-
1
-
-
0038485692
-
Web-enabled project management: An emerging paradigm in construction
-
Alshawi, M. and Ingirige, B. "Web-enabled project management: an emerging paradigm in construction". Automation in Construction, 12, pp. 349-364 (2003).
-
(2003)
Automation in Construction
, vol.12
, pp. 349-364
-
-
Alshawi, M.1
Ingirige, B.2
-
2
-
-
26444453871
-
A cooperative Internet-facilitated quality management environment for construction
-
Lam, K.C and Ng, ST. "A cooperative Internet-facilitated quality management environment for construction", Automation in Construction, 15, pp. 1-11(2006).
-
(2006)
Automation in Construction
, vol.15
, pp. 1-11
-
-
Lam, K.C.1
Ng, S.T.2
-
3
-
-
44649122863
-
An examination of ISO 9000: 2000 and supply chain quality assurance
-
Sroufe, R. and Curkovic, S. "An examination of ISO 9000: 2000 and supply chain quality assurance". Journal of Operations Management, 26, pp. 503-520 (2008).
-
(2008)
Journal of Operations Management
, vol.26
, pp. 503-520
-
-
Sroufe, R.1
Curkovic, S.2
-
4
-
-
26444553129
-
Performance of engineering consultants in ISO 9000-based quality management systems implementation
-
Ng, ST. "Performance of engineering consultants in ISO 9000-based quality management systems implementation", Engineering, Construction and Architectural Management, 12(6), pp. 519-532 (2005).
-
(2005)
Engineering, Construction and Architectural Management
, vol.12
, Issue.6
, pp. 519-532
-
-
Ng, S.T.1
-
5
-
-
0034882406
-
Improving maintenance and reducing building defects through ISO 9000
-
Pheng, LS. and Wee, W. "Improving maintenance and reducing building defects through ISO 9000", Journal of Quality in Maintenance Engineering, 7(1), pp. 6-24 (2001).
-
(2001)
Journal of Quality in Maintenance Engineering
, vol.7
, Issue.1
, pp. 6-24
-
-
Pheng, L.S.1
Wee, W.2
-
6
-
-
77951132850
-
Performance measurement in supply chains: New network analysis and entropie indexes
-
Allesina, S., Azzi, A., Battini, D. and Regattieri, A "Performance measurement in supply chains: new network analysis and entropie indexes", International Journal of Production Research, 48(8), pp. 2297-2321 (2010).
-
(2010)
International Journal of Production Research
, vol.48
, Issue.8
, pp. 2297-2321
-
-
Allesina, S.1
Azzi, A.2
Battini, D.3
Regattieri, A.4
-
7
-
-
74149084640
-
An exploratory study of the relation between supply chain topological features and supply chain performance
-
Pero, M., Rossi, T, Noe, C and Sianesi, A. "An exploratory study of the relation between supply chain topological features and supply chain performance", International Journal of Production Economics, 123, pp. 266-278 (2010).
-
(2010)
International Journal of Production Economics
, vol.123
, pp. 266-278
-
-
Pero, M.1
Rossi, T.2
Noe, C.3
Sianesi, A.4
-
8
-
-
70349210181
-
Understanding the relationships between time and cost to improve supply chain performance
-
Whicker, L, Bernon, M., Templar, S. and Mena, C "Understanding the relationships between time and cost to improve supply chain performance", International Journal of Production Economics, 121. pp. 641-650 (2009).
-
(2009)
International Journal of Production Economics
, vol.121
, pp. 641-650
-
-
Whicker, L.1
Bernon, M.2
Templar, S.3
Mena, C.4
-
9
-
-
67349269480
-
An investigation on the direct and indirect effect of supply chain integration on firm performance
-
Kim, S.W. "An investigation on the direct and indirect effect of supply chain integration on firm performance", International Journal of Production Economics, 119, pp. 328-346 (2009).
-
(2009)
International Journal of Production Economics
, vol.119
, pp. 328-346
-
-
Kim, S.W.1
-
10
-
-
68749112655
-
The effects of innovation-cost strategy, knowledge, and action in the supply chain on firm performance
-
Craighead, CW., Huit, G.T.M. and Ketchen Jr., DJ. "The effects of innovation-cost strategy, knowledge, and action in the supply chain on firm performance", Journal of Operations Management, 27, pp. 405-421 (2009).
-
(2009)
Journal of Operations Management
, vol.27
, pp. 405-421
-
-
Craighead, C.W.1
Huit, G.T.M.2
Ketchen Jr., D.J.3
-
11
-
-
44649134650
-
Strategic supply management, quality initiatives, and organizational performance
-
Yeung, ACL "Strategic supply management, quality initiatives, and organizational performance". Journal of Operations Management, 26, pp. 490-502 (2008).
