메뉴 건너뛰기




Volumn 130, Issue 5, 2004, Pages 691-698

Contractor performance prediction model for the United Kingdom construction contractor: Study of logistic regression approach

Author keywords

Construction industry; Contractors; Logistics; Predictions; Regression models; United Kingdom

Indexed keywords

CIVIL ENGINEERING; CONSTRUCTION INDUSTRY; CONTRACTS; DECISION MAKING; DECISION SUPPORT SYSTEMS; LOGISTICS; MATHEMATICAL MODELS; NEURAL NETWORKS; PERFORMANCE; PROBABILITY; PROJECT MANAGEMENT; REGRESSION ANALYSIS; SURVEYS;

EID: 13944275602     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:5(691)     Document Type: Article
Times cited : (90)

References (60)
  • 1
    • 0005891455 scopus 로고
    • A methodology for predicting company failure in the construction industry
    • Abidali, A. F., and Harris, F. C. (1995). "A methodology for predicting company failure in the construction industry." Constr. Manage. Econom., 13(3), 189-196.
    • (1995) Constr. Manage. Econom. , vol.13 , Issue.3 , pp. 189-196
    • Abidali, A.F.1    Harris, F.C.2
  • 2
    • 0037941781 scopus 로고    scopus 로고
    • A needs-based methodology for classifying construction clients and selecting contractors
    • Chinyio, E. A., Olomolaiye, P. O., Kometa, S. T., and Harris, F. C. (1998). "A needs-based methodology for classifying construction clients and selecting contractors." Constr. Manage. Econom., 16(1), 91-98.
    • (1998) Constr. Manage. Econom. , vol.16 , Issue.1 , pp. 91-98
    • Chinyio, E.A.1    Olomolaiye, P.O.2    Kometa, S.T.3    Harris, F.C.4
  • 6
    • 2342418973 scopus 로고    scopus 로고
    • CIRIA, London
    • Construction Industry Research and Information Association, (CIRIA). (1998). Selecting contractors by value, CIRIA, London.
    • (1998) Selecting Contractors by Value
  • 7
    • 0020721803 scopus 로고
    • Cost-plus contractor selection: Analytical method
    • Diekman., J. E. (1983). "Cost-plus contractor selection: analytical method." Eng. Costs Production Econom., 7, 147-158.
    • (1983) Eng. Costs Production Econom. , vol.7 , pp. 147-158
    • Diekman, J.E.1
  • 8
    • 3242693759 scopus 로고
    • DPI-Disputes potential index: A study into the predictability of contract disputes
    • Construction Industry Institute Publication, Univ. of Texas at Austin, Austin, Tex
    • Diekmann, J. E., Girard, M. J., and Abdul-Hadi, N. (1994). "DPI-Disputes potential index: A study into the predictability of contract disputes." Source documents-101. Construction Industry Institute Publication, Univ. of Texas at Austin, Austin, Tex.
    • (1994) Source Documents-101.
    • Diekmann, J.E.1    Girard, M.J.2    Abdul-Hadi, N.3
  • 10
    • 0019533729 scopus 로고
    • Evaluation of bids for construction contracts using discounted cash flow techniques
    • Hardy, S. C., Norman, A., and Perry, J. G. (1981). "Evaluation of bids for construction contracts using discounted cash flow techniques." Proc. Inst. Civ. Eng., Transp., 1(7), 91-111.
    • (1981) Proc. Inst. Civ. Eng., Transp. , vol.1 , Issue.7 , pp. 91-111
    • Hardy, S.C.1    Norman, A.2    Perry, J.G.3
  • 11
    • 11644266449 scopus 로고
    • Innovation contracting practice-the new way to undertake public works projects
    • Winter
    • Harp, D. W. (1990). "Innovation contracting practice-the new way to undertake public works projects." Hot Mix Asphalt Tech., Winter.
