메뉴 건너뛰기




Volumn 23, Issue 5, 2012, Pages 2047-2056

The heuristic preemptive dispatching method of material transportation system in 300mm semiconductor fabrication

Author keywords

300mm; AMHS; OHT; Preemptive; Semiconductor manufacturing

Indexed keywords

300MM; AMHS; OHT; PREEMPTIVE; SEMICONDUCTOR MANUFACTURING;

EID: 84870884956     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-011-0531-7     Document Type: Article
Times cited : (24)

References (21)
  • 2
    • 74849084464 scopus 로고    scopus 로고
    • Constraint satisfaction techniques in planning and scheduling
    • Barták, R., Salido, M. A., & Rossi, F. (2010). Constraint satisfaction techniques in planning and scheduling. Journal of Intelligent Manufacturing, 21(1), 5-15.
    • (2010) Journal of Intelligent Manufacturing , vol.21 , Issue.1 , pp. 5-15
    • Barták, R.1    Salido, M.A.2    Rossi, F.3
  • 3
    • 70349414335 scopus 로고    scopus 로고
    • Improving distribution operations: Implementation of material handling systems
    • Chakravorty, S. S. (2009). Improving distribution operations: Implementation of material handling systems. International Journal of Production Economics, 122(1), 89-106.
    • (2009) International Journal of Production Economics , vol.122 , Issue.1 , pp. 89-106
    • Chakravorty, S.S.1
  • 4
    • 33749665423 scopus 로고    scopus 로고
    • Scheduling and routing of automated guided vehicles: A hybrid approach
    • Corréa, A. I., André, L., & Rousseau, L. M. (2007). Scheduling and routing of automated guided vehicles: A hybrid approach. Computers and Operations Research, 34(6), 1688-1707.
    • (2007) Computers and Operations Research , vol.34 , Issue.6 , pp. 1688-1707
    • Corréa, A.I.1    André, L.2    Rousseau, L.M.3
  • 6
    • 84870940036 scopus 로고    scopus 로고
    • Flexsim
    • Flexsim. (2009). http://www.flexsim.com/.
    • (2009)
  • 8
    • 33746357611 scopus 로고    scopus 로고
    • Optimization of duedate objectives in scheduling semiconductor batch manufacturing
    • Gupta, A. K., & Sivakumar, A. I. (2006). Optimization of duedate objectives in scheduling semiconductor batch manufacturing. International Journal of Machine Tools and Manufacture, 46(12-13), 1671-1679.
    • (2006) International Journal of Machine Tools and Manufacture , vol.46 , Issue.12-13 , pp. 1671-1679
    • Gupta, A.K.1    Sivakumar, A.I.2
  • 9
    • 33947584391 scopus 로고    scopus 로고
    • Two-step simulation method for automatic material handling system of semiconductor fab
    • Kong, S. (2007). Two-step simulation method for automatic material handling system of semiconductor fab. Robotics and Computer-Integrated Manufacturing, 23(4), 409-420.
    • (2007) Robotics and Computer-Integrated Manufacturing , vol.23 , Issue.4 , pp. 409-420
    • Kong, S.1
  • 10
    • 0036351167 scopus 로고    scopus 로고
    • Modeling and performance evaluation of an overhead hoist Transport system in a 300mmfabrication plant
    • Kuo, C. (2002). Modeling and performance evaluation of an overhead hoist Transport system in a 300mmfabrication plant. International Journal of Advanced Manufacturing Technology, 20(2), 153-161.
    • (2002) International Journal of Advanced Manufacturing Technology , vol.20 , Issue.2 , pp. 153-161
    • Kuo, C.1
  • 11
    • 53949094990 scopus 로고    scopus 로고
    • Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system
    • Lee, Y., Jiang, Z., & Liu, H. (2009). Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system. Computers and Operations Research, 36(3), 866-884.
    • (2009) Computers and Operations Research , vol.36 , Issue.3 , pp. 866-884
    • Lee, Y.1    Jiang, Z.2    Liu, H.3
  • 13
    • 33746911598 scopus 로고    scopus 로고
    • Differentiated preemptive dispatching for automatic materials handling services in 300mm semiconductor foundry
    • Liao, D., & Wang, C. (2006). Differentiated preemptive dispatching for automatic materials handling services in 300mm semiconductor foundry. International Journal of Advanced Manufacturing Technology, 29(9-10), 890-896.
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , Issue.9-10 , pp. 890-896
    • Liao, D.1    Wang, C.2
  • 15
    • 0042386738 scopus 로고    scopus 로고
    • Simulation analysis of the connecting transport AMHS in a wafer fab
    • Lin, J., Wang, F., & Wu, C. (2003b). Simulation analysis of the connecting transport AMHS in a wafer fab. IEEE Transactions on Semiconductor Manufacturing, 16(3), 555-564.
    • (2003) IEEE Transactions on Semiconductor Manufacturing , vol.16 , Issue.3 , pp. 555-564
    • Lin, J.1    Wang, F.2    Wu, C.3
  • 16
    • 27144534254 scopus 로고    scopus 로고
    • A hybrid push/pull-dispatching rule for a photobay in a 300mm wafer fab
    • Lin, J., Wang, F., & Chang, Y. (2006). A hybrid push/pull-dispatching rule for a photobay in a 300mm wafer fab. Robotics and Computer-Integrated Manufacturing, 22(1), 47-55.
    • (2006) Robotics and Computer-Integrated Manufacturing , vol.22 , Issue.1 , pp. 47-55
    • Lin, J.1    Wang, F.2    Chang, Y.3
  • 17
    • 58549092609 scopus 로고    scopus 로고
    • Preemptive scheduling in the presence of transportation times
    • Mourad, B., & Amina, H. (2009). Preemptive scheduling in the presence of transportation times. Computers and Operations Research, 36(8), 2387-2393.
    • (2009) Computers and Operations Research , vol.36 , Issue.8 , pp. 2387-2393
    • Mourad, B.1    Amina, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.