3
-
-
0027634134
-
BPSS: a scheduling support system for the package industry
-
Adler L.B., et al. BPSS: a scheduling support system for the package industry. Journal of Operations Research 4 1 (1993) 641-648
-
(1993)
Journal of Operations Research
, vol.4
, Issue.1
, pp. 641-648
-
-
Adler, L.B.1
-
4
-
-
0006859287
-
An extension of two machine sequencing problems
-
Arthanary T.S., and Ramaswamy K.G. An extension of two machine sequencing problems. Operations Research 8 (1971) 10-22
-
(1971)
Operations Research
, vol.8
, pp. 10-22
-
-
Arthanary, T.S.1
Ramaswamy, K.G.2
-
5
-
-
0026417688
-
Branch and bound algorithm for the flow shop with multiple processors
-
Brah S.A., and Hunsucker J.L. Branch and bound algorithm for the flow shop with multiple processors. European Journal of Operational Research 51 (1991) 88-99
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 88-99
-
-
Brah, S.A.1
Hunsucker, J.L.2
-
6
-
-
0033078202
-
Heuristics for scheduling in a flow shop with multiple processors
-
Brah S.A., and Loo L.L. Heuristics for scheduling in a flow shop with multiple processors. European Journal of Operational Research 113 (1999) 113-122
-
(1999)
European Journal of Operational Research
, vol.113
, pp. 113-122
-
-
Brah, S.A.1
Loo, L.L.2
-
7
-
-
84901433127
-
-
L.N. de Castro, J. Timmis, An artificial immune network for multimodal function optimization, Evolutionary Computation, CEC'02, in: Proceedings of the 2002 Congress, 2002, pp. 699-704.
-
-
-
-
8
-
-
0031102724
-
Shape optimization of electromagnetic devices using immune algorithm
-
Chen J.S., Kim M.K., and Jong H.K. Shape optimization of electromagnetic devices using immune algorithm. IEEE Transactions on Magnetics 33 (1997) 1876-1879
-
(1997)
IEEE Transactions on Magnetics
, vol.33
, pp. 1876-1879
-
-
Chen, J.S.1
Kim, M.K.2
Jong, H.K.3
-
9
-
-
0029254603
-
Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines at one stage
-
Chen B. Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines at one stage. Journal of the Operational Research Society 46 (1995) 234-244
-
(1995)
Journal of the Operational Research Society
, vol.46
, pp. 234-244
-
-
Chen, B.1
-
13
-
-
33748290689
-
-
S.E. Elmaghraby, R.E. Karnoub, Production control in flexible flowshops: an example from textile manufacturing, OR Report No. 305 OR and IE Department, North Carolina State University, USA, 1995.
-
-
-
-
16
-
-
0030149222
-
A computational study of heuristics for two-stage flexible flowshops
-
Guinet A., et al. A computational study of heuristics for two-stage flexible flowshops. Journal of Operations Research 34 (1996) 1399-1415
-
(1996)
Journal of Operations Research
, vol.34
, pp. 1399-1415
-
-
Guinet, A.1
-
18
-
-
0026190509
-
Schedules for a two stage hybrid flowshop with parallel machines at the second stage
-
Gupta J.N.D., and Tunc E.A. Schedules for a two stage hybrid flowshop with parallel machines at the second stage. International Journal of Production Research 29 (1991) 1489-1502
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1489-1502
-
-
Gupta, J.N.D.1
Tunc, E.A.2
-
19
-
-
0001326653
-
Scheduling a two-stage hybrid flowshop with separable setup and removal times
-
Gupta J.N.D., and Tunc E.A. Scheduling a two-stage hybrid flowshop with separable setup and removal times. European Journal of Operational Research 77 (1994) 415-428
