메뉴 건너뛰기




Volumn 2, Issue 2, 2011, Pages 283-294

A comprehensive mathematical model for hybrid flexible flowshop lot streaming problem

Author keywords

Hybrid flexible flowshop; Lot streaming; Mathematical model; Scheduling

Indexed keywords


EID: 84871304178     PISSN: 19232926     EISSN: 19232934     Source Type: Journal    
DOI: 10.5267/j.ijiec.2010.07.006     Document Type: Article
Times cited : (12)

References (35)
  • 1
    • 21844508729 scopus 로고
    • Lot streaming in the two-machine flow shop with setup times
    • Baker, K. (1995). Lot streaming in the two-machine flow shop with setup times. Annals of Operations Research, 57, 1-11.
    • (1995) Annals of Operations Research , vol.57 , pp. 1-11
    • Baker, K.1
  • 3
    • 3342903540 scopus 로고    scopus 로고
    • A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation
    • Bertel, S. & Billaut, J. C. (2004). A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation. European Journal of Operational Research, 159, 651-662.
    • (2004) European Journal of Operational Research , vol.159 , pp. 651-662
    • Bertel, S.1    Billaut, J.C.2
  • 4
    • 33644634541 scopus 로고    scopus 로고
    • Lot streaming with varaibal sublots: An integer programming formulation
    • Biskup, D. & Feldmann, M. (2006). Lot streaming with varaibal sublots: an integer programming formulation. Journal of Operational Research Society, 57, 296-303.
    • (2006) Journal of Operational Research Society , vol.57 , pp. 296-303
    • Biskup, D.1    Feldmann, M.2
  • 5
    • 0004026826 scopus 로고
    • Business One Irwin, Burr Ridge, IL, Bockerstette, J. & Shell, R. (1993). Time Based Manufacturing. McGraw-Hill, New York
    • Blackburn, J. (1991). Time-Based Competition. Business One Irwin, Burr Ridge, IL, Bockerstette, J. & Shell, R. (1993). Time Based Manufacturing. McGraw-Hill, New York,
    • (1991) Time-Based Competition
    • Blackburn, J.1
  • 6
    • 0033906893 scopus 로고    scopus 로고
    • Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
    • Botta-Genoulaz, V. (2000). Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness. International Journal of Production Economics, 64, 101-111.
    • (2000) International Journal of Production Economics , vol.64 , pp. 101-111
    • Botta-Genoulaz, V.1
  • 7
    • 1642461394 scopus 로고    scopus 로고
    • Multi-objective lot splitting for a single product m-machine flowshop line
    • Bukchin, J. & Masin, M. (2004). Multi-objective lot splitting for a single product m-machine flowshop line. IIE Transactions, 36, 191-202.
    • (2004) IIE Transactions , vol.36 , pp. 191-202
    • Bukchin, J.1    Masin, M.2
  • 9
    • 0031076263 scopus 로고    scopus 로고
    • Lot streaming with detached setups in three-machine flow shops
    • Chen, J. & Steiner, G. (1996). Lot streaming with detached setups in three-machine flow shops. European Journal of Operational Research, 96, 591-611.
    • (1996) European Journal of Operational Research , vol.96 , pp. 591-611
    • Chen, J.1    Steiner, G.2
  • 10
    • 2642565955 scopus 로고    scopus 로고
    • Lot streaming models with a limited number of capacitated transporters in multistage batch production systems
    • Chiu, H. N., Chang, J. H., & Lee, C. H. (2004). Lot streaming models with a limited number of capacitated transporters in multistage batch production systems. Computers & Operations Research, 31, 2003-2020.
    • (2004) Computers & Operations Research , vol.31 , pp. 2003-2020
    • Chiu, H.N.1    Chang, J.H.2    Lee, C.H.3
  • 11
    • 36249032554 scopus 로고    scopus 로고
    • Lot streaming in a multiple product permutation flow shop with intermingling
    • Feldmann, M. & Biskup, D. (2008). Lot streaming in a multiple product permutation flow shop with intermingling. International Journal of Production Research, 46, 197-216.
    • (2008) International Journal of Production Research , vol.46 , pp. 197-216
    • Feldmann, M.1    Biskup, D.2
  • 14
    • 37849189535 scopus 로고    scopus 로고
    • Metaheuristic approaches to the hybrid flow shop scheduling problem with a cost-related criterion
    • Janiak, A., Kozan, E., Lichtenstein, M., & Oǧuzc, C. (2007). Metaheuristic approaches to the hybrid flow shop scheduling problem with a cost-related criterion. International Journal of Production Economics, 105, 407-424.
    • (2007) International Journal of Production Economics , vol.105 , pp. 407-424
    • Janiak, A.1    Kozan, E.2    Lichtenstein, M.3    Oǧuzc, C.4
  • 17
    • 0346243617 scopus 로고    scopus 로고
    • A heuristic method for discrete lot streaming with variable sublots in a flow shop
    • Liu, S. C. (2003). A heuristic method for discrete lot streaming with variable sublots in a flow shop. International Journal of Advanced Manufacturing Technology, 22, 662-668.
    • (2003) International Journal of Advanced Manufacturing Technology , vol.22 , pp. 662-668
    • Liu, S.C.1
  • 19
    • 44849088760 scopus 로고    scopus 로고
    • A hybrid genetic algorithm/mathematical programming approach to the multifamily flowshop scheduling problem with lot streaming
    • Martin, C. H., (2009). A hybrid genetic algorithm/mathematical programming approach to the multifamily flowshop scheduling problem with lot streaming. OMEGA International Journal of Management Sciences, 37, 126-137.
