메뉴 건너뛰기




Volumn 2, Issue 4, 2010, Pages 316-335

Ant Colony Optimisation solution to distribution transformer planning problem

Author keywords

ACO; Ant colony optimisation; Distribution network planning; Energy loss cost; Optimal transformer sizing; OTS; Thermal loading; Transformers

Indexed keywords


EID: 82155186857     PISSN: 17550386     EISSN: 17550394     Source Type: Journal    
DOI: 10.1504/IJAIP.2010.036398     Document Type: Article
Times cited : (12)

References (25)
  • 2
    • 28944454561 scopus 로고    scopus 로고
    • Ant colony optimization: Introduction and recent trends
    • DOI 10.1016/j.plrev.2005.10.001, PII S1571064505000333
    • Blum, C. (2005) 'Ant colony optimization: introduction and recent trends', Physics of Life Reviews, Vol. 2, pp.353-373. (Pubitemid 41781478)
    • (2005) Physics of Life Reviews , vol.2 , Issue.4 , pp. 353-373
    • Blum, C.1
  • 4
    • 0033079528 scopus 로고    scopus 로고
    • A new approach to fault section estimation in power systems using ant system
    • Chang, C.S., Tian, L. and Wen, F.S. (1999) 'A new approach to fault section estimation in power systems using Ant system', Electric Power Systems Research, Vol. 49, pp.63-70.
    • (1999) Electric Power Systems Research , vol.49 , pp. 63-70
    • Chang, C.S.1    Tian, L.2    Wen, F.S.3
  • 9
    • 0024827650 scopus 로고
    • Self-organized shortcuts in the Argentine ant
    • Goss, S., Aron, S., Deneubourg, J.L. and Pasteels, J.M. (1989) 'Self-organized shortcuts in the argentine ant', Naturwissenschaften, Vol. 76, pp.579-581. (Pubitemid 20073252)
    • (1989) Naturwissenschaften , vol.76 , Issue.12 , pp. 579-581
    • Goss, S.1    Aron, S.2    Deneubourg, J.L.3    Pasteels, J.M.4
  • 10
    • 4043095433 scopus 로고    scopus 로고
    • A thermal loading guide for residential distribution transformers based on time-variant current load models
    • Heunis, S.W. and Herman, R. (2004) 'A thermal loading guide for residential distribution transformers based on time-variant current load models', IEEE Trans. Power Syst., Vol. 19, pp.1294-1298.
    • (2004) IEEE Trans. Power Syst. , vol.19 , pp. 1294-1298
    • Heunis, S.W.1    Herman, R.2
  • 11
    • 0035451122 scopus 로고    scopus 로고
    • Enhancement of hydroelectric generation scheduling using ant colony system based optimization approaches
    • Huang, S.J. (2001) 'Enhancement of hydroelectric generation scheduling using ant colony system based optimization approaches', IEEE Trans. Energy Conver., Vol. 16, pp.296-301.
    • (2001) IEEE Trans. Energy Conver. , vol.16 , pp. 296-301
    • Huang, S.J.1
  • 13
    • 24944472828 scopus 로고    scopus 로고
    • Application of ant colony algorithm for network reconfiguration in distribution systems
    • Seoul, Korea
    • Jeon, Y.J., Kim, J.C., Yun, S.Y. and Lee, K.Y. (2003) 'Application of ant colony algorithm for network reconfiguration in distribution systems', Proc. Symp. Power Plants Power Syst. Control, Seoul, Korea, pp.266-271.
    • (2003) Proc. Symp. Power Plants Power Syst. Control , pp. 266-271
    • Jeon, Y.J.1    Kim, J.C.2    Yun, S.Y.3    Lee, K.Y.4
  • 14
    • 0037734005 scopus 로고    scopus 로고
    • Planning of optimal location and sizes of distribution transformers using integer programming
    • Jovanovic, D. (2003) 'Planning of optimal location and sizes of distribution transformers using integer programming', Electrical Power and Energy Systems, Vol. 25, pp.717-723.
    • (2003) Electrical Power and Energy Systems , vol.25 , pp. 717-723
    • Jovanovic, D.1
  • 16
    • 0000127689 scopus 로고    scopus 로고
    • Exact and approximate nondeterministic tree-search procedures for the quadratic assignment problem
    • Maniezzo, V. (1999) 'Exact and approximate nondeterministic tree-search procedures for the quadratic assignment problem', INFORMS Journal on Computing, Vol. 11, pp.358-369.
    • (1999) INFORMS Journal on Computing , vol.11 , pp. 358-369