-
(1994)
European Journal of Operational Research
, vol.77
, pp. 415-428
-
-
Gupta, J.N.D.1
Tunc, E.A.2
-
20
-
-
0031543097
-
Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
-
Gupta J.N.D., Hadri A.M.A., and Potts C.N. Scheduling a two-stage hybrid flow shop with parallel machines at the first stage. Journal of Operations Research 69 (1997) 171-191
-
(1997)
Journal of Operations Research
, vol.69
, pp. 171-191
-
-
Gupta, J.N.D.1
Hadri, A.M.A.2
Potts, C.N.3
-
21
-
-
0031198422
-
A flowshop scheduling problem with two operations per job
-
Gupta J.N.D. A flowshop scheduling problem with two operations per job. International Journal of Production Research 35 8 (1997) 2309-2325
-
(1997)
International Journal of Production Research
, vol.35
, Issue.8
, pp. 2309-2325
-
-
Gupta, J.N.D.1
-
22
-
-
0037332826
-
A simple non-linear model of immune response
-
Gutnikov S., and Melnikov Y. A simple non-linear model of immune response. Chaos, Solitons & Fractals 16 (2003) 125-132
-
(2003)
Chaos, Solitons & Fractals
, vol.16
, pp. 125-132
-
-
Gutnikov, S.1
Melnikov, Y.2
-
24
-
-
0034171868
-
An immune-based optimization method to capacitor placement in a radial distribution system
-
Huang S.T. An immune-based optimization method to capacitor placement in a radial distribution system. IEEE Transactions on Power Delivery 15 (2000) 744-749
-
(2000)
IEEE Transactions on Power Delivery
, vol.15
, pp. 744-749
-
-
Huang, S.T.1
-
25
-
-
0036650445
-
Application of immune based optimization method for fault-section estimation in a distribution system
-
Huang S.T. Application of immune based optimization method for fault-section estimation in a distribution system. IEEE Transactions on Power Delivery 17 (2002) 779-784
-
(2002)
IEEE Transactions on Power Delivery
, vol.17
, pp. 779-784
-
-
Huang, S.T.1
-
26
-
-
0141509086
-
A case study in a two-stage hybrid flow shop with setup time and dedicated machines
-
Hung T.S.L., and Ching J.L. A case study in a two-stage hybrid flow shop with setup time and dedicated machines. International Journal of Production Economics 86 (2003) 133-143
-
(2003)
International Journal of Production Economics
, vol.86
, pp. 133-143
-
-
Hung, T.S.L.1
Ching, J.L.2
-
28
-
-
0003075019
-
Optimal two and three-stage production schedules with setup times included
-
Johnson S.M. Optimal two and three-stage production schedules with setup times included. Naval Research Logistics Quarterly 1 (1954) 61-67
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-67
-
-
Johnson, S.M.1
-
30
-
-
0023562034
-
Heuristic methods for flexible flow line scheduling
-
Kochhar S., and Morris R.J.T. Heuristic methods for flexible flow line scheduling. Journal of Manufacturing Systems 6 4 (1987) 299-314
-
(1987)
Journal of Manufacturing Systems
, vol.6
, Issue.4
, pp. 299-314
-
-
Kochhar, S.1
Morris, R.J.T.2
-
31
-
-
0035841877
-
Heuristic scheduling of parallel machines with sequence-dependent set-up times
-
Kurz M.E., and Askin R.G. Heuristic scheduling of parallel machines with sequence-dependent set-up times. International Journal of Production Research 39 16 (2001) 3747-3769
-
(2001)
International Journal of Production Research
, vol.39
, Issue.16
, pp. 3747-3769
-
-
Kurz, M.E.1
Askin, R.G.2
-
32
-
-
0035427202
-
