-
2
-
-
0043253368
-
Formalization and automation of time-space conflict analysis
-
Akinci B., Fischer M., Levitt R. and Carlson R. (2002). Formalization and automation of time-space conflict analysis, Journal of Computing in Civil Engineering, Vol. 16, No. 2, 124-134.
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, Issue.2
, pp. 124-134
-
-
Akinci, B.1
Fischer, M.2
Levitt, R.3
Carlson, R.4
-
4
-
-
0036603977
-
Scheduling system for high rise building construction
-
Arditi D., Sikangwan P. and Tokdemir O.B. (2002). Scheduling system for high rise building construction, Construction Management and Economics, Vol. 20, No. 3, 353-364.
-
(2002)
Construction Management and Economics
, vol.20
, Issue.3
, pp. 353-364
-
-
Arditi, D.1
Sikangwan, P.2
Tokdemir, O.B.3
-
9
-
-
0025507882
-
Bar code-driven equipment and materials tracking for construction
-
Bernold L.E. (1990). Bar code-driven equipment and materials tracking for construction, Journal of Computing in Civil Engineering, Vol. 4, No. 4, 381-395.
-
(1990)
Journal of Computing in Civil Engineering
, vol.4
, Issue.4
, pp. 381-395
-
-
Bernold, L.E.1
-
11
-
-
0037332752
-
Application of data warehouse and decision support system in construction management
-
Chau K.W., Cao Y., Anson M. and Zhang J. (2002). Application of data warehouse and decision support system in construction management, Automation in Construction, Vol. 12, 213-224.
-
(2002)
Automation in Construction
, vol.12
, pp. 213-224
-
-
Chau, K.W.1
Cao, Y.2
Anson, M.3
Zhang, J.4
-
12
-
-
0026062850
-
Integrating CAD with construction schedule generation
-
Cherneff J., Logcher R. and Sriram D. (1991). Integrating CAD with construction schedule generation, Journal of Computing in Civil Engineering, Vol. 5, No. 1, 64-84.
-
(1991)
Journal of Computing in Civil Engineering
, vol.5
, Issue.1
, pp. 64-84
-
-
Cherneff, J.1
Logcher, R.2
Sriram, D.3
-
13
-
-
0032667279
-
WorkPlan: Constraint-based database for work package scheduling
-
Choo H.J., Tommelein I.D., Ballard G. and Zabelle T. R. (1999). WorkPlan: constraint-based database for work package scheduling, Journal of Construction Engineering and Management, Vol. 125, No. 3, 151-160.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 151-160
-
-
Choo, H.J.1
Tommelein, I.D.2
Ballard, G.3
Zabelle, T.R.4
-
15
-
-
1442312867
-
4D visualisation development: Real life case studies
-
Aarhus, Denmark
-
Dawood N., Sriprasert E. and Mallasi Z. (2002a). 4D visualisation development: real life case studies, Proceedings of CIB w78 Conference 2002, Aarhus, Denmark, 53-59.
-
(2002)
Proceedings of CIB w78 Conference 2002
, pp. 53-59
-
-
Dawood, N.1
Sriprasert, E.2
Mallasi, Z.3
-
16
-
-
2942721113
-
Product and process integration for 4D visualisation at construction site level: A Uniclass-driven approach
-
Portoroz, Slovenia
-
Dawood N., Sriprasert E., Mallasi Z. and Hobbs B. (2002b). Product and process integration for 4D visualisation at construction site level: a Uniclass-driven approach, Proceedings of the Fourth European Conference on Product and Process Modelling in the Building and Related Industries (ECPPM), Portoroz, Slovenia, 409-416.
-
(2002)
Proceedings of the Fourth European Conference on Product and Process Modelling in the Building and Related Industries (ECPPM)
, pp. 409-416
-
-
Dawood, N.1
Sriprasert, E.2
Mallasi, Z.3
Hobbs, B.4
-
17
-
-
2942717352
-
An industrial evaluation of the virtual construction site (VIRCON) tools
-
Auckland, New Zealand
-
Dawood N., Sriprasert E., Mallasi Z. and Scott D. (2003a). An industrial evaluation of the virtual construction site (VIRCON) tools, Proceedings of CIB w78 Conference 2003, Auckland, New Zealand.