    • (1990) Hot Mix Asphalt Tech.
    • Harp, D.W.1
  • 13
    • 0000771440 scopus 로고    scopus 로고
    • Assessment and evaluation of contractor data against client goals using PERT approach
    • Hatush Z., and Skitmore, M. (1997a). "Assessment and evaluation of contractor data against client goals using PERT approach." Constr. Manage. Econom., 15(4), 327-340.
    • (1997) Constr. Manage. Econom. , vol.15 , Issue.4 , pp. 327-340
    • Hatush, Z.1    Skitmore, M.2
  • 14
    • 0002576968 scopus 로고    scopus 로고
    • Criteria for contractor selection
    • Hatush, Z., and Skitmore, M. (1997b). "Criteria for contractor selection." Constr. Manage. Econom., 15(1), 19-38.
    • (1997) Constr. Manage. Econom. , vol.15 , Issue.1 , pp. 19-38
    • Hatush, Z.1    Skitmore, M.2
  • 15
    • 0017416667 scopus 로고
    • The evaluation of contractor management during source selection
    • Dept. of Economics, Geography and Management, USAF Academy, Colo
    • Helmer, T. F., and Taylor, R. L. (1977). "The evaluation of contractor management during source selection." Proc., A.I.I.E. Spring Annual Conf., Dept. of Economics, Geography and Management, USAF Academy, Colo.
    • (1977) Proc., A.I.I.E. Spring Annual Conf.
    • Helmer, T.F.1    Taylor, R.L.2
  • 16
    • 0026838162 scopus 로고
    • Multiparameter bidding system-innovation in contract administration
    • Herbsman, Z., and Ellis, R. (1992). "Multiparameter bidding system-innovation in contract administration." J. Constr. Eng. Manage., 118(1), 142-150.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.1 , pp. 142-150
    • Herbsman, Z.1    Ellis, R.2
  • 18
    • 0032098746 scopus 로고    scopus 로고
    • Which contractor selection methodology?
    • Holt, G. D. (1998). "Which contractor selection methodology?." Int. J. Proj. Manage., 16(3), 153-164.
    • (1998) Int. J. Proj. Manage. , vol.16 , Issue.3 , pp. 153-164
    • Holt, G.D.1
  • 19
    • 0038734398 scopus 로고
    • Applying multi-attribute analysis to contractor selection decisions
    • Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1994b). "Applying multi-attribute analysis to contractor selection decisions." Eur. J. Purchasing Supply Manage., 1(3), 139-148.
    • (1994) Eur. J. Purchasing Supply Manage. , vol.1 , Issue.3 , pp. 139-148
    • Holt, G.D.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 20
    • 0038618183 scopus 로고
    • Factors influencing UK construction clients choice of contractor
    • Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1994a). "Factors influencing UK construction clients choice of contractor." Build. Environ., 29(2), 241-248.
    • (1994) Build. Environ. , vol.29 , Issue.2 , pp. 241-248
    • Holt, G.D.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 21
    • 0013229112 scopus 로고
    • A review of contractor selection practices in the UK construction industry
    • Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1995). "A review of contractor selection practices in the UK construction industry." Build. Environ., 30(4), 533-561.
    • (1995) Build. Environ. , vol.30 , Issue.4 , pp. 533-561
    • Holt, G.D.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 24
    • 1342337557 scopus 로고    scopus 로고
    • Prequalification and multi-criteria selection - A measure of contractor's opinions
    • Jennings, E., and Holt, G. D. (1998). "Prequalification and multi-criteria selection - A measure of contractor's opinions." Constr. Manage. Econom., 16, 651-660.
    • (1998) Constr. Manage. Econom. , vol.16 , pp. 651-660
    • Jennings, E.1    Holt, G.D.2
  • 25
    • 0023416693 scopus 로고
    • A fuzzy system for bid proposal evaluation using microcomputer
    • Juang, C., Burati, J., and Kalidindi, S. (1987). "A fuzzy system for bid proposal evaluation using microcomputer." Civ. Eng. Sys., 4(3), 124-130.