Note on "an adaptable problem-space-based search method for flexible flow line scheduling"
-
Kurz M.E., and Askin R.G. Note on "an adaptable problem-space-based search method for flexible flow line scheduling". IIE Transactions 33 8 (2001) 691-693
-
(2001)
IIE Transactions
, vol.33
, Issue.8
, pp. 691-693
-
-
Kurz, M.E.1
Askin, R.G.2
-
34
-
-
2942674864
-
Scheduling flexible flow lines with sequence-dependent setup times
-
Kurz M.E., and Askin R.G. Scheduling flexible flow lines with sequence-dependent setup times. European Journal of Operational Research 159 1 (2004) 66-82
-
(2004)
European Journal of Operational Research
, vol.159
, Issue.1
, pp. 66-82
-
-
Kurz, M.E.1
Askin, R.G.2
-
36
-
-
0031076889
-
A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes
-
Lee I., Sikora R., and Shaw M.J. A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes. IEEE Transactions on Systems, Manufacturing, and Cybernetics, Part B 27 1 (1997) 36-54
-
(1997)
IEEE Transactions on Systems, Manufacturing, and Cybernetics, Part B
, vol.27
, Issue.1
, pp. 36-54
-
-
Lee, I.1
Sikora, R.2
Shaw, M.J.3
-
37
-
-
0031073792
-
An adaptable problem-space-based search method for flexible flow line scheduling
-
Leon V.J., and Ramamoorthy B. An adaptable problem-space-based search method for flexible flow line scheduling. IIE Transactions 29 (1997) 115-125
-
(1997)
IIE Transactions
, vol.29
, pp. 115-125
-
-
Leon, V.J.1
Ramamoorthy, B.2
-
38
-
-
0041375052
-
Job shop scheduling with group-dependent setups, finite buffers, and long time horizon
-
Luh P.B., Gou L., Zhang Y., Nagahora T., Tsuji M., Yoneda K., Hasegawa T., Kyoya Y., and Kano T. Job shop scheduling with group-dependent setups, finite buffers, and long time horizon. Annual of Operation Research 76 (1998) 233-259
-
(1998)
Annual of Operation Research
, vol.76
, pp. 233-259
-
-
Luh, P.B.1
Gou, L.2
Zhang, Y.3
Nagahora, T.4
Tsuji, M.5
Yoneda, K.6
Hasegawa, T.7
Kyoya, Y.8
Kano, T.9
-
40
-
-
0344353377
-
Two machine sequencing problem with parallel machines
-
MittaI B.S., and Nagga P.C. Two machine sequencing problem with parallel machines. Operations Research 10 (1973) 50-61
-
(1973)
Operations Research
, vol.10
, pp. 50-61
-
-
MittaI, B.S.1
Nagga, P.C.2
-
41
-
-
0000927441
-
Immune algorithm with searching diversity and its application to resource allocation problem
-
Mori K., Tsukiyama M., and Fukuda T. Immune algorithm with searching diversity and its application to resource allocation problem. Transactions of IEE Japan 113C (1993) 872-878
-
(1993)
Transactions of IEE Japan
, vol.113 C
, pp. 872-878
-
-
Mori, K.1
Tsukiyama, M.2
Fukuda, T.3
-
43
-
-
84985846638
-
A comparison of sequencing rules for a two-stage hybrid flow shop
-
Narasimhan S., and Mangiameli P. A comparison of sequencing rules for a two-stage hybrid flow shop. Decision Science 18 (1987) 250-265
-
(1987)
Decision Science
, vol.18
, pp. 250-265
-
-
Narasimhan, S.1
Mangiameli, P.2
-
44
-
-
0033101911
-
A genetic algorithm methodology for complex scheduling problems
-
Norman B.A., and Bean J.C. A genetic algorithm methodology for complex scheduling problems. Naval Research Logistics 46 (1999) 199-211
-
(1999)
Naval Research Logistics
, vol.46
, pp. 199-211
-
-
Norman, B.A.1
Bean, J.C.2
-
45
-
-
0001204823
-
A fast tabu search algorithm for the permutation flow-shop problem
