메뉴 건너뛰기




Volumn 21, Issue 2, 2003, Pages 145-154

Monitoring systems and their effectiveness for project cost control in construction

Author keywords

Construction; Cost control; Monitoring systems; Progress; Simulation

Indexed keywords

COMPUTER SIMULATION; COST EFFECTIVENESS; MONITORING; PARAMETER ESTIMATION; PERFORMANCE; VARIATIONAL TECHNIQUES;

EID: 0037293998     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0263-7863(02)00010-8     Document Type: Article
Times cited : (80)

References (13)
  • 6
    • 0347654870 scopus 로고
    • London: The OR Society and The Institute of Cost and Management Accountants
    • Staffurth C. Project cost control using networks. London: The OR Society and The Institute of Cost and Management Accountants, 1975.
    • (1975) Project Cost Control Using Networks
    • Staffurth, C.1
  • 10
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • Kolisch R. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operation Research 1996;90:320-33.
    • (1996) European Journal of Operation Research , vol.90 , pp. 320-333
    • Kolisch, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.