    • Maniezzo, V.1
  • 17
    • 0036672003 scopus 로고    scopus 로고
    • Ant colony optimization for resource-constrained project scheduling
    • DOI 10.1109/TEVC.2002.802450, PII 1011092002802450
    • Merkle, D., Middendorf, M. and Schmeck, H. (2002) 'Ant colony optimization for resource-constrained project scheduling', IEEE Transactions on Evolutionary Computation, Vol. 6, pp.333-346. (Pubitemid 35032735)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.4 , pp. 333-346
    • Merkle, D.1    Middendorf, M.2    Schmeck, H.3
  • 18
    • 33751541000 scopus 로고    scopus 로고
    • US Navy power transformer sizing requirements using probabilistic analysis
    • Robinson, M., Wallace, S., Woodward, D. and Engstrom, G. (2006) 'US Navy power transformer sizing requirements using probabilistic analysis', Journal of Ship Production, Vol. 22, pp.212-218 (Pubitemid 44836256)
    • (2006) Journal of Ship Production , vol.22 , Issue.4 , pp. 212-218
    • Robinson, M.C.1    Wallace, S.E.2    Woodward, D.C.3    Engstrom, G.4
  • 19
    • 0026941796 scopus 로고
    • Initial transformer sizing for single-phase residential load
    • DOI 10.1109/61.157012
    • Schneider, K. and Hoad, R. (1992) 'Initial transformer sizing for single-phase residential load', IEEE Trans. Power Delivery, Vol. 7, pp.2074-2081. (Pubitemid 23568738)
    • (1992) IEEE Transactions on Power Delivery , vol.7 , Issue.4 , pp. 2074-2081
    • Schneider Kirk, C.1    Hoad Raymond, F.2
  • 20
    • 0033363476 scopus 로고    scopus 로고
    • Combined heat and power economic dispatch by improved ant colony search algorithm
    • DOI 10.1016/S0378-7796(99)00011-5
    • Song, Y.H., Chou, C.S. and Stonham, T.J. (1999) 'Combined heat and power economic dispatch by improved ant colony search algorithm', Electric Power Systems Research, Vol. 52, pp.115-121. (Pubitemid 30501593)
    • (1999) Electric Power Systems Research , vol.52 , Issue.2 , pp. 115-121
    • Song, Y.H.1    Chou, C.S.2    Stonham, T.J.3
  • 22
    • 0037291036 scopus 로고    scopus 로고
    • A novel acs-based optimum switch relocation method
    • Teng, J.H. and Liu, Y-H. (2003) 'A novel ACS-based optimum switch relocation method', IEEE Trans. Power Syst., Vol. 18, pp.113-120.
    • (2003) IEEE Trans. Power Syst. , vol.18 , pp. 113-120
    • Teng, J.H.1    Liu, Y.-H.2
  • 23
    • 84958762089 scopus 로고    scopus 로고
    • Ant colony optimization for the ship berthing problem
    • Thiagarajan, P.S. and Yap, R. (Eds.) LNCS 1742, Springer-Verlag Berlin, Heidelberg
    • Tong, C.J., Lau, H.C. and Lim, A. (1999) 'Ant colony optimization for the ship berthing problem', in Thiagarajan, P.S. and Yap, R. (Eds.): ASIAN'99, LNCS 1742, Springer-Verlag, Berlin, Heidelberg, pp.359-370.
    • (1999) ASIAN , vol.99 , pp. 359-370
    • Tong, C.J.1    Lau, H.C.2    Lim, A.3
  • 24
    • 24944473998 scopus 로고    scopus 로고
    • Ant colony system-based algorithm for constrained load flow problem
    • DOI 10.1109/TPWRS.2005.851969
    • Vlachogiannis, J.G., Hatziargyriou, N.D. and Lee, K.Y. (2005) 'Ant colony system-based algorithm for constrained load flow problem', IEEE Trans. on Power Systems, Vol. 20, pp.1241-1249. (Pubitemid 41300935)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.3 , pp. 1241-1249
    • Vlachogiannis, J.G.1    Hatziargyriou, N.D.2    Lee, K.Y.3
  • 25
    • 85037929173 scopus 로고    scopus 로고
    • Application of the ant colony search algorithm to short-term generation scheduling problem of thermal units
    • Beijing, China
    • Yu, I.K., Chou, C.S. and Song, Y.H. (1998) 'Application of the ant colony search algorithm to short-term generation scheduling problem of thermal units', Proc. Int. Conf. Power Syst. Tech., Beijing, China, Vol. 1, pp.552-556.
    • (1998) Proc. Int. Conf. Power Syst. Tech , vol.1 , pp. 552-556
    • Yu, I.K.1    Chou, C.S.2    Song, Y.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.