-
1
-
-
85135755631
-
The assembly line balancing problem
-
ME Salveson 1955 The assembly line balancing problem J Ind Eng 6 3 18 25
-
(1955)
J Ind Eng
, vol.6
, Issue.3
, pp. 18-25
-
-
Salveson, M.E.1
-
2
-
-
0022768294
-
A survey of exact algorithms for the simple line balancing problem
-
I Baybars 1986 A survey of exact algorithms for the simple line balancing problem Manage Sci 32 8 909 932 0601.90081 10.1287/mnsc.32.8.909 851697 (Pubitemid 16612186)
-
(1986)
Management Science
, vol.32
, Issue.8
, pp. 909-932
-
-
Baybars Ilker1
-
3
-
-
0024641634
-
A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
-
10.1080/00207548908942574
-
S Ghosh J Gagnon 1989 A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems Int J Prod Res 27 4 637 670 10.1080/00207548908942574
-
(1989)
Int J Prod Res
, vol.27
, Issue.4
, pp. 637-670
-
-
Ghosh, S.1
Gagnon, J.2
-
4
-
-
0032117097
-
A survey of the assembly line balancing procedures
-
E Erel SC Sarin 1998 A survey of the assembly line balancing procedures Prod Plan Control 9 5 414 434 10.1080/095372898233902 (Pubitemid 128624333)
-
(1998)
Production Planning and Control
, vol.9
, Issue.5
, pp. 414-434
-
-
Erel, E.1
Sarin, S.C.2
-
5
-
-
25144450992
-
A survey on problems and methods in generalized assembly line balancing
-
DOI 10.1016/j.ejor.2004.07.023, PII S0377221704004801, Balancing Assembly and Transfer Lines
-
C Becker A Scholl 2006 A survey on problems and methods in generalised assembly line balancing Eur J Oper Res 168 3 694 715 1083.90013 10.1016/j.ejor.2004.07.023 2169605 (Pubitemid 41336587)
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 694-715
-
-
Becker, C.1
Scholl, A.2
-
6
-
-
70449596223
-
A mixed integer linear programming formulation for optimal balancing of mixed-model U-lines
-
1198.90132 10.1080/00207540801905486 (33)
-
Y Kara M Tekin 2009 A mixed integer linear programming formulation for optimal balancing of mixed-model U-lines Int J Prod Res 47 15 4201 4233 1198.90132 10.1080/00207540801905486 (33)
-
(2009)
Int J Prod Res
, vol.47
, Issue.15
, pp. 4201-4233
-
-
Kara, Y.1
Tekin, M.2
-
7
-
-
84960656106
-
On a multiproduct assembly line-balancing problem
-
SD Roberts CD Villa 1970 On a multiproduct assembly line-balancing problem AIIE Trans 2 4 361 364
-
(1970)
AIIE Trans
, vol.2
, Issue.4
, pp. 361-364
-
-
Roberts, S.D.1
Villa, C.D.2
-
8
-
-
0036466886
-
Mixed model assembly line design in a make-to-order environment
-
DOI 10.1016/S0360-8352(01)00065-1, PII S0360835201000651
-
J Bukchin EM Dar-El J Rubinovitz 2002 Mixed model assembly line design in a make-to-order environment Comput Ind Eng 41 4 405 421 10.1016/S0360-8352(01) 00065-1 (Pubitemid 34040915)
-
(2002)
Computers and Industrial Engineering
, vol.41
, Issue.4
, pp. 405-421
-
-
Bukchin, J.1
Dar-El, E.M.2
Rubinovitz, J.3
-
9
-
-
33845260328
-
A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs
-
DOI 10.1016/j.ejor.2005.01.055, PII S0377221705002092
-
Y Bukchin I Rabinowitch 2006 A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs Eur J Oper Res 174 1 492 508 1116.90035 10.1016/j.ejor.2005.01.055 (Pubitemid 44866834)
-
(2006)
European Journal of Operational Research
, vol.174
