1
-
-
0003075019
-
Optimal two- and three-stage production schedules with setup times included
-
Johnson S.M. Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly 1 1 (1954) 61-68
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, Issue.1
, pp. 61-68
-
-
Johnson, S.M.1
-
2
-
-
0019585243
-
A review of production scheduling
-
Graves S.C. A review of production scheduling. Operations Research 29 4 (1981) 646-675
-
(1981)
Operations Research
, vol.29
, Issue.4
, pp. 646-675
-
-
Graves, S.C.1
-
3
-
-
0017766228
-
Operations research in production management: an investigation of past and present utilization
-
Ledbetter W.N., and Cox J.F. Operations research in production management: an investigation of past and present utilization. Production and Inventory Management 18 3 (1977) 84-91
-
(1977)
Production and Inventory Management
, vol.18
, Issue.3
, pp. 84-91
-
-
Ledbetter, W.N.1
Cox, J.F.2
-
4
-
-
0023643533
-
Use of operations research in production management
-
Ford F.N., Bradbard D.A., Ledbetter W.N., and Cox J.F. Use of operations research in production management. Production and Inventory Management 28 3 (1987) 59-62
-
(1987)
Production and Inventory Management
, vol.28
, Issue.3
, pp. 59-62
-
-
Ford, F.N.1
Bradbard, D.A.2
Ledbetter, W.N.3
Cox, J.F.4
-
5
-
-
0002748923
-
Job-shop scheduling theory: what is relevant?
-
McKay K.N., Safayeni F.R., and Buzacott J.A. Job-shop scheduling theory: what is relevant?. Interfaces 4 18 (1988) 84-90
-
(1988)
Interfaces
, vol.4
, Issue.18
, pp. 84-90
-
-
McKay, K.N.1
Safayeni, F.R.2
Buzacott, J.A.3
-
6
-
-
0011717155
-
Operations research techniques in manufacturing planning and control systems
-
Olhager J., and Rapp B. Operations research techniques in manufacturing planning and control systems. International Transactions in Operational Research 2 1 (1995) 29-43
-
(1995)
International Transactions in Operational Research
, vol.2
, Issue.1
, pp. 29-43
-
-
Olhager, J.1
Rapp, B.2
-
8
-
-
0027146758
-
Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling
-
MacCarthy B.L., and Liu J. Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling. International Journal of Production Research 31 1 (1993) 59-79
-
(1993)
International Journal of Production Research
, vol.31
, Issue.1
, pp. 59-79
-
-
MacCarthy, B.L.1
Liu, J.2
-
10
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
Allahverdi A., Gupta J.N.D., and Aldowaisan T. A review of scheduling research involving setup considerations. OMEGA, The International Journal of Management Science 27 2 (1999) 219-239
-
(1999)
OMEGA, The International Journal of Management Science
, vol.27
, Issue.2
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
12
-
-
0033284730
-
Les problèmes d'ordonnancement de type flow-shop hybride: État de l'art
-
(in French)
-
Vignier A., Billaut J.C., and Proust C. Les problèmes d'ordonnancement de type flow-shop hybride: État de l'art. RAIRO Recherche opérationnelle 33 2 (1999) 117-183 (in French)
-
(1999)
RAIRO Recherche opérationnelle
, vol.33
, Issue.2
, pp. 117-183
-
-
Vignier, A.1
Billaut, J.C.2
Proust, C.3
-
13
-
-
0031212608
-
Flowshop scheduling/sequencing research: a statistical review of the literature, 1952-1994
-
Reisman A., Kumar A., and Motwani J. Flowshop scheduling/sequencing research: a statistical review of the literature, 1952-1994. IEEE Transactions on Engineering Management 44 3 (1997) 316-329
-
(1997)
IEEE Transactions on Engineering Management
, vol.44
, Issue.3
, pp. 316-329
-
-
Reisman, A.1
Kumar, A.2
Motwani, J.3
-
14
-
-
13844311429
-
Evolutionary computing in manufacturing industry: an overview of recent applications
