메뉴 건너뛰기




Volumn 8, Issue , 2003, Pages 341-366

Multi-constraint information management and visualisation for collaborative planning and control in construction

Author keywords

4D visualisation; Lean construction; Multiple constraints; Planning and control; Web based information system

Indexed keywords

DECISION SUPPORT SYSTEMS; INFORMATION MANAGEMENT; PRODUCT DEVELOPMENT; PROJECT MANAGEMENT; SCHEDULING; VISUALIZATION;

EID: 2942750055     PISSN: 14006529     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (57)

References (75)
  • 9
    • 0025507882 scopus 로고
    • Bar code-driven equipment and materials tracking for construction
    • Bernold L.E. (1990). Bar code-driven equipment and materials tracking for construction, Journal of Computing in Civil Engineering, Vol. 4, No. 4, 381-395.
    • (1990) Journal of Computing in Civil Engineering , vol.4 , Issue.4 , pp. 381-395
    • Bernold, L.E.1
  • 10
  • 11
    • 0037332752 scopus 로고    scopus 로고
    • Application of data warehouse and decision support system in construction management
    • Chau K.W., Cao Y., Anson M. and Zhang J. (2002). Application of data warehouse and decision support system in construction management, Automation in Construction, Vol. 12, 213-224.
    • (2002) Automation in Construction , vol.12 , pp. 213-224
    • Chau, K.W.1    Cao, Y.2    Anson, M.3    Zhang, J.4
  • 18
    • 0037332742 scopus 로고    scopus 로고
    • Development of an integrated information resource base for 4D/VR construction processes simulation
    • Dawood N., Sriprasert E., Mallasi Z. and Hobbs B. (2003b). Development of an integrated information resource base for 4D/VR construction processes simulation, Automation in Construction, Vol. 12, No. 2, 123-131.
    • (2003) Automation in Construction , vol.12 , Issue.2 , pp. 123-131
    • Dawood, N.1    Sriprasert, E.2    Mallasi, Z.3    Hobbs, B.4
  • 19
    • 0032073196 scopus 로고    scopus 로고
    • Wireless communication and computing at the construction jobsite
    • De la Garza J.M. and Howitt I. (1998). Wireless communication and computing at the construction jobsite, Automation in Construction, Vol. 7, No. 4, 327-347.
    • (1998) Automation in Construction , vol.7 , Issue.4 , pp. 327-347
    • De la Garza, J.M.1    Howitt, I.2
  • 20
    • 0034937996 scopus 로고    scopus 로고
    • An application of the Internet-based project management system
    • Deng Z.M., Li H., Tam C.M., Shen Q.P. and Love P.E.D. (2001). An application of the Internet-based project management system, Automation in Construction, Vol. 10, No. 2, 239-246.
    • (2001) Automation in Construction , vol.10 , Issue.2 , pp. 239-246
    • Deng, Z.M.1    Li, H.2    Tam, C.M.3    Shen, Q.P.4    Love, P.E.D.5
  • 27
    • 0003926816 scopus 로고    scopus 로고
    • The North River Press, Great Barrington, MA
    • Goldratt E.M. (1997). Critical chain, The North River Press, Great Barrington, MA.
    • (1997) Critical Chain
    • Goldratt, E.M.1
  • 28
    • 0036680235 scopus 로고    scopus 로고
    • Integration of virtually real construction model and design-for-safety process database
    • Hadikusumo B.H.W. and Rowlinson S. (2002). Integration of virtually real construction model and design-for-safety process database, Automation in Construction, Vol. 11, No. 5, 501-510.
    • (2002) Automation in Construction , vol.11 , Issue.5 , pp. 501-510
    • Hadikusumo, B.H.W.1    Rowlinson, S.2
  • 32
    • 2942750621 scopus 로고    scopus 로고
    • Task 7: Visualisation development
    • University of Wolverhampton
    • Heesom D. and Mahdjoubi L. (2001). Task 7: visualisation development, VIRCON Project Report, University of Wolverhampton.
    • (2001) VIRCON Project Report
    • Heesom, D.1    Mahdjoubi, L.2
  • 34
