-
1
-
-
0005891455
-
A methodology for predicting company failure in the construction industry
-
Abidali, A. F., and Harris, F. C. (1995). "A methodology for predicting company failure in the construction industry." Constr. Manage. Econom., 13(3), 189-196.
-
(1995)
Constr. Manage. Econom.
, vol.13
, Issue.3
, pp. 189-196
-
-
Abidali, A.F.1
Harris, F.C.2
-
2
-
-
0037941781
-
A needs-based methodology for classifying construction clients and selecting contractors
-
Chinyio, E. A., Olomolaiye, P. O., Kometa, S. T., and Harris, F. C. (1998). "A needs-based methodology for classifying construction clients and selecting contractors." Constr. Manage. Econom., 16(1), 91-98.
-
(1998)
Constr. Manage. Econom.
, vol.16
, Issue.1
, pp. 91-98
-
-
Chinyio, E.A.1
Olomolaiye, P.O.2
Kometa, S.T.3
Harris, F.C.4
-
6
-
-
2342418973
-
-
CIRIA, London
-
Construction Industry Research and Information Association, (CIRIA). (1998). Selecting contractors by value, CIRIA, London.
-
(1998)
Selecting Contractors by Value
-
-
-
7
-
-
0020721803
-
Cost-plus contractor selection: Analytical method
-
Diekman., J. E. (1983). "Cost-plus contractor selection: analytical method." Eng. Costs Production Econom., 7, 147-158.
-
(1983)
Eng. Costs Production Econom.
, vol.7
, pp. 147-158
-
-
Diekman, J.E.1
-
8
-
-
3242693759
-
DPI-Disputes potential index: A study into the predictability of contract disputes
-
Construction Industry Institute Publication, Univ. of Texas at Austin, Austin, Tex
-
Diekmann, J. E., Girard, M. J., and Abdul-Hadi, N. (1994). "DPI-Disputes potential index: A study into the predictability of contract disputes." Source documents-101. Construction Industry Institute Publication, Univ. of Texas at Austin, Austin, Tex.
-
(1994)
Source Documents-101.
-
-
Diekmann, J.E.1
Girard, M.J.2
Abdul-Hadi, N.3
-
10
-
-
0019533729
-
Evaluation of bids for construction contracts using discounted cash flow techniques
-
Hardy, S. C., Norman, A., and Perry, J. G. (1981). "Evaluation of bids for construction contracts using discounted cash flow techniques." Proc. Inst. Civ. Eng., Transp., 1(7), 91-111.
-
(1981)
Proc. Inst. Civ. Eng., Transp.
, vol.1
, Issue.7
, pp. 91-111
-
-
Hardy, S.C.1
Norman, A.2
Perry, J.G.3
-
11
-
-
11644266449
-
Innovation contracting practice-the new way to undertake public works projects
-
Winter
-
Harp, D. W. (1990). "Innovation contracting practice-the new way to undertake public works projects." Hot Mix Asphalt Tech., Winter.
-
(1990)
Hot Mix Asphalt Tech.
-
-
Harp, D.W.1
-
13
-
-
0000771440
-
Assessment and evaluation of contractor data against client goals using PERT approach
-
Hatush Z., and Skitmore, M. (1997a). "Assessment and evaluation of contractor data against client goals using PERT approach." Constr. Manage. Econom., 15(4), 327-340.
-
(1997)
Constr. Manage. Econom.
, vol.15
, Issue.4
, pp. 327-340
-
-
Hatush, Z.1
Skitmore, M.2
-
14
-
-
0002576968
-
Criteria for contractor selection
-
Hatush, Z., and Skitmore, M. (1997b). "Criteria for contractor selection." Constr. Manage. Econom., 15(1), 19-38.
-
(1997)
Constr. Manage. Econom.
, vol.15
, Issue.1
, pp. 19-38
-
-
Hatush, Z.1
Skitmore, M.2
-
15
-
-
0017416667
-
The evaluation of contractor management during source selection
-
Dept. of Economics, Geography and Management, USAF Academy, Colo
-
Helmer, T. F., and Taylor, R. L. (1977). "The evaluation of contractor management during source selection." Proc., A.I.I.E. Spring Annual Conf., Dept. of Economics, Geography and Management, USAF Academy, Colo.