-
(2008)
Journal of Operations Management
, vol.26
, pp. 490-502
-
-
Yeung, A.C.L.1
-
12
-
-
55349094633
-
Performance evaluation of SCM in JFT environment
-
Kojima, M., Nakashima, K. and Ohno, K. "Performance evaluation of SCM in JFT environment", International Journal of Production Economics, 115, pp. 439-443 (2008).
-
(2008)
International Journal of Production Economics
, vol.115
, pp. 439-443
-
-
Kojima, M.1
Nakashima, K.2
Ohno, K.3
-
13
-
-
40249108473
-
Performance measurement in strategic buyer-supplier relationships - The mediating role of socialization mechanisms
-
Cousins, P.D., Lawson, B. and Squire, B. "Performance measurement in strategic buyer-supplier relationships-the mediating role of socialization mechanisms". International Journal of Operations and Production Manage-ment, 28(3), pp. 238-258 (2008).
-
(2008)
International Journal of Operations and Production Manage-ment
, vol.28
, Issue.3
, pp. 238-258
-
-
Cousins, P.D.1
Lawson, B.2
Squire, B.3
-
14
-
-
35348981378
-
Information technology and performance management for build-to-order supply chains
-
Sharif, AM., Irani, Z. and Lloyd, D. "Information technology and performance management for build-to-order supply chains", International Journal of Operations and Production Management, 27(11), pp. 1235-1253 (2007).
-
(2007)
International Journal of Operations and Production Management
, vol.27
, Issue.11
, pp. 1235-1253
-
-
Sharif, A.M.1
Irani, Z.2
Lloyd, D.3
-
15
-
-
33947100437
-
Communication methods, information sharing, supplier development and performance-an empirical study of their relationships
-
Carr, A.S. and Kaynak, H. "Communication methods, information sharing, supplier development and performance-an empirical study of their relationships", International Journal of Operations and Production Management, 27(4), pp. 346-370 (2007).
-
(2007)
International Journal of Operations and Production Management
, vol.27
, Issue.4
, pp. 346-370
-
-
Carr, A.S.1
Kaynak, H.2
-
16
-
-
33947128605
-
Supply chain performance measurement system using DEA modeling
-
Wong, W.P. and Wong, K.Y. "Supply chain performance measurement system using DEA modeling", Industrial Management + Data Systems, 107(3), pp. 361-381 (2007).
-
(2007)
Industrial Management + Data Systems
, vol.107
, Issue.3
, pp. 361-381
-
-
Wong, W.P.1
Wong, K.Y.2
-
17
-
-
79951667720
-
A corporate supply optimizer with flow network
-
Sepehri, M., Fayazbakhsh, K. and Ghasemzadeh, F. "A corporate supply optimizer with flow network", Srientia lranica, Transactions E: Industrial Engineering, 17(1), pp. 70-83 (2010).
-
(2010)
Srientia Lranica, Transactions E: Industrial Engineering
, vol.17
, Issue.1
, pp. 70-83
-
-
Sepehri, M.1
Fayazbakhsh, K.2
Ghasemzadeh, F.3
-
18
-
-
79951655872
-
Investigation of the impact of supply chain in-tegration on product innovation and quality
-
Hosseini Baharanchi, S.R. "Investigation of the impact of supply chain in-tegration on product innovation and quality", Srientia lranica. Transactions E: Industrial Engineering. 16(1), pp. 81-89 (2009).
-
(2009)
Srientia Lranica. Transactions E: Industrial Engineering.
, vol.16
, Issue.1
, pp. 81-89
-
-
Hosseini Baharanchi, S.R.1
-
19
-
-
55349131326
-
A fuzzy intelligent information agent architecture for supply chains
-
Fazel Zarandi, M.H., Turksen, LB., Moattar Hoseini, S.M., Bastani, S. and Mohebi, A "A fuzzy intelligent information agent architecture for supply chains", Srientia lranica, 15(5), pp. 623-636 (2008).
-
(2008)
Srientia Lranica
, vol.15
, Issue.5
, pp. 623-636
-
-
Fazel Zarandi, M.H.1
Turksen, L.B.2
Moattar Hoseini, S.M.3
Bastani, S.4
Mohebi, A.5
-
20
-
-
68149099641
-
Profile-based circumstances for productivity measurement
-
Phusavat, K., Anussornnitisatn, P., Sujitwanit, S. and Kess, P. "Profile-based circumstances for productivity measurement", Industrial Management + Data Systems. 109(6), pp. 825-839 (2009).
-
(2009)
Industrial Management + Data Systems.
, vol.109
, Issue.6
, pp. 825-839
-
-
Phusavat, K.1
Anussornnitisatn, P.2
Sujitwanit, S.3
Kess, P.4
-
21
-
-
57149140596
-
What affects organizational performance? The linking of learning and knowledge management
-
Ho, LA. "What affects organizational performance? The linking of learning and knowledge management", Industrial Management + Data Systems, 108(9), pp. 1234-1254 (2008).