-
(2003)
Proceedings of CIB W78 Conference 2003
-
-
Dawood, N.1
Sriprasert, E.2
Mallasi, Z.3
Scott, D.4
-
18
-
-
0037332742
-
Development of an integrated information resource base for 4D/VR construction processes simulation
-
Dawood N., Sriprasert E., Mallasi Z. and Hobbs B. (2003b). Development of an integrated information resource base for 4D/VR construction processes simulation, Automation in Construction, Vol. 12, No. 2, 123-131.
-
(2003)
Automation in Construction
, vol.12
, Issue.2
, pp. 123-131
-
-
Dawood, N.1
Sriprasert, E.2
Mallasi, Z.3
Hobbs, B.4
-
19
-
-
0032073196
-
Wireless communication and computing at the construction jobsite
-
De la Garza J.M. and Howitt I. (1998). Wireless communication and computing at the construction jobsite, Automation in Construction, Vol. 7, No. 4, 327-347.
-
(1998)
Automation in Construction
, vol.7
, Issue.4
, pp. 327-347
-
-
De la Garza, J.M.1
Howitt, I.2
-
20
-
-
0034937996
-
An application of the Internet-based project management system
-
Deng Z.M., Li H., Tam C.M., Shen Q.P. and Love P.E.D. (2001). An application of the Internet-based project management system, Automation in Construction, Vol. 10, No. 2, 239-246.
-
(2001)
Automation in Construction
, vol.10
, Issue.2
, pp. 239-246
-
-
Deng, Z.M.1
Li, H.2
Tam, C.M.3
Shen, Q.P.4
Love, P.E.D.5
-
23
-
-
0038778148
-
Multi-stakeholder collaboration: The CIFE iRoom
-
Aarhus, Denmark
-
Fischer M., Stone M., Liston K., Kunz J. and Vibha S. (2002). Multi-stakeholder collaboration: the CIFE iRoom, Proceedings of GIB w78 Conference 2002, Aarhus, Denmark, 6-13.
-
(2002)
Proceedings of GIB w78 Conference 2002
, pp. 6-13
-
-
Fischer, M.1
Stone, M.2
Liston, K.3
Kunz, J.4
Vibha, S.5
-
24
-
-
0002257445
-
Industry foundation classes for project management - A trial implementation
-
Froese T., Fischer M., Grobler F., Ritzenthaler J., Yu K., Sutherland S., Staub S., Akinci B., Akbas R., Koo B., Barron A. and Kunz J. (1999). Industry foundation classes for project management - a trial implementation, Electronic Journal of Information Technology in Construction, Vol. 4, 17-36.
-
(1999)
Electronic Journal of Information Technology in Construction
, vol.4
, pp. 17-36
-
-
Froese, T.1
Fischer, M.2
Grobler, F.3
Ritzenthaler, J.4
Yu, K.5
Sutherland, S.6
Staub, S.7
Akinci, B.8
Akbas, R.9
Koo, B.10
Barron, A.11
Kunz, J.12
-
27
-
-
0003926816
-
-
The North River Press, Great Barrington, MA
-
Goldratt E.M. (1997). Critical chain, The North River Press, Great Barrington, MA.
-
(1997)
Critical Chain
-
-
Goldratt, E.M.1
-
28
-
-
0036680235
-
Integration of virtually real construction model and design-for-safety process database
-
Hadikusumo B.H.W. and Rowlinson S. (2002). Integration of virtually real construction model and design-for-safety process database, Automation in Construction, Vol. 11, No. 5, 501-510.