-
(1977)
Proc., A.I.I.E. Spring Annual Conf.
-
-
Helmer, T.F.1
Taylor, R.L.2
-
16
-
-
0026838162
-
Multiparameter bidding system-innovation in contract administration
-
Herbsman, Z., and Ellis, R. (1992). "Multiparameter bidding system-innovation in contract administration." J. Constr. Eng. Manage., 118(1), 142-150.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.1
, pp. 142-150
-
-
Herbsman, Z.1
Ellis, R.2
-
18
-
-
0032098746
-
Which contractor selection methodology?
-
Holt, G. D. (1998). "Which contractor selection methodology?." Int. J. Proj. Manage., 16(3), 153-164.
-
(1998)
Int. J. Proj. Manage.
, vol.16
, Issue.3
, pp. 153-164
-
-
Holt, G.D.1
-
19
-
-
0038734398
-
Applying multi-attribute analysis to contractor selection decisions
-
Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1994b). "Applying multi-attribute analysis to contractor selection decisions." Eur. J. Purchasing Supply Manage., 1(3), 139-148.
-
(1994)
Eur. J. Purchasing Supply Manage.
, vol.1
, Issue.3
, pp. 139-148
-
-
Holt, G.D.1
Olomolaiye, P.O.2
Harris, F.C.3
-
20
-
-
0038618183
-
Factors influencing UK construction clients choice of contractor
-
Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1994a). "Factors influencing UK construction clients choice of contractor." Build. Environ., 29(2), 241-248.
-
(1994)
Build. Environ.
, vol.29
, Issue.2
, pp. 241-248
-
-
Holt, G.D.1
Olomolaiye, P.O.2
Harris, F.C.3
-
21
-
-
0013229112
-
A review of contractor selection practices in the UK construction industry
-
Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1995). "A review of contractor selection practices in the UK construction industry." Build. Environ., 30(4), 533-561.
-
(1995)
Build. Environ.
, vol.30
, Issue.4
, pp. 533-561
-
-
Holt, G.D.1
Olomolaiye, P.O.2
Harris, F.C.3
-
23
-
-
0041448014
-
Contract award practices
-
Hunt, H. W., Logan, D. H., Corbetta, R. H., Crimmins, A. H., Bayard, R. P., Love, H. E., and Bogen, S. A. (1966). "Contract award practices." J. Constr. Div., Am. Soc. Civ. Eng., 92(1), 1-16.
-
(1966)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.92
, Issue.1
, pp. 1-16
-
-
Hunt, H.W.1
Logan, D.H.2
Corbetta, R.H.3
Crimmins, A.H.4
Bayard, R.P.5
Love, H.E.6
Bogen, S.A.7
-
24
-
-
1342337557
-
Prequalification and multi-criteria selection - A measure of contractor's opinions
-
Jennings, E., and Holt, G. D. (1998). "Prequalification and multi-criteria selection - A measure of contractor's opinions." Constr. Manage. Econom., 16, 651-660.
-
(1998)
Constr. Manage. Econom.
, vol.16
, pp. 651-660
-
-
Jennings, E.1
Holt, G.D.2
-
25
-
-
0023416693
-
A fuzzy system for bid proposal evaluation using microcomputer
-
Juang, C., Burati, J., and Kalidindi, S. (1987). "A fuzzy system for bid proposal evaluation using microcomputer." Civ. Eng. Sys., 4(3), 124-130.
-
(1987)
Civ. Eng. Sys.
, vol.4
, Issue.3
, pp. 124-130
-
-
Juang, C.1
Burati, J.2
Kalidindi, S.3
-
27
-
-
0030147931
-
Contractor evaluation and selection: A Hong Kong perspective
-
Kumaraswamy, M. M. (1996). "Contractor evaluation and selection: a Hong Kong perspective." Build. Environ., 31(3), 273-282.
-
(1996)
Build. Environ.
, vol.31
, Issue.3
, pp. 273-282
-
-
Kumaraswamy, M.M.1
-
28
-
-
84993014082
-
Decision support system for contractor prequalification-artificial neural network model
-
Lam, K. C., Ng, S. T., Hu, T., Skitmore, M., and Cheung, O. (2000). "Decision support system for contractor prequalification-artificial neural network model." Eng., Constr., Archit. Manage., 7(3), 251-266.