-
Oduguwa V., Tiwari A., and Roy R. Evolutionary computing in manufacturing industry: an overview of recent applications. Applied Soft Computing 5 3 (2005) 281-299
-
(2005)
Applied Soft Computing
, vol.5
, Issue.3
, pp. 281-299
-
-
Oduguwa, V.1
Tiwari, A.2
Roy, R.3
-
15
-
-
0031145735
-
An experimental evaluation of heuristics for scheduling in a real-life flowshop with sequence-dependent setup times of jobs
-
Parthasarathy S., and Rajendran C. An experimental evaluation of heuristics for scheduling in a real-life flowshop with sequence-dependent setup times of jobs. International Journal of Production Economics 49 3 (1997) 255-263
-
(1997)
International Journal of Production Economics
, vol.49
, Issue.3
, pp. 255-263
-
-
Parthasarathy, S.1
Rajendran, C.2
-
16
-
-
1642352034
-
A case study on the multistage IC final testing scheduling problem with reentry
-
Pearn W.L., Chung S.H., Chen A.Y., and Yang M.H. A case study on the multistage IC final testing scheduling problem with reentry. International Journal of Production Economics 88 3 (2004) 257-267
-
(2004)
International Journal of Production Economics
, vol.88
, Issue.3
, pp. 257-267
-
-
Pearn, W.L.1
Chung, S.H.2
Chen, A.Y.3
Yang, M.H.4
-
17
-
-
3342903540
-
A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation
-
Bertel S., and Billaut J.C. A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation. European Journal of Operational Research 159 3 (2004) 651-662
-
(2004)
European Journal of Operational Research
, vol.159
, Issue.3
, pp. 651-662
-
-
Bertel, S.1
Billaut, J.C.2
-
18
-
-
7444269591
-
Hybrid evolutionary algorithm-based real-world flexible job shop scheduling problem: application service provider approach
-
Tanev I.T., Uozumi T., and Morotome Y. Hybrid evolutionary algorithm-based real-world flexible job shop scheduling problem: application service provider approach. Applied Soft Computing 5 1 (2004) 87-100
-
(2004)
Applied Soft Computing
, vol.5
, Issue.1
, pp. 87-100
-
-
Tanev, I.T.1
Uozumi, T.2
Morotome, Y.3
-
19
-
-
13544254269
-
Group technology in a hybrid flowshop environment: a case study
-
Andrés C., Albarracín J.M., Tormo G., Vicens E., and García-Sabater J.P. Group technology in a hybrid flowshop environment: a case study. European Journal of Operational Research 167 1 (2005) 272-281
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.1
, pp. 272-281
-
-
Andrés, C.1
Albarracín, J.M.2
Tormo, G.3
Vicens, E.4
García-Sabater, J.P.5
-
22
-
-
0033906893
-
Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
-
Botta-Genoulaz V. Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness. International Journal of Production Economics 64 1-3 (2000) 101-111
-
(2000)
International Journal of Production Economics
, vol.64
, Issue.1-3
, pp. 101-111
-
-
Botta-Genoulaz, V.1
-
24
-
-
2942674864
-
Scheduling flexible flow lines with sequence-dependent setup times
-
Kurz M.E., and Askin R.G. Scheduling flexible flow lines with sequence-dependent setup times. European Journal of Operational Research 159 1 (2004) 66-82
-
(2004)
European Journal of Operational Research
, vol.159
, Issue.1
, pp. 66-82
-
-
Kurz, M.E.1
Askin, R.G.2
-
25
-
-
27344438602
-
Permutation flowshop scheduling problems with maximal and minimal time lags
-
Fondrevelle J., Oulamara A., and Portmann M.-C. Permutation flowshop scheduling problems with maximal and minimal time lags. Computers & Operations Research 33 6 (2006) 1540-1556
-
(2006)
Computers & Operations Research
, vol.33
, Issue.6
, pp. 1540-1556
-
-
Fondrevelle, J.1
Oulamara, A.2
Portmann, M.-C.3
-
26
-
-