-
(2008)
Industrial Management + Data Systems
, vol.108
, Issue.9
, pp. 1234-1254
-
-
Ho, L.A.1
-
22
-
-
34548433828
-
The mediate effect of learning and knowledge on organizational performance
-
Lin, CY. and Kuo, TH. "The mediate effect of learning and knowledge on organizational performance", Industrial Management + Data Systems, 107(7), pp. 1066-1083 (2007).
-
(2007)
Industrial Management + Data Systems
, vol.107
, Issue.7
, pp. 1066-1083
-
-
Lin, C.Y.1
Kuo, T.H.2
-
23
-
-
33645023376
-
A performance measurement system using a profit-linked multi-factor measurement model
-
Rao, M.P. "A performance measurement system using a profit-linked multi-factor measurement model", Industrial Management + Data Systems, 106(3), pp. 362-379 (2006).
-
(2006)
Industrial Management + Data Systems
, vol.106
, Issue.3
, pp. 362-379
-
-
Rao, M.P.1
-
24
-
-
1542443710
-
Strategic performance evaluation: Descriptive and prescriptive analysis
-
Saad, CH. "Strategic performance evaluation: descriptive and prescriptive analysis", Industrial Management + Data Systems, 101(8), pp. 390-399 (2001).
-
(2001)
Industrial Management + Data Systems
, vol.101
, Issue.8
, pp. 390-399
-
-
Saad, C.H.1
-
25
-
-
0032606290
-
A case study assessment of performance measurement in distribution centers
-
Kuo, CH., Dunn, K.D. and Rand ha wa, S.U. "A case study assessment of performance measurement in distribution centers", Industrial Management + Data Systems, 99(2), pp. 54-63 (1999).
-
(1999)
Industrial Management + Data Systems
, vol.99
, Issue.2
, pp. 54-63
-
-
Kuo, C.H.1
Dunn, K.D.2
Rand Ha Wa, S.U.3
-
26
-
-
67649135978
-
Correlation between structural performance levels and damage indexes in steel frames subjected to earthquakes
-
Arjomandi, K., Estekanchi, H. and Vafai, A "Correlation between structural performance levels and damage indexes in steel frames subjected to earthquakes", Srientia lranica, Transactions A: Civil Engineering, 16(2), pp. 147-155 (2009).
-
(2009)
Srientia Lranica, Transactions A: Civil Engineering
, vol.16
, Issue.2
, pp. 147-155
-
-
Arjomandi, K.1
Estekanchi, H.2
Vafai, A.3
-
27
-
-
79951664855
-
A hybrid electromagnetismlike algorithm for supplier selection in make-to-order planning
-
Mirabi, M., Fatemi Ghomi, S.M.T.andJolai, F. "A hybrid electromagnetismlike algorithm for supplier selection in make-to-order planning", Scientia lranica, Transactions E: Industrial Engineering, 17(1), pp. 1-11 (2010).
-
(2010)
Scientia Lranica, Transactions E: Industrial Engineering
, vol.17
, Issue.1
, pp. 1-11
-
-
Mirabi, M.1
Fatemi Ghomi, S.M.T.2
Jolai, F.3
-
28
-
-
76249102527
-
Two-pillat risk management (TRPM): A generic project risk management process
-
Seyedhoseini, S.M. and Hatefi, MA. 'Two-pillat risk management (TRPM): a generic project risk management process", Scientia lranica, Transactions E: Industrial Engineering. 16(2), pp. 138-148 (2009).
-
(2009)
Scientia Lranica, Transactions E: Industrial Engineering.
, vol.16
, Issue.2
, pp. 138-148
-
-
Seyedhoseini, S.M.1
Hatefi, M.A.2
-
29
-
-
47949129521
-
Quality function deployment, value engineering and target costing, an integrated framework in design cost management: A mathematical programming approach
-
Jariri, F. and Zegordi, S.H. "Quality function deployment, value engineering and target costing, an integrated framework in design cost management: a mathematical programming approach", Srientia lranica, 15(3), pp. 405-411 (2008).
-
(2008)
Srientia Lranica
, vol.15
, Issue.3
, pp. 405-411
-
-
Jariri, F.1
Zegordi, S.H.2
-
30
-
-
33947214045
-
Project completion time in dynamic PERT networks with generating projects
-
Azaron, A. and Modarres, M. "Project completion time in dynamic PERT networks with generating projects", Srientia lranica, 14(1), pp. 56-63 (2007).
-
(2007)
Srientia Lranica
, vol.14
, Issue.1
, pp. 56-63
-
-
Azaron, A.1
Modarres, M.2
-
31
-
-
44649104563
-
Towards an understanding of supply chain quality management
-
Foster Jr., ST. "Towards an understanding of supply chain quality management ", Journal of Operations Management, 26, pp. 461-467 (2008).
-
(2008)
Journal of Operations Management
, vol.26
, pp. 461-467
-
-
Foster Jr., S.T.1
-
32
-
-
0347269132
-
A process-based quality management information system
-
Chin, S., Kim, K. and Kim, Y. "A process-based quality management information system", Automation in Construction, 13, pp. 241-259 (2004).