-
(2002)
Automation in Construction
, vol.11
, Issue.5
, pp. 501-510
-
-
Hadikusumo, B.H.W.1
Rowlinson, S.2
-
32
-
-
2942750621
-
Task 7: Visualisation development
-
University of Wolverhampton
-
Heesom D. and Mahdjoubi L. (2001). Task 7: visualisation development, VIRCON Project Report, University of Wolverhampton.
-
(2001)
VIRCON Project Report
-
-
Heesom, D.1
Mahdjoubi, L.2
-
34
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy T. (1999). Optimization of resource allocation and leveling using genetic algorithms, Journal of Construction Engineering and Management, Vol. 125, No. 3, 167-175.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
35
-
-
0035480172
-
On the merits and pitfalls of critical chain scheduling
-
Herroelen W. and Leus R. (2001). On the merits and pitfalls of critical chain scheduling, Journal of Operations Management, Vol. 19, 559-577.
-
(2001)
Journal of Operations Management
, vol.19
, pp. 559-577
-
-
Herroelen, W.1
Leus, R.2
-
39
-
-
0030270521
-
Time and priority allocation scheduling technique for projects
-
Jaafari A. (1996). Time and priority allocation scheduling technique for projects, International Journal of Project Management, Vol. 14, No. 5, 289-299.
-
(1996)
International Journal of Project Management
, vol.14
, Issue.5
, pp. 289-299
-
-
Jaafari, A.1
-
42
-
-
25044442123
-
Visual product chronology
-
26-27 November 2001, Essen, Germany
-
Kähkönen K. and Leinonen J. (2001). Visual product chronology, Presentation given to the Workshop on Virtual Construction, Organised by ENCORD, 26-27 November 2001, Essen, Germany.
-
(2001)
Presentation Given to the Workshop on Virtual Construction, Organised by ENCORD
-
-
Kähkönen, K.1
Leinonen, J.2
-
43
-
-
0026238018
-
Extending artificial intelligence techniques for hierarchical planning
-
Kartam N.A., Levitt R.E. and Wilkins D.E. (1991). Extending artificial intelligence techniques for hierarchical planning, Journal of Computing in Civil engineering, Vol. 5, No. 4, 464-477.
-
(1991)
Journal of Computing in Civil Engineering
, vol.5
, Issue.4
, pp. 464-477
-
-
Kartam, N.A.1
Levitt, R.E.2
Wilkins, D.E.3
-
47
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
Leu S.-S. and Yang C.-H. (1999). GA-based multicriteria optimal model for construction scheduling, Journal of Construction Engineering and Management, Vol. 125, No. 6, 420-427.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.-S.1
Yang, C.-H.2
-
48
-
-
0032638332
-
Using machine learning and GA to solve time-cost trade-off problems
-
Li H., Cao J.-N. and Love P.E D. (1999). Using machine learning and GA to solve time-cost trade-off problems, Journal of Construction Engineering and Management, Vol. 125, No. 5, 347-353.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.5
, pp. 347-353
-
-
Li, H.1
Cao, J.-N.2
Love, P.E.D.3
-
49
-
-
2942724793
-
A generic inclusion of space strategies with activity execution patterns in 4D tools
-
Aarhus, Denmark
-
Mallasi Z. and Dawood N. (2003). A generic inclusion of space strategies with activity execution patterns in 4D tools, Proceedings of CIB w78 Conference 2002, Aarhus, Denmark, 83-90.
-
(2003)
Proceedings of CIB w78 Conference 2002
, pp. 83-90
-
-
Mallasi, Z.1
Dawood, N.2
-
52
-
-
0032165225
-
Generating, evaluating and visualizing construction schedule with CAD tools
-
McKinney K. and Fischer M. (1998). Generating, evaluating and visualizing construction schedule with CAD tools, Automation in Construction, Vol. 7, No. 6, 433-447.
-
(1998)
Automation in Construction
, vol.7
, Issue.6
, pp. 433-447
-
-
McKinney, K.1
Fischer, M.2
-
53
-
-
0037208764
-
An empirical investigation of users' perceptions of web-based communication on a construction project
-
Mohamed S. and Stewart R.A. (2003). An empirical investigation of users' perceptions of web-based communication on a construction project, Automation in Construction, Vol. 12, No. 1, 43-53.