    • (1987) Civ. Eng. Sys. , vol.4 , Issue.3 , pp. 124-130
    • Juang, C.1    Burati, J.2    Kalidindi, S.3
  • 27
    • 0030147931 scopus 로고    scopus 로고
    • Contractor evaluation and selection: A Hong Kong perspective
    • Kumaraswamy, M. M. (1996). "Contractor evaluation and selection: a Hong Kong perspective." Build. Environ., 31(3), 273-282.
    • (1996) Build. Environ. , vol.31 , Issue.3 , pp. 273-282
    • Kumaraswamy, M.M.1
  • 28
    • 84993014082 scopus 로고    scopus 로고
    • Decision support system for contractor prequalification-artificial neural network model
    • Lam, K. C., Ng, S. T., Hu, T., Skitmore, M., and Cheung, O. (2000). "Decision support system for contractor prequalification-artificial neural network model." Eng., Constr., Archit. Manage., 7(3), 251-266.
    • (2000) Eng., Constr., Archit. Manage. , vol.7 , Issue.3 , pp. 251-266
    • Lam, K.C.1    Ng, S.T.2    Hu, T.3    Skitmore, M.4    Cheung, O.5
  • 33
    • 0025385269 scopus 로고
    • Bid evaluation for UK public sector construction contracts
    • Merna, A., and Smith, N. J. (1990). "Bid evaluation for UK public sector construction contracts." Prog. Water Technol., 1(88), 91-105.
    • (1990) Prog. Water Technol. , vol.1 , Issue.88 , pp. 91-105
    • Merna, A.1    Smith, N.J.2
  • 34
    • 0022076106 scopus 로고
    • Selecting a contractor for fast track projects Part-1: Principles of contractor evaluation
    • Moore, M. J. (1985a)."Selecting a contractor for fast track projects Part-1: principles of contractor evaluation." Plant Eng., 39(12), 74-55.
    • (1985) Plant Eng. , vol.39 , Issue.12 , pp. 74-155
    • Moore, M.J.1
  • 35
    • 0022129458 scopus 로고
    • Selecting a contractor for fast track projects Part-2: Quantitative evaluation method
    • Moore, M. J. (1985b)."Selecting a contractor for fast track projects Part-2: quantitative evaluation method." Plant Eng., 39(18), 54-56.
    • (1985) Plant Eng. , vol.39 , Issue.18 , pp. 54-56
    • Moore, M.J.1
  • 37
    • 13944250411 scopus 로고
    • Integration of geographic information systems and logistic multiple regression for aquatic macrophyte modelling
    • Baltimore, (Jan. 2003)
    • Narumalani, S., Jensen, J. R., Althausen, J. D., Burkhalter, S., and Mackey, H. E. (1994). "Integration of geographic information systems and logistic multiple regression for aquatic macrophyte modelling." Proc., ACSM/ASPRS Annual Convention & Exposition, Vol. 1, Baltimore, 484-493, 〈http://spatialodyssey.ursus.maine.edu/gisweb/spatdb/acsm/ac94055. html〉 (Jan. 2003).
    • (1994) Proc., ACSM/ASPRS Annual Convention & Exposition , vol.1 , pp. 484-493
    • Narumalani, S.1    Jensen, J.R.2    Althausen, J.D.3    Burkhalter, S.4    Mackey, H.E.5
  • 38
    • 0039157790 scopus 로고
    • CP. DSS; Decision support system for contractor prequalification
    • Ng, T. S., Skitmore, R. M. (1995). "CP. DSS; Decision support system for contractor prequalification." Civ. Eng. Sys. 12(12), 133-159.