-
(2004)
Automation in Construction
, vol.13
, pp. 241-259
-
-
Chin, S.1
Kim, K.2
Kim, Y.3
-
33
-
-
29744447736
-
ISO 9000 in construction: An examination of its application in Turkey
-
Turk, AM. "ISO 9000 in construction: an examination of its application in Turkey", Building and Environment, 41(4), pp. 501-511 (2006).
-
(2006)
Building and Environment
, vol.41
, Issue.4
, pp. 501-511
-
-
Turk, A.M.1
-
34
-
-
0000569541
-
ISO 9000 standards: Perceptions and experiences in the UK construction industry
-
Motazed-Keyvani, R., Ghanbari-Parsa, AR. and Kagaya, S. "ISO 9000 standards: perceptions and experiences in the UK construction industry", Construction Management and Economics, 17,pp. 107-119(1999).
-
(1999)
Construction Management and Economics
, vol.17
, pp. 107-119
-
-
Motazed-Keyvani, R.1
Ghanbari-Parsa, A.R.2
Kagaya, S.3
-
35
-
-
34548830169
-
A PDA and wireless webintegrated system for quality inspection and defect management of apartment housing projects
-
Kim, Y.S., Oh, S.W., Cho, Y.K. and Seo, J.W. "A PDA and wireless webintegrated system for quality inspection and defect management of apartment housing projects", Automation in Construction, 17, pp. 163-179 (2008).
-
(2008)
Automation in Construction
, vol.17
, pp. 163-179
-
-
Kim, Y.S.1
Oh, S.W.2
Cho, Y.K.3
Seo, J.W.4
-
37
-
-
41549107274
-
Simultaneous consideration of TQM and ISO 9000 on performance and motivation: An empirical study of Spanish companies
-
Martinez-Costa, M., Martinez-Lorente, AR. and Choi, TY. "Simultaneous consideration of TQM and ISO 9000 on performance and motivation: an empirical study of Spanish companies", International Journal of Production Economics, 113, pp. 23-39 (2008).
-
(2008)
International Journal of Production Economics
, vol.113
, pp. 23-39
-
-
Martinez-Costa, M.1
Martinez-Lorente, A.R.2
Choi, T.Y.3
-
38
-
-
76349108491
-
Development of management schemes in irrigation planning: Economic and crop pattern consideration
-
Karamouz, M., Ahmadi, A. and Nazif, S. "Development of management schemes in irrigation planning: economic and crop pattern consideration", Srientia lranica, Transactions A: Civil Engineering, 16(6), pp. 457-466 (2009).
-
(2009)
Srientia Lranica, Transactions A: Civil Engineering
, vol.16
, Issue.6
, pp. 457-466
-
-
Karamouz, M.1
Ahmadi, A.2
Nazif, S.3
-
39
-
-
79951592042
-
A cross-cultural comparison of service quality prioritization
-
Mostaghel, R. and Albadvi, A. "A cross-cultural comparison of service quality prioritization", Scientia lranica, Transactions E: Industrial Engineering, 16(1), pp. 65-72 (2009).
-
(2009)
Scientia Lranica, Transactions E: Industrial Engineering
, vol.16
, Issue.1
, pp. 65-72
-
-
Mostaghel, R.1
Albadvi, A.2
-
40
-
-
3042785325
-
Human factors affecting the acceptance of total quality management
-
Fok, LY., Hartman, SJ., Patti, A.L and Razek, J.R. "Human factors affecting the acceptance of total quality management", International Journal of Quality Er Reliability Management, 17(7), pp. 714-729 (2000).
-
(2000)
International Journal of Quality Er Reliability Management
, vol.17
, Issue.7
, pp. 714-729
-
-
Fok, L.Y.1
Hartman, S.J.2
Patti, A.L.3
Razek, J.R.4
-
41
-
-
3843144923
-
Performance measurement system design - A literature review and research agenda
-
Neely, A, Gregory, M. and Platts, K. "Performance measurement system design-a literature review and research agenda". International Journal of Operations and Production Management, 15(4), pp. 80-116 (1995).
-
(1995)
International Journal of Operations and Production Management
, vol.15
, Issue.4
, pp. 80-116
-
-
Neely, A.1
Gregory, M.2
Platts, K.3
-
42
-
-
28344438887
-
Performance measurement system design - A literature review and research agenda
-
Neely, A., Gregory, M. and Platts, K. "Performance measurement system design-a literature review and research agenda". International Journal of Operations and Production Management, 25(12), pp. 1228-1263 (2005).
-
(2005)
International Journal of Operations and Production Management
, vol.25
, Issue.12
, pp. 1228-1263
-
-
Neely, A.1
Gregory, M.2
Platts, K.3
-
43
-
-
67650700509
-
Performance measurement: Roles and challenges
-
Phusavat, K., Anussornnitisarn, P., Helo, P. and Dwight, R. "Performance measurement: roles and challenges", Industrial Management + Data Systems, 109(5), pp. 646-664 (2009).