-
(2003)
Automation in Construction
, vol.12
, Issue.1
, pp. 43-53
-
-
Mohamed, S.1
Stewart, R.A.2
-
56
-
-
1442360894
-
SEEK: Accomplishing enterprise information integration across heterogeneous sources
-
Special Issue: ICT for Knowledge Management in Construction
-
O'Brien W.J., Issa R.R.A., Hammer J., Schamalz M.S., Geunes J. and Bai S.X. (2002). SEEK: accomplishing enterprise information integration across heterogeneous sources, Electronic Journal of Information Technology in Construction, Special Issue: ICT for Knowledge Management in Construction, 101-124.
-
(2002)
Electronic Journal of Information Technology in Construction
, pp. 101-124
-
-
O'Brien, W.J.1
Issa, R.R.A.2
Hammer, J.3
Schamalz, M.S.4
Geunes, J.5
Bai, S.X.6
-
57
-
-
2942748749
-
A web-based information system for diagnosing, servicing and operating heating systems
-
Pakanen J.E., Möttönen V.J., Hyytinen M.J., Ruonansuu H.A. and Törmäkangas K.K. (2001). A web-based information system for diagnosing, servicing and operating heating systems, Electronic Journal of Information Technology in Construction, Vol. 6, 45-56.
-
(2001)
Electronic Journal of Information Technology in Construction
, vol.6
, pp. 45-56
-
-
Pakanen, J.E.1
Möttönen, V.J.2
Hyytinen, M.J.3
Ruonansuu, H.A.4
Törmäkangas, K.K.5
-
59
-
-
0032625743
-
Web-centric systems: A new paradigm for collaborative engineering
-
Rojas E.M., Songer A.D. (1999). Web-centric systems: a new paradigm for collaborative engineering, Journal of Management in Engineering, Vol. 15, No. 1, 39-45.
-
(1999)
Journal of Management in Engineering
, vol.15
, Issue.1
, pp. 39-45
-
-
Rojas, E.M.1
Songer, A.D.2
-
60
-
-
12444335465
-
Planning and control of concurrent engineering projects
-
Rolstadås A. (1995). Planning and control of concurrent engineering projects, International Journal of Production Economics, Vol. 38, 3-13.
-
(1995)
International Journal of Production Economics
, vol.38
, pp. 3-13
-
-
Rolstadås, A.1
-
61
-
-
2942739545
-
Building project model support for automated labor monitoring
-
Sacks R., Navon R. and Goldschmidt E. (2003). Building project model support for automated labor monitoring, Journal of Computing in Civil Engineering, Vol. 17, No. 1, 19-27.
-
(2003)
Journal of Computing in Civil Engineering
, vol.17
, Issue.1
, pp. 19-27
-
-
Sacks, R.1
Navon, R.2
Goldschmidt, E.3
-
62
-
-
0033886896
-
Object-oriented resource-based planning method (ORPM) for construction
-
Shi J.J. and Deng Z. (2000). Object-oriented resource-based planning method (ORPM) for construction, International Journal of Project Management, Vol. 18, 179-188.
-
(2000)
International Journal of Project Management
, vol.18
, pp. 179-188
-
-
Shi, J.J.1
Deng, Z.2
-
64
-
-
0036462627
-
Anticipating reuse: Documenting buildings for operations using web technology
-
Song Y., Clayton M.J. and Johnson R.E. (2002). Anticipating reuse: documenting buildings for operations using web technology, Automation in Construction, Vol. 11, No. 2, 185-197.
-
(2002)
Automation in Construction
, vol.11
, Issue.2
, pp. 185-197
-
-
Song, Y.1
Clayton, M.J.2
Johnson, R.E.3
-
65
-
-
2942706367
-
Potential of integrated digital technologies for construction work-face instruction
-
Chalmers, Gothenburg, Sweden
-
Sriprasert E. and Dawood N. (2001). Potential of integrated digital technologies for construction work-face instruction, Proceedings of AVRII and CONVR 2001, Chalmers, Gothenburg, Sweden, 136-145.