-
Nowicki E., and Smutnicki C. A fast tabu search algorithm for the permutation flow-shop problem. European Journal of Operational Research 91 (1996) 160-175
-
(1996)
European Journal of Operational Research
, vol.91
, pp. 160-175
-
-
Nowicki, E.1
Smutnicki, C.2
-
46
-
-
38149145983
-
An approximation algorithm for a single-machine scheduling problem with release times and delivery times
-
Nowicki E., and Smutnicki C. An approximation algorithm for a single-machine scheduling problem with release times and delivery times. Discrete Applied Mathematics 48 (1994) 69-79
-
(1994)
Discrete Applied Mathematics
, vol.48
, pp. 69-79
-
-
Nowicki, E.1
Smutnicki, C.2
-
48
-
-
0031363501
-
Two-stage flowshop scheduling with a common second-stage machine
-
Oguz C., Lin B.M.T., and Cheng T.C.E. Two-stage flowshop scheduling with a common second-stage machine. Computers and Operations Research 24 12 (1997) 1169-1174
-
(1997)
Computers and Operations Research
, vol.24
, Issue.12
, pp. 1169-1174
-
-
Oguz, C.1
Lin, B.M.T.2
Cheng, T.C.E.3
-
49
-
-
0003438602
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Pinedo M. Scheduling Theory, Algorithms, and Systems (1995), Prentice-Hall, Englewood Cliffs, NJ
-
(1995)
Scheduling Theory, Algorithms, and Systems
-
-
Pinedo, M.1
-
50
-
-
0026868840
-
Scheduling in n-job, m-stage flowshop with parallel processors to minimize makespan
-
Rajendran C., and Chaudhuri D. Scheduling in n-job, m-stage flowshop with parallel processors to minimize makespan. International Journal of Production Economics 27 (1992) 137-143
-
(1992)
International Journal of Production Economics
, vol.27
, pp. 137-143
-
-
Rajendran, C.1
Chaudhuri, D.2
-
52
-
-
0032068389
-
Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups
-
Rios-Mercado R.Z., and Bard J.F. Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups. Computers and Operations Research 25 5 (1998) 351-366
-
(1998)
Computers and Operations Research
, vol.25
, Issue.5
, pp. 351-366
-
-
Rios-Mercado, R.Z.1
Bard, J.F.2
-
53
-
-
0002434711
-
A solution to a special case of flow shop scheduling problems
-
Elmaghraby S.E. (Ed), Springer, Berlin
-
Salvador M.S. A solution to a special case of flow shop scheduling problems. In: Elmaghraby S.E. (Ed). Symposium on the Theory of Scheduling and its Applications (1973), Springer, Berlin 83-91
-
(1973)
Symposium on the Theory of Scheduling and its Applications
, pp. 83-91
-
-
Salvador, M.S.1
-
55
-
-
0030243899
-
An evaluation of sequencing heuristics in flow shops with multiple processors
-
Santos D.L., Hunsucker J.L., and Deal D.E. An evaluation of sequencing heuristics in flow shops with multiple processors. Computers and Industrial Engineering 30 4 (1996) 681-692
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.4
, pp. 681-692
-
-
Santos, D.L.1
Hunsucker, J.L.2
Deal, D.E.3
-
56
-
-
33748318484
-
-
T.J. Sawik, A scheduling algorithm for flexible flow lines with limited intermediate buffers, in: Proceedings of the Eighth International Conference on CAD/CAM, Robotics and Factories of the Future, Metz, France, vol. 2, 1992, pp. 1711-1722.
-
-
-
-
57
-
-
33748332103
-
-
T.J. Sawik, New algorithms for scheduling flexible flow lines, in: Proceedings of the 1994 Japan-USA Symposium on Flexible Automation, Kobe, Japan, vol. 3, 1994, pp. 1091-1094.
