메뉴 건너뛰기




Volumn 2, Issue , 2005, Pages 1037-1051

From monitoring to learning: A conceptual framework

Author keywords

Monitoring; Organizational learning

Indexed keywords

CONCEPTUAL FRAMEWORKS; FUTURE RESEARCH DIRECTIONS; HOLISTIC MANNER; LEARNING OPPORTUNITY; ORGANIZATIONAL LEARNING; PROJECT MONITORING; SUSTAINABLE IMPROVEMENT; SYSTEMATIC FRAMEWORK;

EID: 84861078228     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (9)

References (72)
  • 1
    • 0000282511 scopus 로고
    • Double-loop learning in organisations
    • Sept.-Oct.
    • Argyris C. (1977) Double-loop learning in organisations, Harvard Business Review, Sept.-Oct., 115-125.
    • (1977) Harvard Business Review , pp. 115-125
    • Argyris, C.1
  • 2
    • 0037293998 scopus 로고    scopus 로고
    • Monitoring systems and their effectiveness for project cost control in construction
    • Al-JiBouri S.H. (2003) Monitoring systems and their effectiveness for project cost control in construction. International Journal of Project Management, 21(3), 145-154.
    • (2003) International Journal of Project Management , vol.21 , Issue.3 , pp. 145-154
    • Al-JiBouri, S.H.1
  • 3
    • 0037402597 scopus 로고    scopus 로고
    • Modelling global risk factors affecting construction cost performance
    • Baloi D. and Price A.D.F. (2003) Modelling global risk factors affecting construction cost performance. International Journal of Project Management, 21(4), 261-267.
    • (2003) International Journal of Project Management , vol.21 , Issue.4 , pp. 261-267
    • Baloi, D.1    Price, A.D.F.2
  • 6
    • 1142304556 scopus 로고    scopus 로고
    • Understanding supply chain management: Critical research and a theoretical framework
    • Chen I.J. and Paulraj A. (2004), Understanding supply chain management: critical research and a theoretical framework. International Journal of Production Research, 42(1), 131-163.
    • (2004) International Journal of Production Research , vol.42 , Issue.1 , pp. 131-163
    • Chen, I.J.1    Paulraj, A.2
  • 7
    • 1642587217 scopus 로고    scopus 로고
    • PPMS: A web-based construction project performance monitoring system
    • Cheung S.O., Suen C.H.H. and Cheung K.W.K. (2004) PPMS: a web-based construction project performance monitoring system. Automation in Construction, 13(3), 361-376.
    • (2004) Automation in Construction , vol.13 , Issue.3 , pp. 361-376
    • Cheung, S.O.1    Suen, C.H.H.2    Cheung, K.W.K.3
  • 9
    • 0004230037 scopus 로고    scopus 로고
    • Construction Industry Review Committee of Hong Kong (CIRC) Construction Industry Review Committee, Hong Kong
    • Construction Industry Review Committee of Hong Kong (CIRC) (2001) Construct for excellence, Construction Industry Review Committee, Hong Kong.
    • (2001) Construct for Excellence
  • 10
    • 0038721042 scopus 로고    scopus 로고
    • Project monitoring and evaluation: A method for enhancing the efficiency and effectiveness of aid project implementation
    • Crawford P. and Bryne P. (2003) Project monitoring and evaluation: a method for enhancing the efficiency and effectiveness of aid project implementation. International Journal of Project Management, 21(5), 363-373.
    • (2003) International Journal of Project Management , vol.21 , Issue.5 , pp. 363-373
    • Crawford, P.1    Bryne, P.2
  • 12
    • 0001923109 scopus 로고
    • Planning as learning
    • DeGenus A. (1988) Planning as learning, Harvard Business Review, 66(3), 70-74.
    • (1988) Harvard Business Review , vol.66 , Issue.3 , pp. 70-74
    • DeGenus, A.1
  • 14
    • 0002430774 scopus 로고
    • Organizational learning: Implication for organization design
    • Duncan R. and Weiss A. (1979) Organizational learning: implication for organization design. Research in Organizational Behaviour, 1, 75-123.
    • (1979) Research in Organizational Behaviour , vol.1 , pp. 75-123
    • Duncan, R.1    Weiss, A.2
  • 17
    • 0141895127 scopus 로고    scopus 로고
    • Project review and leaning in construction industry: Embedding a problem structuring method within a partnership context
    • Franco L.A., Cushman M. and Rosenhead J. (2004) Project review and leaning in construction industry: Embedding a problem structuring method within a partnership context. European Journal of Operational Research, 152 (6), 586-601.
    • (2004) European Journal of Operational Research , vol.152 , Issue.6 , pp. 586-601
    • Franco, L.A.1    Cushman, M.2    Rosenhead, J.3