, Issue.1
, pp. 492-508
-
-
Bukchin, Y.1
Rabinowitch, I.2
-
10
-
-
0011744338
-
Currently practised formulations for the assembly line balancing problem
-
10.1016/0272-6963(83)90005-0
-
RE Gunther GD Johnson RS Peterson 1983 Currently practised formulations for the assembly line balancing problem J Oper Manag 3 4 209 221 10.1016/0272-6963(83)90005-0
-
(1983)
J Oper Manag
, vol.3
, Issue.4
, pp. 209-221
-
-
Gunther, R.E.1
Johnson, G.D.2
Peterson, R.S.3
-
11
-
-
0024683477
-
Balancing cycle time and workstations
-
10.1080/07408178908966213
-
RF Deckro 1989 Balancing cycle time and workstations IIE Trans 21 2 106 111 10.1080/07408178908966213
-
(1989)
IIE Trans
, vol.21
, Issue.2
, pp. 106-111
-
-
Deckro, R.F.1
-
12
-
-
0025559327
-
A goal approach to assembly line balancing
-
0718.90044 10.1016/0305-0548(90)90055-C
-
RF Deckro S Rangachari 1990 A goal approach to assembly line balancing Comput Oper Res 17 5 509 521 0718.90044 10.1016/0305-0548(90)90055-C
-
(1990)
Comput Oper Res
, vol.17
, Issue.5
, pp. 509-521
-
-
Deckro, R.F.1
Rangachari, S.2
-
13
-
-
0026238769
-
Multiple criteria decision making approach for the assembly line balancing problem
-
B Malakooti 1991 A multiple criteria decision making approach for the assembly line balancing problem Int J Prod Res 29 10 1979 2001 0729.90572 10.1080/00207549108948063 (Pubitemid 21693199)
-
(1991)
International Journal of Production Research
, vol.29
, Issue.10
, pp. 1979-2001
-
-
Malakooti, B.1
-
14
-
-
0030785015
-
A goal programming approach to mixed-model assembly line balancing problem
-
PII S0925527396000692
-
H Gökçen E Erel 1997 A goal programming approach to mixed-model assembly line balancing problem Int J Prod Econ 48 2 177 185 10.1016/S0925-5273(96)00069-2 (Pubitemid 127371443)
-
(1997)
International Journal of Production Economics
, vol.48
, Issue.2
, pp. 177-185
-
-
Gokcen, H.1
Erel, E.2
-
15
-
-
56249109072
-
Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing
-
1175.90356 10.1016/j.ejor.2008.01.003 2468661
-
Y Kara T Paksoy CT Chang 2009 Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing Eur J Oper Res 195 2 335 347 1175.90356 10.1016/j.ejor.2008.01.003 2468661
-
(2009)
Eur J Oper Res
, vol.195
, Issue.2
, pp. 335-347
-
-
Kara, Y.1
Paksoy, T.2
Chang, C.T.3
-
16
-
-
0028550722
-
Design for synchronized flow manufacturing
-
0823.90047 10.1287/mnsc.40.11.1469
-
RH Ahmadi H Wurgaft 1994 Design for synchronized flow manufacturing Manage Sci 40 11 1469 1483 0823.90047 10.1287/mnsc.40.11.1469
-
(1994)
Manage Sci
, vol.40
, Issue.11
, pp. 1469-1483
-
-
Ahmadi, R.H.1
Wurgaft, H.2
-
17
-
-
0004807273
-
The mixed and multi model line balancing problem: A comparison
-
PII S0377221796001622
-
JIVZD Fokkert TG de Kok 1997 The mixed and multi model line balancing problem: a comparison Eur J Oper Res 100 3 399 412 0921.90085 10.1016/S0377-2217(96)00162-2 (Pubitemid 127392365)
-
(1997)
European Journal of Operational Research
, vol.100
, Issue.3
, pp. 399-412
-
-
Van Zante-De Fokkert, J.I.1
De Kok, T.G.2
-
18
-
-
58249083327
-
Assembly line balancing: Joint precedence graphs under high product variety
-
10.1080/07408170801965082
-