-
(2000)
Eng., Constr., Archit. Manage.
, vol.7
, Issue.3
, pp. 251-266
-
-
Lam, K.C.1
Ng, S.T.2
Hu, T.3
Skitmore, M.4
Cheung, O.5
-
33
-
-
0025385269
-
Bid evaluation for UK public sector construction contracts
-
Merna, A., and Smith, N. J. (1990). "Bid evaluation for UK public sector construction contracts." Prog. Water Technol., 1(88), 91-105.
-
(1990)
Prog. Water Technol.
, vol.1
, Issue.88
, pp. 91-105
-
-
Merna, A.1
Smith, N.J.2
-
34
-
-
0022076106
-
Selecting a contractor for fast track projects Part-1: Principles of contractor evaluation
-
Moore, M. J. (1985a)."Selecting a contractor for fast track projects Part-1: principles of contractor evaluation." Plant Eng., 39(12), 74-55.
-
(1985)
Plant Eng.
, vol.39
, Issue.12
, pp. 74-155
-
-
Moore, M.J.1
-
35
-
-
0022129458
-
Selecting a contractor for fast track projects Part-2: Quantitative evaluation method
-
Moore, M. J. (1985b)."Selecting a contractor for fast track projects Part-2: quantitative evaluation method." Plant Eng., 39(18), 54-56.
-
(1985)
Plant Eng.
, vol.39
, Issue.18
, pp. 54-56
-
-
Moore, M.J.1
-
36
-
-
0041950878
-
Analysis of bids using multiattribute utility theory
-
Sydney, Australia
-
Moselhi, O., and Martinelli, A. (1990). "Analysis of bids using multiattribute utility theory." Proc. Int. Symp. on Building Economics and Construction Management, Sydney, Australia, 335-345.
-
(1990)
Proc. Int. Symp. on Building Economics and Construction Management
, pp. 335-345
-
-
Moselhi, O.1
Martinelli, A.2
-
37
-
-
13944250411
-
Integration of geographic information systems and logistic multiple regression for aquatic macrophyte modelling
-
Baltimore, (Jan. 2003)
-
Narumalani, S., Jensen, J. R., Althausen, J. D., Burkhalter, S., and Mackey, H. E. (1994). "Integration of geographic information systems and logistic multiple regression for aquatic macrophyte modelling." Proc., ACSM/ASPRS Annual Convention & Exposition, Vol. 1, Baltimore, 484-493, 〈http://spatialodyssey.ursus.maine.edu/gisweb/spatdb/acsm/ac94055. html〉 (Jan. 2003).
-
(1994)
Proc., ACSM/ASPRS Annual Convention & Exposition
, vol.1
, pp. 484-493
-
-
Narumalani, S.1
Jensen, J.R.2
Althausen, J.D.3
Burkhalter, S.4
Mackey, H.E.5
-
38
-
-
0039157790
-
CP. DSS; Decision support system for contractor prequalification
-
Ng, T. S., Skitmore, R. M. (1995). "CP. DSS; Decision support system for contractor prequalification." Civ. Eng. Sys. 12(12), 133-159.
-
(1995)
Civ. Eng. Sys.
, vol.12
, Issue.12
, pp. 133-159
-
-
Ng, T.S.1
Skitmore, R.M.2
-
39
-
-
84993077873
-
Decision-makers' perceptions in the formulation of prequalification criteria
-
Ng, T. S., Skitmore, R. M., and Smith, N. J. (1999). "Decision- makers' perceptions in the formulation of prequalification criteria." Eng., Constr., Archit. Manage., 6(2), 155-165.
-
(1999)
Eng., Constr., Archit. Manage.
, vol.6
, Issue.2
, pp. 155-165
-
-
Ng, T.S.1
Skitmore, R.M.2
Smith, N.J.3
-
40
-
-
0022128664
-
Tender evaluation by fuzzy sets
-
Nguyen, V. U. (1985). "Tender evaluation by fuzzy sets." J. Constr. Eng. Manage., 111(3), 231-243.