    • (1995) Civ. Eng. Sys. , vol.12 , Issue.12 , pp. 133-159
    • Ng, T.S.1    Skitmore, R.M.2
  • 39
    • 84993077873 scopus 로고    scopus 로고
    • Decision-makers' perceptions in the formulation of prequalification criteria
    • Ng, T. S., Skitmore, R. M., and Smith, N. J. (1999). "Decision- makers' perceptions in the formulation of prequalification criteria." Eng., Constr., Archit. Manage., 6(2), 155-165.
    • (1999) Eng., Constr., Archit. Manage. , vol.6 , Issue.2 , pp. 155-165
    • Ng, T.S.1    Skitmore, R.M.2    Smith, N.J.3
  • 40
    • 0022128664 scopus 로고
    • Tender evaluation by fuzzy sets
    • Nguyen, V. U. (1985). "Tender evaluation by fuzzy sets." J. Constr. Eng. Manage., 111(3), 231-243.
    • (1985) J. Constr. Eng. Manage. , vol.111 , Issue.3 , pp. 231-243
    • Nguyen, V.U.1
  • 42
    • 84993069603 scopus 로고    scopus 로고
    • Benchmarking contractor selection practices in public-sector construction- A proposed model
    • Palaneeswaran, E., and Kumaraswamy, M. M. (2000). "Benchmarking contractor selection practices in public-sector construction- a proposed model." Eng., Constr., Archit. Manage., 7(3), 285-299.
    • (2000) Eng., Constr., Archit. Manage. , vol.7 , Issue.3 , pp. 285-299
    • Palaneeswaran, E.1    Kumaraswamy, M.M.2
  • 43
    • 0028400942 scopus 로고
    • Design/build prequalification systems
    • Potter, K. J., and Sanvido, V. (1994). "Design/build prequalification systems." J. Manage. Eng., 10(2), 48-56.
    • (1994) J. Manage. Eng. , vol.10 , Issue.2 , pp. 48-56
    • Potter, K.J.1    Sanvido, V.2
  • 44
    • 13944260983 scopus 로고    scopus 로고
    • The effect of competitive tendering on value in construction
    • London
    • Royal Institution of Chartered Surveyors (RICS. (1997). "The effect of competitive tendering on value in construction." The Royal Institution of Chartered Surveyors Research Paper Series 2(5), London.
    • (1997) The Royal Institution of Chartered Surveyors Research Paper Series , vol.2 , Issue.5
  • 45
    • 0025200163 scopus 로고
    • Model for owner prequalification of contractors
    • Russell, J. S. (1990). "Model for owner prequalification of contractors." J. Manage. Eng., 6(1), 59-75.
    • (1990) J. Manage. Eng. , vol.6 , Issue.1 , pp. 59-75
    • Russell, J.S.1
  • 47
    • 0026918024 scopus 로고
    • Quantitative study of contractor evaluation programs and their impact
    • Russell, J. S., and Jaselskis, E. J. (1992a). "Quantitative study of contractor evaluation programs and their impact." J. Constr. Eng. Manage., 118(3), 612-624.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.3 , pp. 612-624
    • Russell, J.S.1    Jaselskis, E.J.2
  • 48
    • 0025220842 scopus 로고
    • Qualifier-1: Contractor prequalification model
    • Russell, J., and Skibniewski, M. J. (1990a). "Qualifier-1: Contractor prequalification model." J. Comput. Civ. Eng., 4(1), 77-90.
    • (1990) J. Comput. Civ. Eng. , vol.4 , Issue.1 , pp. 77-90
    • Russell, J.1    Skibniewski, M.J.2
  • 49
    • 0025398528 scopus 로고
    • Qualifier-2: Knowledge-based system for contractor prequalification
    • Russell, J., and Skibniewski, M. J. (1990b). "Qualifier-2: knowledge-based system for contractor prequalification." J. Constr. Eng. Manage., 116(1), 157-171.