-
(2009)
Industrial Management + Data Systems
, vol.109
, Issue.5
, pp. 646-664
-
-
Phusavat, K.1
Anussornnitisarn, P.2
Helo, P.3
Dwight, R.4
-
44
-
-
33750020090
-
Productivity/performance measurement, case application at the government pharmaceutical organization
-
Phusavat, K. and Photaranon, W. "Productivity/performance measurement, case application at the government pharmaceutical organization", Industrial Management + Data Systems, 106(9), pp. 1271-1287 (2006).
-
(2006)
Industrial Management + Data Systems
, vol.106
, Issue.9
, pp. 1271-1287
-
-
Phusavat, K.1
Photaranon, W.2
-
45
-
-
70349435271
-
Performance through measuring leader's profiles: An empirical study
-
Kulmala, H.L, Ahoniemi, L and Nissinen, V. "Performance through measuring leader's profiles: an empirical study", International Journal of Production Economics, 122, pp. 385-394 (2009).
-
(2009)
International Journal of Production Economics
, vol.122
, pp. 385-394
-
-
Kulmala, H.L.1
Ahoniemi, L.2
Nissinen, V.3
-
46
-
-
52949121795
-
Managing the tension between performance measurement and strategy: Coping strategies
-
Johnston, R. and Pongatichat, P. "Managing the tension between performance measurement and strategy: coping strategies", International Journal of Operations and Production Management, 28(10), pp. 941-967 (2008).
-
(2008)
International Journal of Operations and Production Management
, vol.28
, Issue.10
, pp. 941-967
-
-
Johnston, R.1
Pongatichat, P.2
-
47
-
-
45749115781
-
Researching performance measurement systems-an information systems petspective
-
Marchand, M. and Raymond, L "Researching performance measurement systems-an information systems petspective", Internafional Journal of Operations and Production Management, 28(7), pp. 663-686 (2008).
-
(2008)
Internafional Journal of Operations and Production Management
, vol.28
, Issue.7
, pp. 663-686
-
-
Marchand, M.1
Raymond, L.2
-
48
-
-
34447342714
-
Towards a contingency approach to performance measurement: An empirical study in Scottish SMEs
-
Garengo, P. and Bititci, U. 'Towards a contingency approach to performance measurement: an empirical study in Scottish SMEs", International Journal of Operations and Production Management, 27(8), pp. 802-825 (2007).
-
(2007)
International Journal of Operations and Production Management
, vol.27
, Issue.8
, pp. 802-825
-
-
Garengo, P.1
Bititci, U.2
-
49
-
-
34548496042
-
Performance measurement impacts on management and leadership: Perspectives of management and employees
-
Ukko, J., Tenhunen, J. and Rantanen, H. "Performance measurement impacts on management and leadership: perspectives of management and employees", International Journal of Production Economics, 110, pp. 39-51 (2007).
-
(2007)
International Journal of Production Economics
, vol.110
, pp. 39-51
-
-
Ukko, J.1
Tenhunen, J.2
Rantanen, H.3
-
50
-
-
33749394675
-
Dynamics of performance measurement and organizational culture
-
Bititci, U.S., Mendibil, K., Nudurupati, S., Garengo, P. and Turner, T. "Dynamics of performance measurement and organizational culture", International Journal of Operations and Production Management, 26(12), pp. 1325-1350(2006).
-
(2006)
International Journal of Operations and Production Management
, vol.26
, Issue.12
, pp. 1325-1350
-
-
Bititci, U.S.1
Mendibil, K.2
Nudurupati, S.3
Garengo, P.4
Turner, T.5
-
51
-
-
28344435907
-
The evolution of performance measurement researchdevelopments in the last decade and a research agenda for the next
-
Neely, A "The evolution of performance measurement researchdevelopments in the last decade and a research agenda for the next". International Journal of Operations and Production Management, 25(12), pp. 1264-1277 (2005).
-
(2005)
International Journal of Operations and Production Management
, vol.25
, Issue.12
, pp. 1264-1277
-
-
Neely, A.1
-
52
-
-
18844418220
-
Measuring and managing performance in extended enterprises
-
Bititci, U.S., Mendibil, K., Martinez, V. and Albores, P. "Measuring and managing performance in extended enterprises", International Journal of Operations and Production Management, 25(4), pp. 333-353 (2005).
-
(2005)
International Journal of Operations and Production Management
, vol.25
, Issue.4
, pp. 333-353
-
-
Bititci, U.S.1
Mendibil, K.2
Martinez, V.3
Albores, P.4
-
53
-
-
2542488438
-
An exploratory study of performance measurement systems and relationships with performance results
-
Evans, j.R. "An exploratory study of performance measurement systems and relationships with performance results", Journal of Operations Management, 22, pp. 219-232 (2004).