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • Hegazy T. (1999). Optimization of resource allocation and leveling using genetic algorithms, Journal of Construction Engineering and Management, Vol. 125, No. 3, 167-175.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 35
    • 0035480172 scopus 로고    scopus 로고
    • On the merits and pitfalls of critical chain scheduling
    • Herroelen W. and Leus R. (2001). On the merits and pitfalls of critical chain scheduling, Journal of Operations Management, Vol. 19, 559-577.
    • (2001) Journal of Operations Management , vol.19 , pp. 559-577
    • Herroelen, W.1    Leus, R.2
  • 39
    • 0030270521 scopus 로고    scopus 로고
    • Time and priority allocation scheduling technique for projects
    • Jaafari A. (1996). Time and priority allocation scheduling technique for projects, International Journal of Project Management, Vol. 14, No. 5, 289-299.
    • (1996) International Journal of Project Management , vol.14 , Issue.5 , pp. 289-299
    • Jaafari, A.1
  • 40
  • 46
  • 47
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for construction scheduling
    • Leu S.-S. and Yang C.-H. (1999). GA-based multicriteria optimal model for construction scheduling, Journal of Construction Engineering and Management, Vol. 125, No. 6, 420-427.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.-S.1    Yang, C.-H.2
  • 49
    • 2942724793 scopus 로고    scopus 로고
    • A generic inclusion of space strategies with activity execution patterns in 4D tools
    • Aarhus, Denmark
    • Mallasi Z. and Dawood N. (2003). A generic inclusion of space strategies with activity execution patterns in 4D tools, Proceedings of CIB w78 Conference 2002, Aarhus, Denmark, 83-90.
    • (2003) Proceedings of CIB w78 Conference 2002 , pp. 83-90
    • Mallasi, Z.1    Dawood, N.2
  • 52
    • 0032165225 scopus 로고    scopus 로고
    • Generating, evaluating and visualizing construction schedule with CAD tools
    • McKinney K. and Fischer M. (1998). Generating, evaluating and visualizing construction schedule with CAD tools, Automation in Construction, Vol. 7, No. 6, 433-447.
    • (1998) Automation in Construction , vol.7 , Issue.6 , pp. 433-447
    • McKinney, K.1    Fischer, M.2
  • 53
    • 0037208764 scopus 로고    scopus 로고
    • An empirical investigation of users' perceptions of web-based communication on a construction project
    • Mohamed S. and Stewart R.A. (2003). An empirical investigation of users' perceptions of web-based communication on a construction project, Automation in Construction, Vol. 12, No. 1, 43-53.
    • (2003) Automation in Construction , vol.12 , Issue.1 , pp. 43-53
    • Mohamed, S.1    Stewart, R.A.2
  • 59
    • 0032625743 scopus 로고    scopus 로고
    • Web-centric systems: A new paradigm for collaborative engineering
    • Rojas E.M., Songer A.D. (1999). Web-centric systems: a new paradigm for collaborative engineering, Journal of Management in Engineering, Vol. 15, No. 1, 39-45.
    • (1999) Journal of Management in Engineering , vol.15 , Issue.1 , pp. 39-45
    • Rojas, E.M.1    Songer, A.D.2
  • 62
    • 0033886896 scopus 로고    scopus 로고
    • Object-oriented resource-based planning method (ORPM) for construction
    • Shi J.J. and Deng Z. (2000). Object-oriented resource-based planning method (ORPM) for construction, International Journal of Project Management, Vol. 18, 179-188.
    • (2000) International Journal of Project Management , vol.18 , pp. 179-188
    • Shi, J.J.1    Deng, Z.2
  • 64
    • 0036462627 scopus 로고    scopus 로고
    • Anticipating reuse: Documenting buildings for operations using web technology
    • Song Y., Clayton M.J. and Johnson R.E. (2002). Anticipating reuse: documenting buildings for operations using web technology, Automation in Construction, Vol. 11, No. 2, 185-197.
