-
27744599234
-
Project cost overruns survey of problems and recommended best practices
-
Southern Resource Center, Washington, D.C.
-
Federal Highway Administration (FHWA) (2001), "Project cost overruns survey of problems and recommended best practices." Quality Financial Management Initiative fiscal year 2001, Southern Resource Center, Washington, D.C.
-
(2001)
Quality Financial Management Initiative Fiscal Year 2001
-
-
-
4
-
-
0003861240
-
-
Productivity Press, Shelton, Conn.
-
Hartley, J. R., and Okamoto, S. (1997). Concurrent engineering: Shortening lead times, raising quality, and lowering costs, Productivity Press, Shelton, Conn.
-
(1997)
Concurrent Engineering: Shortening Lead Times, Raising Quality, and Lowering Costs
-
-
Hartley, J.R.1
Okamoto, S.2
-
5
-
-
0028194226
-
Economic design of control charts: A literature review for 1981-1991
-
Ho, C., and Case, K. E. (1994). "Economic design of control charts: A literature review for 1981-1991." J. Quality Technol., 26(3), 25-27.
-
(1994)
J. Quality Technol.
, vol.26
, Issue.3
, pp. 25-27
-
-
Ho, C.1
Case, K.E.2
-
6
-
-
84947789021
-
-
Wiley Series in Probability and Statistics, Wiley, New York
-
Hosmer, D., and Lemeshow, S. (1999). Applied survival analysis: Regression modeling of time to event data, Wiley Series in Probability and Statistics, Wiley, New York.
-
(1999)
Applied Survival Analysis: Regression Modeling of Time to Event Data
-
-
Hosmer, D.1
Lemeshow, S.2
-
7
-
-
27744442193
-
Contract change
-
Illinois Department of Transportation, (IDOT) (2001). "Contract change." Construction Memorandum Number 01-4, 111.
-
(2001)
Construction Memorandum Number 01-4
, vol.1
, Issue.4
, pp. 111
-
-
-
8
-
-
0025494340
-
Predictors of cost-overrun rates
-
Jahren, C., and Asha, A. (1990). "Predictors of cost-overrun rates." J. Constr. Eng. Manage., 116(3), 548-552.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.3
, pp. 548-552
-
-
Jahren, C.1
Asha, A.2
-
9
-
-
27744600536
-
The performance of control charts for monitoring process variation
-
Lowry, C. A., Champ, C. W., and Woodall, W. H. (1995). "The performance of control charts for monitoring process variation." Commun. Stat.-Simul. Comput., 21(4), 15-19.
-
(1995)
Commun. Stat.-simul. Comput.
, vol.21
, Issue.4
, pp. 15-19
-
-
Lowry, C.A.1
Champ, C.W.2
Woodall, W.H.3
-
11
-
-
0031124154
-
A discussion of statistically-based process monitoring and control
-
Montgomery, D. C., and Woodall, W. H., ed. (1997). "A discussion of statistically-based process monitoring and control." J. Quality Technol., 29(2), 8-12.
-
(1997)
J. Quality Technol.
, vol.29
, Issue.2
, pp. 8-12
-
-
Montgomery, D.C.1
Woodall, W.H.2
|