-
(2004)
Journal of Operations Management
, vol.22
, pp. 219-232
-
-
Evans, J.R.1
-
54
-
-
0036459454
-
Web enabled performance measurement systems-management implications
-
Bititci, U.S., Nudurupati, S.S., Turner, TJ. and Creighton, S. "Web enabled performance measurement systems-management implications". International Journal of Operations and Production Management, 22(11), pp. 1273-1287(2002).
-
(2002)
International Journal of Operations and Production Management
, vol.22
, Issue.11
, pp. 1273-1287
-
-
Bititci, U.S.1
Nudurupati, S.S.2
Turner, T.J.3
Creighton, S.4
-
55
-
-
0036455946
-
A framework of the factors affecting the evolution of performance measurement systems
-
Kennerley, M. and Neely, A. "A framework of the factors affecting the evolution of performance measurement systems", International Journal of Operations and Production Management. 22 (11), pp. 1222-1245 (2002).
-
(2002)
International Journal of Operations and Production Management.
, vol.22
, Issue.11
, pp. 1222-1245
-
-
Kennerley, M.1
Neely, A.2
-
56
-
-
0034378896
-
Designing, implementing and updating performance measurement systems
-
Bourne, M., Mills, J., Wilcox, M., Neely, A and Platts, K. "Designing, implementing and updating performance measurement systems", Internationaljournal of Operations and Production Management, 20(7), pp. 754-771 (2000).
-
(2000)
Internationaljournal of Operations and Production Management
, vol.20
, Issue.7
, pp. 754-771
-
-
Bourne, M.1
Mills, J.2
Wilcox, M.3
Neely, A.4
Platts, K.5
-
57
-
-
3543070476
-
Performance measurement system design: Developing and testing a process-based approach
-
1 Mills, J., Platts, K., Richards, H., Gregory, M., Bourne, M. and Kennerley, M. "Performance measurement system design: developing and testing a process-based approach". International Journal of Operations and Production Management, 20(10), pp. 1119-1145 (2000).
-
(2000)
International Journal of Operations and Production Management
, vol.20
, Issue.10
, pp. 1119-1145
-
-
Neely, A.1
Mills, J.2
Platts, K.3
Richards, H.4
Gregory, M.5
Bourne, M.6
Kennerley, M.7
-
58
-
-
2342424933
-
Developing optimism to improve performance: An approach for the manufacturing sector
-
Green Jr., K.W., Medlin, B. and Whitten, D. "Developing optimism to improve performance: an approach for the manufacturing sector". Industrial Management + Data Systems, 104(2), pp. 106-114 (2004).
-
(2004)
Industrial Management + Data Systems
, vol.104
, Issue.2
, pp. 106-114
-
-
Green Jr., K.W.1
Medlin, B.2
Whitten, D.3
-
59
-
-
70149105252
-
Enhancing performance through goal setting, engagement, and optimism
-
Medlin, B. and Green Jr., K.W. "Enhancing performance through goal setting, engagement, and optimism", Industrial Management + Data Systems. 109(7), pp. 943-956 (2009).
-
(2009)
Industrial Management + Data Systems.
, vol.109
, Issue.7
, pp. 943-956
-
-
Medlin, B.1
Green Jr., K.W.2
-
61
-
-
67650705235
-
Importance of performance information in managerial work
-
Laitinen, E.K. "Importance of performance information in managerial work", Industrial Management + Data Systems, 109(4), pp. 550-569 (2009).
-
(2009)
Industrial Management + Data Systems
, vol.109
, Issue.4
, pp. 550-569
-
-
Laitinen, E.K.1
-
62
-
-
40749124423
-
A qualitative re-consttuction of project measurement criteria
-
Ojiako, U., Johansen, E. and Greenwood, D. "A qualitative re-consttuction of project measurement criteria", Industrial Management + Data Systems, 108(3), pp. 405-417 (2008).
-
(2008)
Industrial Management + Data Systems
, vol.108
, Issue.3
, pp. 405-417
-
-
Ojiako, U.1
Johansen, E.2
Greenwood, D.3
-
63
-
-
0037213104
-
The impact of human resource management practices on operational performance: Recognizing country and industry differences
-
Ahmad, S. and Schroeder, R.G. "The impact of human resource management practices on operational performance: recognizing country and industry differences". Journal of Operations Management, 21, pp. 19-43 (2003).
-
(2003)
Journal of Operations Management
, vol.21
, pp. 19-43
-
-
Ahmad, S.1
Schroeder, R.G.2
-
64
-
-
0037400806
-
The impact of organizational structure on time-based manufacturing and plant performance
-
Nahm, AY., Vonderembse, M.A. and Koufteros, XA "The impact of organizational structure on time-based manufacturing and plant performance". Journal of Operations Management, 21, pp. 281-306 (2003).