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.1 , pp. 157-171
    • Russell, J.1    Skibniewski, M.J.2
  • 51
    • 84993053319 scopus 로고    scopus 로고
    • Addressing the contractor selection problem using an evident reasoning approach
    • Sonmaz, M., Yang, J. B., and Holt, G. D. (2001). "Addressing the contractor selection problem using an evident reasoning approach." Eng., Constr., Archit. Manage., 8(3), 198-210.
    • (2001) Eng., Constr., Archit. Manage. , vol.8 , Issue.3 , pp. 198-210
    • Sonmaz, M.1    Yang, J.B.2    Holt, G.D.3
  • 52
    • 84992943400 scopus 로고    scopus 로고
    • Model for assessing building contractors' project performance
    • Tam, C. M., and Harris, F. C. (1996). "Model for assessing building contractors' project performance." Eng., Constr., Archit. Manage., 3(3), 187-203.
    • (1996) Eng., Constr., Archit. Manage. , vol.3 , Issue.3 , pp. 187-203
    • Tam, C.M.1    Harris, F.C.2
  • 53
    • 0021783926 scopus 로고
    • Channel scouring potential using logistic analysis
    • Tung, Y. K. (1985). "Channel scouring potential using logistic analysis." J. Hydraul. Eng., 111(2), 194-205.
    • (1985) J. Hydraul. Eng. , vol.111 , Issue.2 , pp. 194-205
    • Tung, Y.K.1
  • 55
    • 0344031908 scopus 로고    scopus 로고
    • Lowest price or value? Investigation of UK construction clients' tender selection process
    • Wong, C. H., Holt, G. D., and Cooper, A. C (2000a). "Lowest price or value? Investigation of UK construction clients' tender selection process." Constr. Manage. Econom., 18(7), 767-774.
    • (2000) Constr. Manage. Econom. , vol.18 , Issue.7 , pp. 767-774
    • Wong, C.H.1    Holt, G.D.2    Cooper, A.C.3
  • 57
    • 13944263732 scopus 로고    scopus 로고
    • Contractor prequalification: Have Latham's recommendations had an impact? Construction Building Research
    • Univ. of Greenwich, Greenwich, UK
    • Wong, C. H., Holt, G. D., and Harris, P. T. (2000b). "Contractor prequalification: have Latham's recommendations had an impact? Construction Building Research." Proc., COBRA 2000 Conf., Univ. of Greenwich, Greenwich, UK, 379-389.
    • (2000) Proc., COBRA 2000 Conf. , pp. 379-389
    • Wong, C.H.1    Holt, G.D.2    Harris, P.T.3
  • 58
    • 84993033383 scopus 로고    scopus 로고
    • Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences
    • Wong, C. H., Holt, G. D., and Harris, P. T. (2001). "Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences." Eng., Constr., Archit. Manage., 8(4), 257-271.
    • (2001) Eng., Constr., Archit. Manage. , vol.8 , Issue.4 , pp. 257-271
    • Wong, C.H.1    Holt, G.D.2    Harris, P.T.3
  • 59
    • 0039331798 scopus 로고    scopus 로고
    • Multiple attribute design evaluation of complex engineering products using the evidential reasoning
    • Yang, J. B., and Sen, P. (1997). "Multiple attribute design evaluation of complex engineering products using the evidential reasoning." J. Eng. Design 8(3), 211-230.
    • (1997) J. Eng. Design , vol.8 , Issue.3 , pp. 211-230
    • Yang, J.B.1    Sen, P.2
  • 60
    • 0028198009 scopus 로고
    • An evident reasoning approach for multiple attribute decision making with uncertainty
    • Yang, J. B., and Singh, M. G. (1994). "An evident reasoning approach for multiple attribute decision making with uncertainty." IEEE Trans. Syst. Man Cybern., 24, 1-18.
    • (1994) IEEE Trans. Syst. Man Cybern. , vol.24 , pp. 1-18
    • Yang, J.B.1    Singh, M.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.