    • (2002) Automation in Construction , vol.11 , Issue.2 , pp. 185-197
    • Song, Y.1    Clayton, M.J.2    Johnson, R.E.3
  • 65
    • 2942706367 scopus 로고    scopus 로고
    • Potential of integrated digital technologies for construction work-face instruction
    • Chalmers, Gothenburg, Sweden
    • Sriprasert E. and Dawood N. (2001). Potential of integrated digital technologies for construction work-face instruction, Proceedings of AVRII and CONVR 2001, Chalmers, Gothenburg, Sweden, 136-145.
    • (2001) Proceedings of AVRII and CONVR 2001 , pp. 136-145
    • Sriprasert, E.1    Dawood, N.2
  • 66
    • 1442288260 scopus 로고    scopus 로고
    • Lean enterprise web-based information system for construction (LEWIS): A framework
    • Aarhus, Denmark
    • Sriprasert E. and Dawood N. (2002a). Lean enterprise web-based information system for construction (LEWIS): a framework, Proceedings of CIB w78 Conference 2002, Aarhus, Denmark, 117-124.
    • (2002) Proceedings of CIB w78 Conference 2002 , pp. 117-124
    • Sriprasert, E.1    Dawood, N.2
  • 67
    • 84855430702 scopus 로고    scopus 로고
    • Requirements identification for 4D constraint-based construction planning and control system
    • Aarhus, Denmark
    • Sriprasert E. and Dawood N. (2002b). Requirements identification for 4D constraint-based construction planning and control system, Proceedings of CIB w78 Conference 2002, Aarhus, Denmark, 177-183.
    • (2002) Proceedings of CIB w78 Conference 2002 , pp. 177-183
    • Sriprasert, E.1    Dawood, N.2
  • 69
    • 84925113790 scopus 로고    scopus 로고
    • Genetic algorithms for multi-constraint scheduling: An application for the construction industry
    • Auckland, New Zealand
    • Sriprasert E. and Dawood N. (2003). Genetic algorithms for multi-constraint scheduling: an application for the construction industry, Proceedings of CIB w78 Conference 2003, Auckland, New Zealand.
    • (2003) Proceedings of CIB w78 Conference 2003
    • Sriprasert, E.1    Dawood, N.2
  • 70
    • 0035426806 scopus 로고    scopus 로고
    • An investigation into the fundamentals of critical chain project scheduling
    • Steyn H. (2000). An investigation into the fundamentals of critical chain project scheduling, International Journal of Project Management, Vol. 19, 363-369.
    • (2000) International Journal of Project Management , vol.19 , pp. 363-369
    • Steyn, H.1
  • 72
    • 0030825017 scopus 로고    scopus 로고
    • ScaRC: Space-constrained resource-constrained scheduling system
    • Thabet W.Y. and Beliveau Y.J. (1997). ScaRC: Space-constrained resource-constrained scheduling system, Journal of Computing in Civil Engineering, Vol. 11, No. 1, 48-59.
    • (1997) Journal of Computing in Civil Engineering , vol.11 , Issue.1 , pp. 48-59
    • Thabet, W.Y.1    Beliveau, Y.J.2
  • 73
    • 0035298885 scopus 로고    scopus 로고
    • Phenomenological foundations of conceptual product modelling in architecture, engineering, and construction
    • Turk Z. (2001). Phenomenological foundations of conceptual product modelling in architecture, engineering, and construction. Artificial Intelligence in Engineering, Vol. 15, No. 2, 83-92.
    • (2001) Artificial Intelligence in Engineering , vol.15 , Issue.2 , pp. 83-92
    • Turk, Z.1
  • 75
    • 0033077414 scopus 로고    scopus 로고
    • A software industry perspective on AEC information models for distributed collaboration
    • Zamanian M.K. and Pittman J.H. (1999). A software industry perspective on AEC information models for distributed collaboration, Automation in Construction, Vol. 8, No. 3, 237-248.
    • (1999) Automation in Construction , vol.8 , Issue.3 , pp. 237-248
    • Zamanian, M.K.1    Pittman, J.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.