  • 18
    • 9144238845 scopus 로고    scopus 로고
    • The effect of experience on contractors' competitiveness in recurrent bidding
    • Fu W.K., Drew D.S. and Lo H.P. (2002) The effect of experience on contractors' competitiveness in recurrent bidding. Construction Management and Economics, 20 (8), 655-666.
    • (2002) Construction Management and Economics , vol.20 , Issue.8 , pp. 655-666
    • Fu, W.K.1    Drew, D.S.2    Lo, H.P.3
  • 20
    • 0001770477 scopus 로고
    • How organization learn and unlearn
    • Nystrom P. and Starbuck W. (eds.) Oxford Press
    • Hedberg B. (1981) How organization learn and unlearn, In: Nystrom P. and Starbuck W. (eds.), Handbook of Organisational Design, Oxford Press, 3-27.
    • (1981) Handbook of Organisational Design , pp. 3-27
    • Hedberg, B.1
  • 21
    • 84856649012 scopus 로고    scopus 로고
    • Learning how tolearn lean construction concepts and principles
    • University of California, Berkeley, CA, USA
    • Hirota E.H., Lantelme E.M.V. and Formoso C.T. (1999) Learning how tolearn lean construction concepts and principles. In: Proceedings of IGlC-7, University of California, Berkeley, CA, USA, 411-422.
    • (1999) Proceedings of IGlC-7 , pp. 411-422
    • Hirota, E.H.1    Lantelme, E.M.V.2    Formoso, C.T.3
  • 24
    • 84936824011 scopus 로고
    • Organizational learning: The contributing process and literature
    • Huber G. (1991) Organizational learning: the contributing process and literature. Organizational Science, 2 (2), 88-115.
    • (1991) Organizational Science , vol.2 , Issue.2 , pp. 88-115
    • Huber, G.1
  • 25
    • 0011866111 scopus 로고    scopus 로고
    • Strategic change and organizational learning in two swedish construction firms
    • Huemer L. and Ostergren K. (2000) Strategic change and organizational learning in two Swedish construction firms. Construction Management and Economics, 18(6), 635-642.
    • (2000) Construction Management and Economics , vol.18 , Issue.6 , pp. 635-642
    • Huemer, L.1    Ostergren, K.2
  • 27
    • 84986146085 scopus 로고    scopus 로고
    • Cognition, culture and competition: An empirical test of the learning organization
    • Jashapara A. (2003) Cognition, culture and competition: an empirical test of the learning organization. The Learning Organization, 10(1), 31-50.
    • (2003) The Learning Organization , vol.10 , Issue.1 , pp. 31-50
    • Jashapara, A.1
  • 29
    • 0032206692 scopus 로고    scopus 로고
    • Business failure: Liabilities and newness, adolescence, and smallness
    • Kale S. and Arditi D. (1998) Business failure: liabilities and newness, adolescence, and smallness. Journal of Construction Engineering and Management, 122 (6), 458-464.
    • (1998) Journal of Construction Engineering and Management , vol.122 , Issue.6 , pp. 458-464
    • Kale, S.1    Arditi, D.2
  • 30
    • 0029747295 scopus 로고    scopus 로고
    • Making effective use of construction lessons learned in project life cycle
    • Kartam N.A. (1996) Making effective use of construction lessons learned in project life cycle. Journal of Construction Engineering and Management, 122 (1), 14-21.
    • (1996) Journal of Construction Engineering and Management , vol.122 , Issue.1 , pp. 14-21
    • Kartam, N.A.1
  • 31
    • 0002018796 scopus 로고    scopus 로고
    • A learning framework for project management
    • Kotnour T. (1999) A learning framework for project management. Project Management Journal, 30(2), 32-36.
    • (1999) Project Management Journal , vol.30 , Issue.2 , pp. 32-36
    • Kotnour, T.1
  • 35
    • 0004178374 scopus 로고
    • Department of Environment, HMSO, U.K
    • Latham M. (1994) Constructing the team, Department of Environment, HMSO, U.K.
    • (1994) Constructing the Team
    • Latham, M.1
  • 36
    • 1542466350 scopus 로고    scopus 로고
    • Critical aspects of organizational learning research and proposals for its measurement
    • Lahteenmaki S., Toivonen J. and Mattlia M. (2001) Critical aspects of organizational learning research and proposals for its measurement. British Journal of Management, 12(2), 113-129.
    • (2001) British Journal of Management , vol.12 , Issue.2 , pp. 113-129
    • Lahteenmaki, S.1    Toivonen, J.2    Mattlia, M.3
  • 39
    • 0037401231 scopus 로고    scopus 로고
    • Effect of particle size distribution of fly ash-cement system on the fluidity of cement pastes