-
-
-
-
58
-
-
84877027692
-
Scheduling flexible flow lines with no in-process buffers
-
Sawik T.J. Scheduling flexible flow lines with no in-process buffers. International Journal of Production Research 33 5 (1995) 1357-1367
-
(1995)
International Journal of Production Research
, vol.33
, Issue.5
, pp. 1357-1367
-
-
Sawik, T.J.1
-
59
-
-
0033966531
-
Resolution of multicomponent overlapping chromatogram using an immune algorithm and genetic algorithm
-
Shao X.G., Chen Z.H., and Lin X.Q. Resolution of multicomponent overlapping chromatogram using an immune algorithm and genetic algorithm. Chemometrics and Intelligent Laboratory System 50 (2000) 91-99
-
(2000)
Chemometrics and Intelligent Laboratory System
, vol.50
, pp. 91-99
-
-
Shao, X.G.1
Chen, Z.H.2
Lin, X.Q.3
-
60
-
-
0022806444
-
A MILP model for the N-job, M-stage flowshop with sequence dependent set-up times
-
Srikar B.N., and Ghosh S. A MILP model for the N-job, M-stage flowshop with sequence dependent set-up times. International Journal of Production Research 24 6 (1986) 1459-1474
-
(1986)
International Journal of Production Research
, vol.24
, Issue.6
, pp. 1459-1474
-
-
Srikar, B.N.1
Ghosh, S.2
-
61
-
-
0024769054
-
Scheduling algorithms for flexible flowshops: worst and average case performance
-
Sriskandarajah C., and Sethi S.P. Scheduling algorithms for flexible flowshops: worst and average case performance. European Journal of Operational Research 43 (1989) 143-160
-
(1989)
European Journal of Operational Research
, vol.43
, pp. 143-160
-
-
Sriskandarajah, C.1
Sethi, S.P.2
-
62
-
-
84974856861
-
On the development of a mixed-integer linear programming model for the flowshop sequencing problem
-
Stafford E.F. On the development of a mixed-integer linear programming model for the flowshop sequencing problem. Journal of the Operational Research Society 39 12 (1988) 1163-1174
-
(1988)
Journal of the Operational Research Society
, vol.39
, Issue.12
, pp. 1163-1174
-
-
Stafford, E.F.1
-
63
-
-
27844432869
-
On the Srikar-Ghosh MILP model for the N * M SDST flowshop problem
-
Stafford E.F., and Tseng F.T. On the Srikar-Ghosh MILP model for the N * M SDST flowshop problem. International Journal of Production Research 28 10 (1990) 1817-1830
-
(1990)
International Journal of Production Research
, vol.28
, Issue.10
, pp. 1817-1830
-
-
Stafford, E.F.1
Tseng, F.T.2
-
64
-
-
0026930899
-
New search spaces for sequencing problems with application to job shop scheduling
-
Storer R.H., Wu S.D., and Vaccari R. New search spaces for sequencing problems with application to job shop scheduling. Management Science 38 10 (1992) 1495-1509
-
(1992)
Management Science
, vol.38
, Issue.10
, pp. 1495-1509
-
-
Storer, R.H.1
Wu, S.D.2
Vaccari, R.3
-
65
-
-
0020177876
-
Sequencing n jobs on two machines with setup, processing and removal times separated
-
Sule D.R. Sequencing n jobs on two machines with setup, processing and removal times separated. Naval Research Logistics Quarterly 29 (1982) 517-519
-
(1982)
Naval Research Logistics Quarterly
, vol.29
, pp. 517-519
-
-
Sule, D.R.1
-
66
-
-
0023440155
-
A flow-shop with sequence dependent additive setup times
-
Szwarc W., and Gupta J.N.D. A flow-shop with sequence dependent additive setup times. Naval Research Logistics 34 (1987) 619-627
-
(1987)
Naval Research Logistics
, vol.34
, pp. 619-627
-
-
Szwarc, W.1
Gupta, J.N.D.2
-
69
-
-
0022093184
-
Scheduling algorithms for flexible flow lines
-
Wittrock R. Scheduling algorithms for flexible flow lines. IBM Journal of Research and Development 29 24 (1985) 401-412
-
(1985)
IBM Journal of Research and Development
, vol.29
, Issue.24
, pp. 401-412
-
-
Wittrock, R.1
-
70
-
-
0024016313
-
An adaptable scheduling algorithm for flexible flow lines
-
Wittrock R. An adaptable scheduling algorithm for flexible flow lines. Operations Research 36 3 (1988) 445-453
-
(1988)
Operations Research
, vol.36
, Issue.3
, pp. 445-453
-
-
Wittrock, R.1
-
72
-
-
33748290688
-
-
J.R. Zhou, D. Huang, W.S. Jiang, Optimization production scheduling of multi-stage interrelated discrete system via synthetic knowledge, in: Proceedings of the American Control Conference, 1996, pp. 724-728.
-
-
-
|