메뉴 건너뛰기




Volumn 131, Issue 11, 2005, Pages 1173-1178

Evaluating cost overruns of asphalt paving project using statistical process control methods

Author keywords

Asphalt pavements; Construction industry; Cost control; Project management

Indexed keywords

CONTRACTED COST; CONTROL CHARTS; COST CONTROL; INDIVIDUALS AND MOVING RANGE;

EID: 27744523298     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:11(1173)     Document Type: Article
Times cited : (28)

References (11)
  • 1
    • 0033154342 scopus 로고    scopus 로고
    • Robustness of the EWMA control charts to non-normality
    • Borror, C. M., Montgomery, D. C., and Runger, G. C. (1999). "Robustness of the EWMA control charts to non-normality." J. Quality Technol., 31(3), 16-25.
    • (1999) J. Quality Technol. , vol.31 , Issue.3 , pp. 16-25
    • Borror, C.M.1    Montgomery, D.C.2    Runger, G.C.3
  • 2
    • 0003084462 scopus 로고
    • An EWMA for monitoring a process standard deviation
    • Crowder, S. V. (1992). "An EWMA for monitoring a process standard deviation." J. Quality Technol., 24(1), 13-17.
    • (1992) J. Quality Technol. , vol.24 , Issue.1 , pp. 13-17
    • Crowder, S.V.1
  • 3
    • 27744599234 scopus 로고    scopus 로고
    • Project cost overruns survey of problems and recommended best practices
    • Southern Resource Center, Washington, D.C.
    • Federal Highway Administration (FHWA) (2001), "Project cost overruns survey of problems and recommended best practices." Quality Financial Management Initiative fiscal year 2001, Southern Resource Center, Washington, D.C.
    • (2001) Quality Financial Management Initiative Fiscal Year 2001
  • 5
    • 0028194226 scopus 로고
    • Economic design of control charts: A literature review for 1981-1991
    • Ho, C., and Case, K. E. (1994). "Economic design of control charts: A literature review for 1981-1991." J. Quality Technol., 26(3), 25-27.
    • (1994) J. Quality Technol. , vol.26 , Issue.3 , pp. 25-27
    • Ho, C.1    Case, K.E.2
  • 7
    • 27744442193 scopus 로고    scopus 로고
    • Contract change
    • Illinois Department of Transportation, (IDOT) (2001). "Contract change." Construction Memorandum Number 01-4, 111.
    • (2001) Construction Memorandum Number 01-4 , vol.1 , Issue.4 , pp. 111
  • 8
    • 0025494340 scopus 로고
    • Predictors of cost-overrun rates
    • Jahren, C., and Asha, A. (1990). "Predictors of cost-overrun rates." J. Constr. Eng. Manage., 116(3), 548-552.
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.3 , pp. 548-552
    • Jahren, C.1    Asha, A.2
  • 9
    • 27744600536 scopus 로고
    • The performance of control charts for monitoring process variation
    • Lowry, C. A., Champ, C. W., and Woodall, W. H. (1995). "The performance of control charts for monitoring process variation." Commun. Stat.-Simul. Comput., 21(4), 15-19.
    • (1995) Commun. Stat.-simul. Comput. , vol.21 , Issue.4 , pp. 15-19
    • Lowry, C.A.1    Champ, C.W.2    Woodall, W.H.3
  • 11
    • 0031124154 scopus 로고    scopus 로고
    • A discussion of statistically-based process monitoring and control
    • Montgomery, D. C., and Woodall, W. H., ed. (1997). "A discussion of statistically-based process monitoring and control." J. Quality Technol., 29(2), 8-12.
    • (1997) J. Quality Technol. , vol.29 , Issue.2 , pp. 8-12
    • Montgomery, D.C.1    Woodall, W.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.