-
(2003)
Journal of Operations Management
, vol.21
, pp. 281-306
-
-
Nahm, A.Y.1
Vonderembse, M.A.2
Koufteros, X.A.3
-
65
-
-
0035592945
-
Performance measurement systems-models, characteristics and measures
-
De Toni, A. and Tonchia, S. "Performance measurement systems-models, characteristics and measures". International Journal of Operations and Production Management, 21(1-2), pp. 46-70 (2001).
-
(2001)
International Journal of Operations and Production Management
, vol.21
, Issue.1-2
, pp. 46-70
-
-
De Toni, A.1
Tonchia, S.2
-
66
-
-
0035635073
-
The role of performance measurement systems in promoting quality development beyond ISO 9000
-
Najmi, M. and Kehoe, D.F. "The role of performance measurement systems in promoting quality development beyond ISO 9000", Jnternationaljournal of Operations and Production Management, 21(1-2), pp. 159-172 (2001).
-
(2001)
Jnternationaljournal of Operations and Production Management
, vol.21
, Issue.1-2
, pp. 159-172
-
-
Najmi, M.1
Kehoe, D.F.2
-
67
-
-
0033285183
-
The impact of human resource management practices on manufacturing performance
-
Jayaram.J., Droge, C. and Vickery, S.K. "The impact of human resource management practices on manufacturing performance". Journal of Operations Management, 18, pp. 1-20 (1999).
-
(1999)
Journal of Operations Management
, vol.18
, pp. 1-20
-
-
Jayaram, J.1
Droge, C.2
Vickery, S.K.3
-
68
-
-
30344472946
-
Understanding management data systems for enterprise performance management
-
Bose, R. "Understanding management data systems for enterprise performance management", Industrial Management + Data Systems, 106(1), pp. 43-59 (2006).
-
(2006)
Industrial Management + Data Systems
, vol.106
, Issue.1
, pp. 43-59
-
-
Bose, R.1
-
69
-
-
33947495775
-
Integrated decision support systems: A data warehousing perspective
-
March, ST. and Hevner, A.R. "integrated decision support systems: a data warehousing perspective", Decision Support Systems, 43, pp. 1031-1043 (2007).
-
(2007)
Decision Support Systems
, vol.43
, pp. 1031-1043
-
-
March, S.T.1
Hevner, A.R.2
-
71
-
-
36048936274
-
Data acquisition and resistance measurements using a simple program
-
Golnabi, H., Azimi, P. and Poseh, G.H. "Data acquisition and resistance measurements using a simple program", Scientia lranica, 14(5), pp. 467-473 (2007).
-
(2007)
Scientia Lranica
, vol.14
, Issue.5
, pp. 467-473
-
-
Golnabi, H.1
Azimi, P.2
Poseh, G.H.3
-
72
-
-
0036262703
-
IT and strategic decision making
-
Hedelin, L and Allwood, CM. "IT and strategic decision making", Industrial Management + Data Systems, 102(2), pp. 125-139 (2002).
-
(2002)
Industrial Management + Data Systems
, vol.102
, Issue.2
, pp. 125-139
-
-
Hedelin, L.1
Allwood, C.M.2
-
73
-
-
0004241476
-
-
Springer, Cambridge, MA
-
Jarke, M., Lenzerini, M., Vassiliou, Y. and Vassiliadis, P., Fundamentals of Data Warehouses, Springer, Cambridge, MA (2000).
-
(2000)
Fundamentals of Data Warehouses
-
-
Jarke, M.1
Lenzerini, M.2
Vassiliou, Y.3
Vassiliadis, P.4
-
74
-
-
4143062398
-
An XML-based real-time quality measurement scheme
-
Uu, H.C.W., Chan, F.T.S., Fung, R. and Wong, C.W.Y. "An XML-based real-time quality measurement scheme", Industrial Management + Data Systems, 104(6), pp. 505-512 (2004).
-
(2004)
Industrial Management + Data Systems
, vol.104
, Issue.6
, pp. 505-512
-
-
Uu, H.C.W.1
Chan, F.T.S.2
Fung, R.3
Wong, C.W.Y.4
-
75
-
-
0036105529
-
An enterprise-wide knowledge managementsystem infrastructure
-
Lee, S.M. and Hong, S. "An enterprise-wide knowledge managementsystem infrastructure", Industrial Management + Data Systems, 102(1), pp. 17-25 (2002).
-
(2002)
Industrial Management + Data Systems
, vol.102
, Issue.1
, pp. 17-25
-
-
Lee, S.M.1
Hong, S.2
-
76
-
-
2642550850
-
Development of a decision support system using data warehousing to assist builders/developers in site selection
-
Ahmad, I., Azhar, S. and Lukauskis, P. "Development of a decision support system using data warehousing to assist builders/developers in site selection", Automation in Construction, 13, pp. 525-542(2004).