-
(1985)
J. Constr. Eng. Manage.
, vol.111
, Issue.3
, pp. 231-243
-
-
Nguyen, V.U.1
-
42
-
-
84993069603
-
Benchmarking contractor selection practices in public-sector construction- A proposed model
-
Palaneeswaran, E., and Kumaraswamy, M. M. (2000). "Benchmarking contractor selection practices in public-sector construction- a proposed model." Eng., Constr., Archit. Manage., 7(3), 285-299.
-
(2000)
Eng., Constr., Archit. Manage.
, vol.7
, Issue.3
, pp. 285-299
-
-
Palaneeswaran, E.1
Kumaraswamy, M.M.2
-
43
-
-
0028400942
-
Design/build prequalification systems
-
Potter, K. J., and Sanvido, V. (1994). "Design/build prequalification systems." J. Manage. Eng., 10(2), 48-56.
-
(1994)
J. Manage. Eng.
, vol.10
, Issue.2
, pp. 48-56
-
-
Potter, K.J.1
Sanvido, V.2
-
44
-
-
13944260983
-
The effect of competitive tendering on value in construction
-
London
-
Royal Institution of Chartered Surveyors (RICS. (1997). "The effect of competitive tendering on value in construction." The Royal Institution of Chartered Surveyors Research Paper Series 2(5), London.
-
(1997)
The Royal Institution of Chartered Surveyors Research Paper Series
, vol.2
, Issue.5
-
-
-
45
-
-
0025200163
-
Model for owner prequalification of contractors
-
Russell, J. S. (1990). "Model for owner prequalification of contractors." J. Manage. Eng., 6(1), 59-75.
-
(1990)
J. Manage. Eng.
, vol.6
, Issue.1
, pp. 59-75
-
-
Russell, J.S.1
-
46
-
-
0038279070
-
Contractor prequalification data for construction owners
-
Russell, J. S., Hancher, D. E., and Skibniewski, M. J. (1992). "Contractor prequalification data for construction owners." Constr. Manage. Econom., 10, 117-135.
-
(1992)
Constr. Manage. Econom.
, vol.10
, pp. 117-135
-
-
Russell, J.S.1
Hancher, D.E.2
Skibniewski, M.J.3
-
47
-
-
0026918024
-
Quantitative study of contractor evaluation programs and their impact
-
Russell, J. S., and Jaselskis, E. J. (1992a). "Quantitative study of contractor evaluation programs and their impact." J. Constr. Eng. Manage., 118(3), 612-624.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.3
, pp. 612-624
-
-
Russell, J.S.1
Jaselskis, E.J.2
-
48
-
-
0025220842
-
Qualifier-1: Contractor prequalification model
-
Russell, J., and Skibniewski, M. J. (1990a). "Qualifier-1: Contractor prequalification model." J. Comput. Civ. Eng., 4(1), 77-90.
-
(1990)
J. Comput. Civ. Eng.
, vol.4
, Issue.1
, pp. 77-90
-
-
Russell, J.1
Skibniewski, M.J.2
-
49
-
-
0025398528
-
Qualifier-2: Knowledge-based system for contractor prequalification
-
Russell, J., and Skibniewski, M. J. (1990b). "Qualifier-2: knowledge-based system for contractor prequalification." J. Constr. Eng. Manage., 116(1), 157-171.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.1
, pp. 157-171
-
-
Russell, J.1
Skibniewski, M.J.2
-
51
-
-
84993053319
-
Addressing the contractor selection problem using an evident reasoning approach
-
Sonmaz, M., Yang, J. B., and Holt, G. D. (2001). "Addressing the contractor selection problem using an evident reasoning approach." Eng., Constr., Archit. Manage., 8(3), 198-210.
-
(2001)
Eng., Constr., Archit. Manage.
, vol.8
, Issue.3
, pp. 198-210
-
-
Sonmaz, M.1
Yang, J.B.2
Holt, G.D.3
-
52
-
-
84992943400
-
Model for assessing building contractors' project performance
-
Tam, C. M., and Harris, F. C. (1996). "Model for assessing building contractors' project performance." Eng., Constr., Archit. Manage., 3(3), 187-203.
