-
1
-
-
0037400797
-
Implementation of visualization as planning and scheduling tool in construction
-
Chau K. W., Anson M., Zhang J. P. (2003). Implementation of visualization as planning and scheduling tool in construction, Building and Environment, 38, 713-719.
-
(2003)
Building and Environment
, vol.38
, pp. 713-719
-
-
Chau, K.W.1
Anson, M.2
Zhang, J.P.3
-
2
-
-
1842832075
-
Trends of 4D CAD applications for construction planning
-
Heesom D., Mahdjoubi L. (2004). Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22 (2), 171-182
-
(2004)
Construction Management and Economics
, vol.22
, Issue.2
, pp. 171-182
-
-
Heesom, D.1
Mahdjoubi, L.2
-
3
-
-
0033321993
-
Project planning in a virtual world: Information management metamorphosis or technology going too far?
-
Gardiner P. D., Ritchie J. M. (1999). Project planning in a virtual world: information management metamorphosis or technology going too far? International Journal of Information Management, 19, 485-494
-
(1999)
International Journal of Information Management
, vol.19
, pp. 485-494
-
-
Gardiner, P.D.1
Ritchie, J.M.2
-
4
-
-
0036462649
-
A design optimization tool based on a genetic algorithm
-
Caldas L. G., Norford L. K. (2002). A design optimization tool based on a genetic algorithm. Automation in Construction, 11, 173-184
-
(2002)
Automation in Construction
, vol.11
, pp. 173-184
-
-
Caldas, L.G.1
Norford, L.K.2
-
7
-
-
0002299336
-
Space planning method for multi-story building construction
-
Riley, D., Sanvido, V. (1997). Space Planning Method for Multi-story Building Construction. Journal Construction Engineering and Management, Vol. 123, No. 2, 171-180.
-
(1997)
Journal Construction Engineering and Management
, vol.123
, Issue.2
, pp. 171-180
-
-
Riley, D.1
Sanvido, V.2
-
8
-
-
2342430993
-
Identification and resolution of work space conflicts in building construction
-
July/August 2002
-
Guo, S. (2002). Identification and Resolution of Work Space Conflicts in Building Construction. Journal of Construction Engineering and Management, July/August 2002, 287-295.
-
(2002)
Journal of Construction Engineering and Management
, pp. 287-295
-
-
Guo, S.1
-
9
-
-
0033880829
-
Genetic search for solving construction site-level unequal-area facility layout problems
-
Li H., Love P. (2000). Genetic search for solving construction site-level unequal-area facility layout problems. Automation in Construction, 9, 217-226.
-
(2000)
Automation in Construction
, vol.9
, pp. 217-226
-
-
Li, H.1
Love, P.2
-
12
-
-
0036377817
-
The use of simple genetic algorithm in finding the critical factor of safety in slope stability analysis
-
McCombie, P., Wilkinson, P. (2002). The use of Simple Genetic Algorithm in Finding the Critical Factor of Safety in Slope Stability Analysis. Journal of Computers and Geotechnics 29 (8), 699-714.
-
(2002)
Journal of Computers and Geotechnics
, vol.29
, Issue.8
, pp. 699-714
-
-
McCombie, P.1
Wilkinson, P.2
-
13
-
-
33746369824
-
Registering space requirements of construction operations using site-PECASO model
-
Aarhus School of Architecture, Denmark
-
Mallasi, Z., Dawood. N. (2002). Registering Space Requirements of Construction Operations Using Site-PECASO Model. Proceedings of CIB w78 2002 Conference on Distributing Knowledge in Buildings, 2002, Aarhus School of Architecture, Denmark, Vol. 2, 83-90
-
(2002)
Proceedings of CIB w78 2002 Conference on Distributing Knowledge in Buildings, 2002
, vol.2
, pp. 83-90
-
-
Mallasi, Z.1
Dawood., N.2
-
14
-
-
1842842357
-
Emerging technologies in construction: Integrated information processes for 21st century
-
Colorado Advanced Software Institute
-
Songer, A. (1997). Emerging Technologies in Construction: Integrated Information Processes for 21st Century. Technical Report CASI-TR-98-05, Colorado Advanced Software Institute.
-
(1997)
Technical Report CASI-TR-98-05
-
-
Songer, A.1
-
15
-
-
0037827044
-
OSCONCAD: A model-based CAD system integrated with computer applications
-
Marir F., Aouad G., Cooper, G. (1998). OSCONCAD: A Model-based CAD System Integrated with Computer Applications. Electronic Journal of Information Technology in Construction, Vol. 3, 25-44.