N Boysen M Fliedner A Scholl 2009 Assembly line balancing: joint precedence graphs under high product variety IIE Trans 41 3 183 193 10.1080/07408170801965082
-
(2009)
IIE Trans
, vol.41
, Issue.3
, pp. 183-193
-
-
Boysen, N.1
Fliedner, M.2
Scholl, A.3
-
19
-
-
0032306640
-
Goal programming for decision making: An overview of the current state-of-the-art
-
PII S0377221797003172
-
M Tamiz D Jones C Romero 1998 Goal programming for decision making: an overview of the current state-of-the-art Eur J Oper Res 111 3 569 581 0937.90048 10.1016/S0377-2217(97)00317-2 (Pubitemid 128410914)
-
(1998)
European Journal of Operational Research
, vol.111
, Issue.3
, pp. 569-581
-
-
Tamiz, M.1
Jones, D.2
Romero, C.3
-
23
-
-
34248666540
-
Fuzzy sets
-
0139.24606 10.1016/S0019-9958(65)90241-X 219427
-
LA Zadeh 1965 Fuzzy sets Inf Control 8 3 338 353 0139.24606 10.1016/S0019-9958(65)90241-X 219427
-
(1965)
Inf Control
, vol.8
, Issue.3
, pp. 338-353
-
-
Zadeh, L.A.1
-
24
-
-
49349136235
-
Fuzzy programming and linear programming with several objective functions
-
10.1016/0165-0114(78)90031-3 1144453
-
HJ Zimmerman 1978 Fuzzy programming and linear programming with several objective functions Fuzzy Sets Syst 1 1 45 55 10.1016/0165-0114(78)90031-3 1144453
-
(1978)
Fuzzy Sets Syst
, vol.1
, Issue.1
, pp. 45-55
-
-
Zimmerman, H.J.1
-
25
-
-
84989436529
-
Goal programming in a fuzzy environment
-
10.1111/j.1540-5915.1980.tb01142.x 451779
-
R Narasimhan 1980 Goal programming in a fuzzy environment Decis Sci 11 2 325 336 10.1111/j.1540-5915.1980.tb01142.x 451779
-
(1980)
Decis Sci
, vol.11
, Issue.2
, pp. 325-336
-
-
Narasimhan, R.1
-
26
-
-
0022750371
-
Priority structure in fuzzy goal programming
-
DOI 10.1016/0165-0114(86)90054-0
-
RN Tiwari S Dharmar JR Rao 1986 Priority structure in fuzzy goal programming Fuzzy Sets Syst 19 3 251 259 0602.90078 10.1016/0165-0114(86)90054-0 848664 (Pubitemid 18549663)
-
(1986)
Fuzzy Sets and Systems
, vol.19
, Issue.3
, pp. 251-259
-
-
Tiwari, R.N.1
Dharmar, S.2
Rao, J.R.3
-
27
-
-
0031234571
-
A generalization of fuzzy goal programming with preemptive structure
-
0893.90175 10.1016/S0305-0548(96)00096-2 1461411
-
HF Wang CC Fu 1997 A generalization of fuzzy goal programming with preemptive structure Comput Oper Res 24 9 819 828 0893.90175 10.1016/S0305-0548(96)00096-2 1461411
-
(1997)
Comput Oper Res
, vol.24
, Issue.9
, pp. 819-828
-
-
Wang, H.F.1
Fu, C.C.2
-
28
-
-
0035899776
-
Fuzzy goal programming with different importance and priorities
-
DOI 10.1016/S0377-2217(00)00201-0, PII S0377221700002010
-
LH Chen FC Tsai 2001 Fuzzy goal programming with different importance and priorities Eur J Oper Res 133 3 548 556 1053.90140 10.1016/S0377-2217(00)00201- 0 (Pubitemid 32594614)
-
(2001)
European Journal of Operational Research
, vol.133
, Issue.3
, pp. 548-556
-
-
Chen, L.-H.1
Tsai, F.-C.2
-
29
-
-
33846302438
-
Binary fuzzy goal programming
-
DOI 10.1016/j.ejor.2006.03.030, PII S0377221706002116
-
CT Chang 2007 Binary fuzzy goal programming Eur J Oper Res 180 1 29 37 1114.90165 10.1016/j.ejor.2006.03.030 (Pubitemid 46123841)
-
(2007)
European Journal of Operational Research
, vol.180
, Issue.1
, pp. 29-37
-
-
Chang, C.-T.1
|