-
(2004)
Automation in Construction
, vol.13
, pp. 525-542
-
-
Ahmad, I.1
Azhar, S.2
Lukauskis, P.3
-
77
-
-
13244262920
-
Utilizing exchanged documents in construction projects for decision support based on datawarehousing techniques
-
Zhiliang, M., Wong, K.D., Heng, L and Jun, Y. "Utilizing exchanged documents in construction projects for decision support based on datawarehousing techniques". Automation in Construction, 14, pp. 405-412 (2005).
-
(2005)
Automation in Construction
, vol.14
, pp. 405-412
-
-
Zhiliang, M.1
Wong, K.D.2
Heng, L.3
Jun, Y.4
-
78
-
-
33846820046
-
Effectiveness of OLAP-based cost data management in construction cost estimate
-
Moon, S.W., Kim, J.S. and Kwon, K.N. "Effectiveness of OLAP-based cost data management in construction cost estimate", Automation inConstruction, 16, pp. 336-344 (2007).
-
(2007)
Automation InConstruction
, vol.16
, pp. 336-344
-
-
Moon, S.W.1
Kim, J.S.2
Kwon, K.N.3
-
79
-
-
33847227735
-
Adoption of web databases for document management in SMEs of the construction sectorin Spain
-
Forcada, N., Casals, M., Roca, X. and Gangolells, M. "Adoption of web databases for document management in SMEs of the construction sectorin Spain", Automation in Construction, 16, pp. 411-424 (2007).
-
(2007)
Automation in Construction
, vol.16
, pp. 411-424
-
-
Forcada, N.1
Casals, M.2
Roca, X.3
Gangolells, M.4
-
80
-
-
0033728850
-
Management issues in data warehousing: Insightsform the housing and development board
-
Ang, J. and Teo, T.S.H. "Management issues in data warehousing: insightsform the housing and development board", Decision Support Systems, 29, pp. 11-20(2000).
-
(2000)
Decision Support Systems
, vol.29
, pp. 11-20
-
-
Ang, J.1
Teo, T.S.H.2
-
82
-
-
0036338256
-
Organizational structures to support concurrent engineering in construction
-
Anumba, Cj., Baugh, C and Khalfan, M.M.A. "Organizational structures to support concurrent engineering in construction". Industrial Management + Data Systems, 102(5), pp. 260-270 (2002).
-
(2002)
Industrial Management + Data Systems
, vol.102
, Issue.5
, pp. 260-270
-
-
Anumba, Cj.1
Baugh, C.2
Khalfan, M.M.A.3
-
84
-
-
0036624992
-
Measuring productivity indexes and efficiency in the container terminal at port Rajaei
-
Zegordi, S.H. and Nahavandi, N. "Measuring productivity indexes and efficiency in the container terminal at port Rajaei", Srientia lranica, 9(3), pp. 248-254 (2002).
-
(2002)
Srientia Lranica
, vol.9
, Issue.3
, pp. 248-254
-
-
Zegordi, S.H.1
Nahavandi, N.2
-
86
-
-
3543077513
-
Realigning organizational variables to support workplace behaviour
-
Hanna, V., Burns, N.D. and Backhouse, CJ. "Realigning organizational variables to support workplace behaviour". International Journal of Operations and Production Management. 20(12), pp. 1380-1391 (2000).
-
(2000)
International Journal of Operations and Production Management.
, vol.20
, Issue.12
, pp. 1380-1391
-
-
Hanna, V.1
Burns, N.D.2
Backhouse, C.J.3
-
88
-
-
0035598246
-
A framework for managing maintenance using performance measurement systems
-
Kutucuoglu, K.Y., Hamali, J., Irani, Z. and Sharp, J.M. "A framework for managing maintenance using performance measurement systems", International Journal of Operations and Production Management, 21(1-2), pp. 173-194(2001).
-
(2001)
International Journal of Operations and Production Management
, vol.21
, Issue.1-2
, pp. 173-194
-
-
Kutucuoglu, K.Y.1
Hamali, J.2
Irani, Z.3
Sharp, J.M.4
-
89
-
-
67650706745
-
Extracting appropriate scope for information systems: A case study
-
Laitinen, E.K., Lansiluoto, A. and Rautiainen, I. "Extracting appropriate scope for information systems: a case study", Industrial Management +Data Systems, 109(3), pp. 305-321 (2009).
-
(2009)
Industrial Management +Data Systems
, vol.109
, Issue.3
, pp. 305-321
-
-
Laitinen, E.K.1
Lansiluoto, A.2
Rautiainen, I.3
-
90
-
-
0035781051
-
A socio-technical framework for quality assessment of computer information systems
-
Palvia, S.C., Sharma, R.S. and Conrath, D.W. "A socio-technical framework for quality assessment of computer information systems". Industrial Management + Data Systems, 101(5), pp. 237-251 (2001).
-
(2001)
Industrial Management + Data Systems
, vol.101
, Issue.5
, pp. 237-251
-
-
Palvia, S.C.1
Sharma, R.S.2
Conrath, D.W.3
|