-
(1998)
Electronic Journal of Information Technology in Construction
, vol.3
, pp. 25-44
-
-
Marir, F.1
Aouad, G.2
Cooper, G.3
-
17
-
-
0031633334
-
4D Annotator: A visual decision support tool for construction planners
-
Boston, October 18-21, Kelvin C.P. Wang (Ed.)
-
McKinney K., Fischer M., Kunz J. (1998). 4D Annotator: A Visual Decision Support Tool for Construction Planners. Journal of Computing in Civil Engineering, Proceedings of International Computing Congress, Boston, October 18-21, Kelvin C.P. Wang (Ed.), 330-341.
-
(1998)
Journal of Computing in Civil Engineering, Proceedings of International Computing Congress
, pp. 330-341
-
-
McKinney, K.1
Fischer, M.2
Kunz, J.3
-
18
-
-
0029183828
-
Extracting topological relationships from wire-frame CAD model
-
January 2002
-
Kunigahalli R., Russel J. S., Veeramani D. (2002). Extracting Topological Relationships from Wire-Frame CAD Model. Journal of Computing in Civil Engineering, January 2002, Vol. 9, 29-42
-
(2002)
Journal of Computing in Civil Engineering
, vol.9
, pp. 29-42
-
-
Kunigahalli, R.1
Russel, J.S.2
Veeramani, D.3
-
19
-
-
0033313625
-
Dynamic layout planning using a hybrid incremental solution method
-
November, 1999
-
Zouein P. P., Tommelein I. D. (1999). Dynamic Layout Planning using a Hybrid Incremental Solution Method. Journal of Construction Engineering and Management, Vol. 125, No. 6, November, 1999, 400-408.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 400-408
-
-
Zouein, P.P.1
Tommelein, I.D.2
-
20
-
-
0035501643
-
Schedule-dependant evolution of site layout planning
-
Elbaltagi E., Hejazy T., Hosny A., Eldosouky, A. (2001). Schedule-dependant Evolution of Site Layout Planning. Journal of Construction Management and Engineering, Vol. 19, pp 689-697.
-
(2001)
Journal of Construction Management and Engineering
, vol.19
, pp. 689-697
-
-
Elbaltagi, E.1
Hejazy, T.2
Hosny, A.3
Eldosouky, A.4
-
21
-
-
1442360913
-
Formalisation and automation of time-space conflict analysis
-
June 2000, Stanford University
-
Akinci B., Fischer M., Levvitt R., Carlson, R. (2000). Formalisation and Automation of Time-Space Conflict Analysis. CIFE Working Paper No. 59, June 2000, Stanford University.
-
(2000)
CIFE Working Paper No. 59
-
-
Akinci, B.1
Fischer, M.2
Levvitt, R.3
Carlson, R.4
-
22
-
-
0030825017
-
ScaRC: Space-constrained resource-constrained scheduling system
-
Thabet W. Y., Belivau Y. (1997). ScaRC: Space-Constrained Resource-Constrained scheduling system. Journal of Computing in Civil Engineering, Vol. 2, No. 1, pp 48-59.
-
(1997)
Journal of Computing in Civil Engineering
, vol.2
, Issue.1
, pp. 48-59
-
-
Thabet, W.Y.1
Belivau, Y.2
-
23
-
-
33746380930
-
Formalizing domain knowledge for construction zone generation
-
South Africa
-
Akbas R., Fischer M., Kunz J., Schwegler B. (2001). Formalizing Domain Knowledge for Construction Zone Generation. Proceedings of CIB w78 2001 Conference on Construction Information Technology, 2001, South Africa, Vol. 1 (30), 1-16.
-
(2001)
Proceedings of CIB w78 2001 Conference on Construction Information Technology, 2001
, vol.1
, Issue.30
, pp. 1-16
-
-
Akbas, R.1
Fischer M.Kunz, J.2
Schwegler, B.3
-
24
-
-
0033345520
-
Product-based model representation for integrating 3D CAD with computer simulation
-
ASCE, Arizona
-
Xu J., AbouRizk S. (1999). Product-based Model Representation for Integrating 3D CAD with Computer Simulation. Proceedings of the 1999 Winter Simulation Conference, ASCE, Arizona, 971-977.