    • Lee S.H., Kim H.J., Sakai E. and Daimon M. (2003) Effect of particle size distribution of fly ash-cement system on the fluidity of cement pastes. Cement and Concrete Research, 33(5), 763-768
    • (2003) Cement and Concrete Research , vol.33 , Issue.5 , pp. 763-768
    • Lee, S.H.1    Kim, H.J.2    Sakai, E.3    Daimon, M.4
  • 40
    • 0038484978 scopus 로고    scopus 로고
    • Total quality management and the learning organization: A dialogue for change in construction
    • Love P.E.D., Li H., Irani Z. and Faniran (2000) Total quality management and the learning organization: a dialogue for change in construction. Construction Management and Economics, 18(3), 321-331.
    • (2000) Construction Management and Economics , vol.18 , Issue.3 , pp. 321-331
    • Love, P.E.D.1    Li, H.2    Irani, Z.3    Faniran4
  • 41
    • 2542461920 scopus 로고    scopus 로고
    • Learning to reduce rework in projects: Analysis of firms' organizational learning and quality practices
    • Love P.E.D., Irani Z. and Edwards D.J. (2003) Learning to reduce rework in projects: analysis of firms' organizational learning and quality practices. Project Management Journal, 34(3), 13-25.
    • (2003) Project Management Journal , vol.34 , Issue.3 , pp. 13-25
    • Love, P.E.D.1    Irani, Z.2    Edwards, D.J.3
  • 42
    • 84993065105 scopus 로고    scopus 로고
    • Nurturing a learning organization in construction: A focus on strategic shift, organizational transformation, customer orientation and quality centred learning
    • Love P.E.D., Huang J.C., Edwards D.J. and Irani Z. (2004) Nurturing a learning organization in construction: a focus on strategic shift, organizational transformation, customer orientation and quality centred learning. Construction Innovation, 4, 113-126.
    • (2004) Construction Innovation , vol.4 , pp. 113-126
    • Love, P.E.D.1    Huang, J.C.2    Edwards, D.J.3    Irani, Z.4
  • 50
    • 84986018709 scopus 로고    scopus 로고
    • From continuous improvement to organizational learning: Developmental theory
    • Murray P. and Chapman R. (2003) From continuous improvement to organizational learning: developmental theory. The learning organization, 10(5), 272-282.
    • (2003) The Learning Organization , vol.10 , Issue.5 , pp. 272-282
    • Murray, P.1    Chapman, R.2
  • 51
    • 0034244772 scopus 로고    scopus 로고
    • A individual based descripton of learning within an organization
    • Nemhard D. and Uzumeri M. (2000) A individual based descripton of learning within an organization. IEEE Transactions on Engineering Management, 47(3), 370-378.
    • (2000) IEEE Transactions on Engineering Management , vol.47 , Issue.3 , pp. 370-378
    • Nemhard, D.1    Uzumeri, M.2
  • 53
    • 77953887984 scopus 로고    scopus 로고
    • Efficacy-information for implementing learning in construction
    • 2004
    • Nesan L.J. (2004) Efficacy-information for implementing learning in construction. The Learning Organization, 11(1), 2004.
    • (2004) The Learning Organization , vol.11 , Issue.1
    • Nesan, L.J.1
  • 57
    • 2142765733 scopus 로고    scopus 로고
    • A theoretical model for optimum project (time) performance based on European best practice
    • Proverbs D.G. and Holt G.D. (2000) A theoretical model for optimum project (time) performance based on European best practice. Construction Management and Economics, 18(6), 657-665.
    • (2000) Construction Management and Economics , vol.18 , Issue.6 , pp. 657-665
    • Proverbs, D.G.1    Holt, G.D.2
  • 58
    • 0036779022 scopus 로고    scopus 로고
    • Doing things right and doings the right things- Time and timing in projects
    • Ramo H. (2002) Doing things right and doings the right things- Time and timing in projects. International Journal of Project Management, 20(6), 569-574.
    • (2002) International Journal of Project Management , vol.20 , Issue.6 , pp. 569-574
    • Ramo, H.1
  • 59
    • 84993081819 scopus 로고    scopus 로고
    • Utilizing the balanced scorecard for IT/IS performance evaluation in construction
    • Rodney A.S. and Mohammed S. (2001) Utilizing the balanced scorecard for IT/IS performance evaluation in construction. Construction innovation, 1(2), 147-163.
    • (2001) Construction Innovation , vol.1 , Issue.2 , pp. 147-163
    • Rodney, A.S.1    Mohammed, S.2
  • 60
    • 84986077144 scopus 로고    scopus 로고
    • Effectiveness of push and pull learning strategies in construction management
    • Santos A. and Powell J.A. (2001) Effectiveness of push and pull learning strategies in construction management. Journal of Workplace Learning, 13(2), 47-56.