-
(2001)
Proceedings of AVRII and CONVR 2001
, pp. 136-145
-
-
Sriprasert, E.1
Dawood, N.2
-
66
-
-
1442288260
-
Lean enterprise web-based information system for construction (LEWIS): A framework
-
Aarhus, Denmark
-
Sriprasert E. and Dawood N. (2002a). Lean enterprise web-based information system for construction (LEWIS): a framework, Proceedings of CIB w78 Conference 2002, Aarhus, Denmark, 117-124.
-
(2002)
Proceedings of CIB w78 Conference 2002
, pp. 117-124
-
-
Sriprasert, E.1
Dawood, N.2
-
67
-
-
84855430702
-
Requirements identification for 4D constraint-based construction planning and control system
-
Aarhus, Denmark
-
Sriprasert E. and Dawood N. (2002b). Requirements identification for 4D constraint-based construction planning and control system, Proceedings of CIB w78 Conference 2002, Aarhus, Denmark, 177-183.
-
(2002)
Proceedings of CIB w78 Conference 2002
, pp. 177-183
-
-
Sriprasert, E.1
Dawood, N.2
-
69
-
-
84925113790
-
Genetic algorithms for multi-constraint scheduling: An application for the construction industry
-
Auckland, New Zealand
-
Sriprasert E. and Dawood N. (2003). Genetic algorithms for multi-constraint scheduling: an application for the construction industry, Proceedings of CIB w78 Conference 2003, Auckland, New Zealand.
-
(2003)
Proceedings of CIB w78 Conference 2003
-
-
Sriprasert, E.1
Dawood, N.2
-
70
-
-
0035426806
-
An investigation into the fundamentals of critical chain project scheduling
-
Steyn H. (2000). An investigation into the fundamentals of critical chain project scheduling, International Journal of Project Management, Vol. 19, 363-369.
-
(2000)
International Journal of Project Management
, vol.19
, pp. 363-369
-
-
Steyn, H.1
-
72
-
-
0030825017
-
ScaRC: Space-constrained resource-constrained scheduling system
-
Thabet W.Y. and Beliveau Y.J. (1997). ScaRC: Space-constrained resource-constrained scheduling system, Journal of Computing in Civil Engineering, Vol. 11, No. 1, 48-59.
-
(1997)
Journal of Computing in Civil Engineering
, vol.11
, Issue.1
, pp. 48-59
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
73
-
-
0035298885
-
Phenomenological foundations of conceptual product modelling in architecture, engineering, and construction
-
Turk Z. (2001). Phenomenological foundations of conceptual product modelling in architecture, engineering, and construction. Artificial Intelligence in Engineering, Vol. 15, No. 2, 83-92.
-
(2001)
Artificial Intelligence in Engineering
, vol.15
, Issue.2
, pp. 83-92
-
-
Turk, Z.1
-
74
-
-
0027574059
-
Model-based planning: Scaled-up construction application
-
Winstanley G., Chacon M.A. and Levitt R.E. (1993). Model-based planning: scaled-up construction application, Journal of Computing in Civil Engineering, Vol. 7, No. 2, 199-217.
-
(1993)
Journal of Computing in Civil Engineering
, vol.7
, Issue.2
, pp. 199-217
-
-
Winstanley, G.1
Chacon, M.A.2
Levitt, R.E.3
-
75
-
-
0033077414
-
A software industry perspective on AEC information models for distributed collaboration
-
Zamanian M.K. and Pittman J.H. (1999). A software industry perspective on AEC information models for distributed collaboration, Automation in Construction, Vol. 8, No. 3, 237-248.
-
(1999)
Automation in Construction
, vol.8
, Issue.3
, pp. 237-248
-
-
Zamanian, M.K.1
Pittman, J.H.2
|