    • (2009) OMEGA. International Journal of Management Sciences , vol.37 , pp. 126-137
    • Martin, C.H.1
  • 21
    • 21144440772 scopus 로고    scopus 로고
    • A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks
    • Oǧuzc, C. & Frinket, M. E. (2005). A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks. Journal of Scheduling, 8, 323-351.
    • (2005) Journal of Scheduling , vol.8 , pp. 323-351
    • Oǧuzc, C.1    Frinket, M.E.2
  • 22
    • 0024925432 scopus 로고
    • Flow shop scheduling with lot streaming. Operations Research Letter, 8, 297-303. Reiter, S. (1966). A system for managing job shop production
    • Potts, C. & Baker, K. (1989). Flow shop scheduling with lot streaming. Operations Research Letter, 8, 297-303. Reiter, S. (1966). A system for managing job shop production. Journal of Business, 34, 371-393.
    • (1989) Journal of Business , vol.34 , pp. 371-393
    • Potts, C.1    Baker, K.2
  • 23
    • 34548625026 scopus 로고    scopus 로고
    • Modeling realistic hybrid flexible flowshop scheduling problems
    • Ruiz, R., Şerifoǧlub, F. S., & Urlings, T., (2008). Modeling realistic hybrid flexible flowshop scheduling problems. Computers & Operations Research, 35, 1151-1175.
    • (2008) Computers & Operations Research , vol.35 , pp. 1151-1175
    • Ruiz, R.1    Şerifoǧlub, F.S.2    Urlings, T.3
  • 24
    • 27144540137 scopus 로고    scopus 로고
    • A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
    • Ruiz, R. & Maroto, C. (2006). A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility. European Journal of Operational Research, 169, 781-800.
    • (2006) European Journal of Operational Research , vol.169 , pp. 781-800
    • Ruiz, R.1    Maroto, C.2
  • 26
    • 0033363409 scopus 로고    scopus 로고
    • Lot streaming and scheduling multiple products in twomachine no-wait flow shop
    • Sriskandarajah, C. & Wagneur, E. (1999). Lot streaming and scheduling multiple products in twomachine no-wait flow shop. IIE Transactions, 31, 695-707.
    • (1999) IIE Transactions , vol.31 , pp. 695-707
    • Sriskandarajah, C.1    Wagneur, E.2
  • 27
    • 21144442004 scopus 로고    scopus 로고
    • A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment
    • Tang, L., Liu, W., & Liu, J., (2005). A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment. Journal of Intelligent Manufacturing, 16, 361-370.
    • (2005) Journal of Intelligent Manufacturing , vol.16 , pp. 361-370
    • Tang, L.1    Liu, W.2    Liu, J.3
  • 28
    • 33644684986 scopus 로고    scopus 로고
    • A new lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion time
    • Tang, L., Xuan, H., & Liu, J. (2006). A new lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion time. Computers & Operations Research, 33, 3344-3359.
    • (2006) Computers & Operations Research , vol.33 , pp. 3344-3359
    • Tang, L.1    Xuan, H.2    Liu, J.3
  • 29
    • 0000611941 scopus 로고
    • Basic techniques for lot streaming
    • Trietsch, D. & Baker, K., (1993). Basic techniques for lot streaming. Operations Research, 41, 1065-1076.
    • (1993) Operations Research , vol.41 , pp. 1065-1076
    • Trietsch, D.1    Baker, K.2
  • 30
    • 43849110246 scopus 로고    scopus 로고
    • A discrete particle swarm optimization for lot-streaming flowshop scheduling problem
    • Tseng, C. T. & Liao, C. J. (2008). A discrete particle swarm optimization for lot-streaming flowshop scheduling problem. European Journal of Operational Research, 191, 360-373.
    • (2008) European Journal of Operational Research , vol.191 , pp. 360-373
    • Tseng, C.T.1    Liao, C.J.2
  • 31
    • 0026896286 scopus 로고
    • Two and three machines flow shop scheduling problems with equal sized transfer batches
    • Vickson, R. G. & Alfredsson, B. E. (1992). Two and three machines flow shop scheduling problems with equal sized transfer batches. International Journal of Production Research, 30, 1551-1574.
    • (1992) International Journal of Production Research , vol.30 , pp. 1551-1574
    • Vickson, R.G.1    Alfredsson, B.E.2
  • 33
    • 33745125063 scopus 로고    scopus 로고
    • Multiprocessor task scheduling in multistage hybrid flow-shops: An ant colony system approach
    • Ying, K.-C. & Lin, S.-W. (2006). Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach. International Journal of Production Research, 44, 3161-3177.
    • (2006) International Journal of Production Research , vol.44 , pp. 3161-3177
    • Ying, K.-C.1    Lin, S.-W.2
  • 34
    • 33748321077 scopus 로고    scopus 로고
    • An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
    • Zandieh, M., Fatemi Ghomi, S. M. T., & Moattar Husseini, S. M. (2006). An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Applied Mathematics and Computation, 180, 111-127.
    • (2006) Applied Mathematics and Computation , vol.180 , pp. 111-127
    • Zandieh, M.1    Fatemi Ghomi, S.M.T.2    Moattar Husseini, S.M.3
  • 35
    • 13444302670 scopus 로고    scopus 로고
    • Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops
    • Zhang, W., Yin, C., Liu, J., & Linn, R. J. (2005). Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops. International Journal of Production Economics, 96, 189-200.
    • (2005) International Journal of Production Economics , vol.96 , pp. 189-200
    • Zhang, W.1    Yin, C.2    Liu, J.3    Linn, R.J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.