    • (2001) Journal of Workplace Learning , vol.13 , Issue.2 , pp. 47-56
    • Santos, A.1    Powell, J.A.2
  • 61
    • 0037375524 scopus 로고    scopus 로고
    • Harvesting project knowledge: A review of project learning methods and success factors
    • Schindler M. and Eppler M.J. (2003) Harvesting project knowledge: a review of project learning methods and success factors. International Journal of Project Management, 21 (3), 219-228.
    • (2003) International Journal of Project Management , vol.21 , Issue.3 , pp. 219-228
    • Schindler, M.1    Eppler, M.J.2
  • 63
    • 84867796870 scopus 로고    scopus 로고
    • Achieving quality construction projects based on harmonious working relationships: Clients' and architects' perceptions of contractor performance
    • Soetanto R., Proverbs D.D. and Holt G.D. (2001) Achieving quality construction projects based on harmonious working relationships: Clients' and architects' perceptions of contractor performance. The International Journal of Quality & Reliability Management, 18(4-5), 528-548.
    • (2001) The International Journal of Quality & Reliability Management , vol.18 , Issue.4-5 , pp. 528-548
    • Soetanto, R.1    Proverbs, D.D.2    Holt, G.D.3
  • 64
    • 0030381949 scopus 로고    scopus 로고
    • Workflow technology-based monitoring and control for business process and project management
    • Shih H.M. and Tseng M.M. (1996) Workflow technology-based monitoring and control for business process and project management. International Journal of Project Management, 14(6), 373-378.
    • (1996) International Journal of Project Management , vol.14 , Issue.6 , pp. 373-378
    • Shih, H.M.1    Tseng, M.M.2
  • 66
    • 0002372299 scopus 로고    scopus 로고
    • Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration
    • Tommelein I.D. and Ballard G. (eds.) Berkeley, Calif.
    • Tommelein I.D. and Li A.E.Y. (1999) Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration. In Tommelein I.D. and Ballard G. (eds.) Proceedings of the 7th Annual Conference of International Group of Lean Construction, Berkeley, Calif., 97-108.
    • (1999) Proceedings of the 7th Annual Conference of International Group of Lean Construction , pp. 97-108
    • Tommelein, I.D.1    Li, A.E.Y.2
  • 68
    • 13944275602 scopus 로고    scopus 로고
    • Contractor performance prediction model for the united Kingdom construction contractor: Study of logistic regression approach
    • Wong C.H. (2004) Contractor performance prediction model for the United Kingdom construction contractor: study of logistic regression approach, Journal of Construction Engineering and Management, 130(5), 691-698.
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.5 , pp. 691-698
    • Wong, C.H.1
  • 69
    • 0032180274 scopus 로고    scopus 로고
    • A population of learners: A new way to measure organizational learning
    • Uzumeri M. and Nemhard D. (1998) A population of learners: A new way to measure organizational learning, Journal of Operations Management, 16(5), 515-528.
    • (1998) Journal of Operations Management , vol.16 , Issue.5 , pp. 515-528
    • Uzumeri, M.1    Nemhard, D.2
  • 70
    • 3242729247 scopus 로고    scopus 로고
    • Factors influencing contractor performance: An international investigation
    • Xiao H. and Proverbs D. (2003) Factors influencing contractor performance: an international investigation. Engineering, Construction, Architectural Management, 10(5), 322-332.
    • (2003) Engineering, Construction, Architectural Management , vol.10 , Issue.5 , pp. 322-332
    • Xiao, H.1    Proverbs, D.2
  • 71
    • 0000946293 scopus 로고    scopus 로고
    • Least squares fitting of nonlinear data in the undergraduate laboratory
    • Zielinski T.J. and Allendoerfer R.D. (1997) Least squares fitting of nonlinear data in the undergraduate laboratory, Journal of Chemical Education. 74(8), 1001-1007
    • (1997) Journal of Chemical Education , vol.74 , Issue.8 , pp. 1001-1007
    • Zielinski, T.J.1    Allendoerfer, R.D.2
  • 72
    • 0032073186 scopus 로고    scopus 로고
    • An integrated project management system
    • Zipf P.J. (1998) An integrated project management system. Journal of Management in Engineering, 14(1), 38-41.
    • (1998) Journal of Management in Engineering , vol.14 , Issue.1 , pp. 38-41
    • Zipf, P.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.