27144540137
-
A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
-
Ruiz R., and Maroto C. A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility. European Journal of Operational Research 169 3 (2006) 781-800
-
(2006)
European Journal of Operational Research
, vol.169
, Issue.3
, pp. 781-800
-
-
Ruiz, R.1
Maroto, C.2
-
27
-
-
27144441901
-
Metaheuristics for the deterministic hybrid flow shop problem
-
Glasgow, FUCAM, INRIA
-
Gourgand M., Grangeon N., and Norre S. Metaheuristics for the deterministic hybrid flow shop problem. Proceedings of the international conference on industrial engineering and production management, IEPM'99. Glasgow, FUCAM, INRIA (1999) 136-145
-
(1999)
Proceedings of the international conference on industrial engineering and production management, IEPM'99
, pp. 136-145
-
-
Gourgand, M.1
Grangeon, N.2
Norre, S.3
-
32
-
-
0026417688
-
Branch and bound algorithm for the flow shop with multiple processors
-
Brah S.A., and Hunsucker J.L. Branch and bound algorithm for the flow shop with multiple processors. European Journal of Operational Research 51 1 (1991) 88-99
-
(1991)
European Journal of Operational Research
, vol.51
, Issue.1
, pp. 88-99
-
-
Brah, S.A.1
Hunsucker, J.L.2
-
33
-
-
0026819776
-
A multi-stage parallel-processor flowshop problem with minimum flowtime
-
Rajendran C., and Chaudhuri D. A multi-stage parallel-processor flowshop problem with minimum flowtime. European Journal of Operational Research 57 1 (1992) 111-122
-
(1992)
European Journal of Operational Research
, vol.57
, Issue.1
, pp. 111-122
-
-
Rajendran, C.1
Chaudhuri, D.2
-
35
-
-
0034209871
-
Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
-
Sawik T. Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers. Mathematical and Computer Modelling 31 13 (2000) 39-52
-
(2000)
Mathematical and Computer Modelling
, vol.31
, Issue.13
, pp. 39-52
-
-
Sawik, T.1
-
36
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
-
Nawaz M., Enscore Jr. E.E., and Ham I. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. OMEGA, The International Journal of Management Science 11 1 (1983) 91-95
-
(1983)
OMEGA, The International Journal of Management Science
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore Jr., E.E.2
Ham, I.3
-
38
-
-
12344285964
-
Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics
-
Ruiz R., Maroto C., and Alcaraz J. Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics. European Journal of Operational Research 165 1 (2005) 34-54
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.1
, pp. 34-54
-
-
Ruiz, R.1
Maroto, C.2
Alcaraz, J.3
-
40
-
-
0000661829
-
An exploratory technique for investigating large quantities of categorical data
-
Kass G.V. An exploratory technique for investigating large quantities of categorical data. Applied Statistics 29 2 (1980) 119-127
-
(1980)
Applied Statistics
, vol.29
, Issue.2
, pp. 119-127
-
-
Kass, G.V.1
-
41
-
-
0002235173
-
A method of choosing multiway partitions for classification and decision trees
-
Biggs D., De Ville B., and Suen E. A method of choosing multiway partitions for classification and decision trees. Journal of Applied Statistics 18 1 (1991) 49-62
-
(1991)
Journal of Applied Statistics
, vol.18
, Issue.1
, pp. 49-62
-
-
Biggs, D.1
De Ville, B.2
Suen, E.3
-
42
-
-
0000596361
-
Note on the sampling error of the difference between correlated proportions or percentages
-
McNemar Q. Note on the sampling error of the difference between correlated proportions or percentages. Psychometrika 12 (1947) 153-157
-
(1947)
Psychometrika
, vol.12
, pp. 153-157
-
-
McNemar, Q.1
|