-
(1999)
Proceedings of the 1999 Winter Simulation Conference
, pp. 971-977
-
-
Xu, J.1
AbouRizk, S.2
-
26
-
-
33746364173
-
Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation
-
DOI 10.1016/j.autcon.2005.08.005, PII S092658050500124X
-
Mallasi Z. (2006). Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualization. Automation in Construction, Vol. 15 (5), 640-655. (Pubitemid 44118734)
-
(2006)
Automation in Construction
, vol.15
, Issue.5
, pp. 640-655
-
-
Mallasi, Z.1
-
27
-
-
0035498588
-
A generic approach for nesting of 2-D Parts in 2-D sheets using genetic and heuristic algorithms
-
Babu, A. and Babu N. (2001). A Generic Approach for Nesting of 2-D Parts in 2-D Sheets using Genetic and Heuristic Algorithms. Journal of Computer-Aided Design, No. 33, 879-891.
-
(2001)
Journal of Computer-aided Design
, Issue.33
, pp. 879-891
-
-
Babu, A.1
Babu, N.2
-
28
-
-
0142094216
-
Genetic approach for automatic detection of form deviation of geometrical features for effective measurement strategy
-
Killmaier T., Babu, A. (2003). Genetic approach for Automatic Detection of form Deviation of Geometrical Features for Effective Measurement Strategy. Journal of Precision Engineering, No. 27, 370-381.
-
(2003)
Journal of Precision Engineering
, Issue.27
, pp. 370-381
-
-
Killmaier, T.1
Babu, A.2
-
31
-
-
0029408170
-
A computer-aided aircraft frame assembly planner
-
Liao T., Wu X., Zheng S., Li, S. (1995). A Computer-aided Aircraft Frame Assembly Planner. Journal of Computers in Industry, No. 27, 259-271.
-
(1995)
Journal of Computers in Industry
, Issue.27
, pp. 259-271
-
-
Liao, T.1
Wu, X.2
Zheng, S.3
Li, S.4
-
32
-
-
0036680644
-
An integrated approach for managing the cladding construction in high-rise buildings
-
Zhiliang M., Bin L., Wenjian, C. (2002). An Integrated Approach for Managing the Cladding Construction in High-rise Buildings. Journal of Automation in Construction, Vol. 11, 454-555.
-
(2002)
Journal of Automation in Construction
, vol.11
, pp. 454-555
-
-
Zhiliang, M.1
Bin, L.2
Wenjian, C.3
-
33
-
-
0000200835
-
Modelling with constraints: Theoretical foundation and application
-
Anderl R., Mendgen, R. (1995). Modelling with Constraints: Theoretical Foundation and Application. Journal of Computer Aided Design, Vol. 28, No. 3, 155-168.
-
(1995)
Journal of Computer Aided Design
, vol.28
, Issue.3
, pp. 155-168
-
-
Anderl, R.1
Mendgen, R.2
-
34
-
-
0141990673
-
A hybrid CAD-based construction site layout planning system using genetic algorithm
-
Osman H., Georgy M., Ibrahim, M. (2003). A Hybrid CAD-based Construction Site Layout Planning System using Genetic Algorithm. Journal of Automation in Construction, Vol. 12, 749-764.
-
(2003)
Journal of Automation in Construction
, vol.12
, pp. 749-764
-
-
Osman, H.1
Georgy, M.2
Ibrahim, M.3
-
36
-
-
2942724793
-
A generic inclusion of space strategies with activity execution patterns in 4D tools
-
Auckland, New Zealand
-
Mallasi Z., Dawood. N. (2003). A Generic Inclusion of Space Strategies with Activity Execution Patterns in 4D tools. Proceedings of CIB w78 2003, Auckland, New Zealand, 46-56.
-
(2003)
Proceedings of CIB w78 2003
, pp. 46-56
-
-
Mallasi, Z.1
Dawood., N.2
-
37
-
-
0032625627
-
A Neuro-fuzzy computational approach to constructability knowledge acquisition for construction technology evaluation
-
Yu W. D., Skibniewski M. J. (1999). A Neuro-fuzzy Computational Approach to Constructability Knowledge Acquisition for Construction Technology Evaluation. Journal for Automation in Construction, Vol.8 539-552.
-
(1999)
Journal for Automation in Construction
, vol.8
, pp. 539-552
-
-
Yu, W.D.1
Skibniewski, M.J.2
|