-
1
-
-
40849130689
-
COMSOAL: A computer method of sequencing operations for assembly lines
-
Arcus A.L. COMSOAL: A computer method of sequencing operations for assembly lines. International Journal of Production Research 4 (1966) 259-277
-
(1966)
International Journal of Production Research
, vol.4
, pp. 259-277
-
-
Arcus, A.L.1
-
3
-
-
0022768294
-
A survey of exact algorithms for the simple assembly line balancing problem
-
Baybars I. A survey of exact algorithms for the simple assembly line balancing problem. Management Science 32 (1986) 909-932
-
(1986)
Management Science
, vol.32
, pp. 909-932
-
-
Baybars, I.1
-
4
-
-
25144450992
-
A survey on problems and methods in generalized assembly line balancing
-
Becker C., and Scholl A. A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research 168 (2006) 694-715
-
(2006)
European Journal of Operational Research
, vol.168
, pp. 694-715
-
-
Becker, C.1
Scholl, A.2
-
5
-
-
0345201636
-
Single-machine scheduling with learning considerations
-
Biskup D. Single-machine scheduling with learning considerations. European Journal of Operational Research 115 (1999) 173-178
-
(1999)
European Journal of Operational Research
, vol.115
, pp. 173-178
-
-
Biskup, D.1
-
7
-
-
0023965074
-
Modeling the effects of learning and job enlargement on assembly systems with parallel lines
-
Chakravarty A.K., and Shtub A. Modeling the effects of learning and job enlargement on assembly systems with parallel lines. International Journal of Production Research 26 2 (1988) 267-281
-
(1988)
International Journal of Production Research
, vol.26
, Issue.2
, pp. 267-281
-
-
Chakravarty, A.K.1
Shtub, A.2
-
8
-
-
0032040841
-
Optimizing the number of stations in assembly lines under learning for limited production
-
Cohen Y., and Dar-El M.E. Optimizing the number of stations in assembly lines under learning for limited production. Production Planning and Control 9 3 (1998) 230-240
-
(1998)
Production Planning and Control
, vol.9
, Issue.3
, pp. 230-240
-
-
Cohen, Y.1
Dar-El, M.E.2
-
9
-
-
25144463243
-
Optimal allocation of work in assembly lines for lots with homogenous learning
-
Cohen Y., Vitner G., and Sarin S.C. Optimal allocation of work in assembly lines for lots with homogenous learning. European Journal of Operational Research 168 (2006) 922-931
-
(2006)
European Journal of Operational Research
, vol.168
, pp. 922-931
-
-
Cohen, Y.1
Vitner, G.2
Sarin, S.C.3
-
10
-
-
17444423715
-
A heuristic approach for transfer lines balancing
-
Dolgui A., Finel B., Vernadat F., Guschinsky N., and Levin G. A heuristic approach for transfer lines balancing. Journal of Intelligent Manufacturing 16 2 (2005) 159-172
-
(2005)
Journal of Intelligent Manufacturing
, vol.16
, Issue.2
, pp. 159-172
-
-
Dolgui, A.1
Finel, B.2
Vernadat, F.3
Guschinsky, N.4
Levin, G.5
-
11
-
-
0032117097
-
A survey of the assembly line balancing procedures
-
Erel E., and Sarin S.C. A survey of the assembly line balancing procedures. Production Planning and Control 9 (1998) 414-434
-
(1998)
Production Planning and Control
, vol.9
, pp. 414-434
-
-
Erel, E.1
Sarin, S.C.2
-
12
-
-
0024641634
-
A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
-
Ghosh S., and Gagnon R.J. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research 27 (1989) 637-670
-
(1989)
International Journal of Production Research
, vol.27
, pp. 637-670
-
-
Ghosh, S.1
Gagnon, R.J.2
-
14
-
-
0025700721
-
Minimizing the makespan with late starts penalties added the processing times in a single facility scheduling problem
-
Kunnatur A.S., and Gupta S.K. Minimizing the makespan with late starts penalties added the processing times in a single facility scheduling problem. European Journal of Operational Research 47 (1990) 56-64
-
(1990)
European Journal of Operational Research
, vol.47
, pp. 56-64
-
-
Kunnatur, A.S.1
Gupta, S.K.2
-
15
-
-
0026258725
-
V-shaped policies for scheduling deteriorating jobs
-
Mosheiov G. V-shaped policies for scheduling deteriorating jobs. Operations Research 39 (1991) 979-991
-
(1991)
Operations Research
, vol.39
, pp. 979-991
-
-
Mosheiov, G.1
-
16
-
-
0030305471
-
Λ-shaped policies to schedule deteriorating jobs
-
Mosheiov G. Λ-shaped policies to schedule deteriorating jobs. Journal of Operational Research Society 47 (1996) 1184-1191
-
(1996)
Journal of Operational Research Society
, vol.47
, pp. 1184-1191
-
-
Mosheiov, G.1
-
20
-
-
25144482035
-
State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
-
Scholl A., and Becker C. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operational Research 168 (2006) 666-693
-
(2006)
European Journal of Operational Research
, vol.168
, pp. 666-693
-
-
Scholl, A.1
Becker, C.2
|