-
(1996)
Eng., Constr., Archit. Manage.
, vol.3
, Issue.3
, pp. 187-203
-
-
Tam, C.M.1
Harris, F.C.2
-
53
-
-
0021783926
-
Channel scouring potential using logistic analysis
-
Tung, Y. K. (1985). "Channel scouring potential using logistic analysis." J. Hydraul. Eng., 111(2), 194-205.
-
(1985)
J. Hydraul. Eng.
, vol.111
, Issue.2
, pp. 194-205
-
-
Tung, Y.K.1
-
54
-
-
13944262648
-
Contractor classification: Multidiscriminant analysis of UK contractor selection
-
Salford Univ., Salford, UK
-
Wong, C. H., and Holt, G. D. (2001). "Contractor classification: Multidiscriminant analysis of UK contractor selection." Proc., 1st Inter. Postgraduate Research Conf. in the Built and Human Environment, Salford Univ., Salford, UK.
-
(2001)
Proc., 1st Inter. Postgraduate Research Conf. in the Built and Human Environment
-
-
Wong, C.H.1
Holt, G.D.2
-
55
-
-
0344031908
-
Lowest price or value? Investigation of UK construction clients' tender selection process
-
Wong, C. H., Holt, G. D., and Cooper, A. C (2000a). "Lowest price or value? Investigation of UK construction clients' tender selection process." Constr. Manage. Econom., 18(7), 767-774.
-
(2000)
Constr. Manage. Econom.
, vol.18
, Issue.7
, pp. 767-774
-
-
Wong, C.H.1
Holt, G.D.2
Cooper, A.C.3
-
56
-
-
0346617605
-
UK construction clients' opinions in the contractor selection process
-
Liverpool, John Moores Univ., Liverpool, UK
-
Wong, C. H., Holt, G. D., and Harris, P. T. (1999). "UK construction clients' opinions in the contractor selection process." Proc., 15th Annual Conf. of Association of Researchers in Construction Management-ARCOM, Vol. 2, Liverpool, John Moores Univ., Liverpool, UK, 695-703.
-
(1999)
Proc., 15th Annual Conf. of Association of Researchers in Construction Management-ARCOM
, vol.2
, pp. 695-703
-
-
Wong, C.H.1
Holt, G.D.2
Harris, P.T.3
-
57
-
-
13944263732
-
Contractor prequalification: Have Latham's recommendations had an impact? Construction Building Research
-
Univ. of Greenwich, Greenwich, UK
-
Wong, C. H., Holt, G. D., and Harris, P. T. (2000b). "Contractor prequalification: have Latham's recommendations had an impact? Construction Building Research." Proc., COBRA 2000 Conf., Univ. of Greenwich, Greenwich, UK, 379-389.
-
(2000)
Proc., COBRA 2000 Conf.
, pp. 379-389
-
-
Wong, C.H.1
Holt, G.D.2
Harris, P.T.3
-
58
-
-
84993033383
-
Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences
-
Wong, C. H., Holt, G. D., and Harris, P. T. (2001). "Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences." Eng., Constr., Archit. Manage., 8(4), 257-271.
-
(2001)
Eng., Constr., Archit. Manage.
, vol.8
, Issue.4
, pp. 257-271
-
-
Wong, C.H.1
Holt, G.D.2
Harris, P.T.3
-
59
-
-
0039331798
-
Multiple attribute design evaluation of complex engineering products using the evidential reasoning
-
Yang, J. B., and Sen, P. (1997). "Multiple attribute design evaluation of complex engineering products using the evidential reasoning." J. Eng. Design 8(3), 211-230.
-
(1997)
J. Eng. Design
, vol.8
, Issue.3
, pp. 211-230
-
-
Yang, J.B.1
Sen, P.2
-
60
-
-
0028198009
-
An evident reasoning approach for multiple attribute decision making with uncertainty
-
Yang, J. B., and Singh, M. G. (1994). "An evident reasoning approach for multiple attribute decision making with uncertainty." IEEE Trans. Syst. Man Cybern., 24, 1-18.
-
(1994)
IEEE Trans. Syst. Man Cybern.
, vol.24
, pp. 1-18
-
-
Yang, J.B.1
Singh, M.G.2
|