Volumn 108, Issue 3, 2008, Pages 405-417

A qualitative re-construction of project measurement criteria

Author keywords

Measurement; Project management

Indexed keywords

COST EFFECTIVENESS; FAILURE ANALYSIS; INFORMATION SYSTEMS; MATHEMATICAL MODELS; MEASUREMENT THEORY; OPERATIONS RESEARCH; QUALITY CONTROL; SYSTEMS ANALYSIS;

EID: 40749124423     PISSN: 02635577     EISSN: None     Source Type: Journal    
DOI: 10.1108/02635570810858796     Document Type: Article
Times cited : (56)

References (76)
  • 1
    • 33646478288 scopus 로고    scopus 로고
    • Defining 'success' for software projects: An exploratory revelation
    • Agarwal, N. and Rathod, U. (2006), "Defining 'success' for software projects: an exploratory revelation", International Journal of Project Management, Vol. 24 No. 4, pp. 358-70.
    • (2006) International Journal of Project Management , vol.24 , Issue.4 , pp. 358-70
    • Agarwal, N.1    Rathod, U.2
  • 3
    • 33745456925 scopus 로고    scopus 로고
    • Information needs and use in the construction materials sector in Kuwait
    • Anwar, M. and Tuqan, A. (2006), "Information needs and use in the construction materials sector in Kuwait", The Electronic Library, Vol. 24 No. 3, pp. 335-46.
    • (2006) The Electronic Library , vol.24 , Issue.3 , pp. 335-46
    • Anwar, M.1    Tuqan, A.2
  • 4
    • 0032595622 scopus 로고    scopus 로고
    • Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria
    • Atkinson, R. (1999), "Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria", International Journal of Project Management, Vol. 17 No. 6, pp. 337-42.
    • (1999) International Journal of Project Management , vol.17 , Issue.6 , pp. 337-42
    • Atkinson, R.1
  • 5
    • 40749097485 scopus 로고    scopus 로고
    • Kodak's net falls 61%, hurt by switch to digital
    • Bandler, J. (2003), "Kodak's net falls 61%, hurt by switch to digital", The Wall Street Journal, Vol. 242 No. 17.
    • (2003) The Wall Street Journal , vol.242 , Issue.17
    • Bandler, J.1
  • 6
    • 33947389298 scopus 로고    scopus 로고
    • Moderating effects of information access on project management behaviour, performance and perceptions
    • Bendoly, E. and Swink, M. (2007), "Moderating effects of information access on project management behaviour, performance and perceptions", Journal of Operations Management, Vol. 25 No. 3, pp. 604-22.
    • (2007) Journal of Operations Management , vol.25 , Issue.3 , pp. 604-22
    • Bendoly, E.1    Swink, M.2
  • 7
    • 0036459854 scopus 로고    scopus 로고
    • The success and failure of performance measurement initiatives: Perceptions of participating managers
    • Bourne, M., Neely, A., Platts, K. and Mills, J. (2002), "The success and failure of performance measurement initiatives: perceptions of participating managers", International Journal of Operations & Production Management, Vol. 22 No. 11, pp. 1288-310.
    • (2002) International Journal of Operations & Production Management , vol.22 , Issue.11 , pp. 1288-310
    • Bourne, M.1    Neely, A.2    Platts, K.3    Mills, J.4
  • 8
    • 11344249438 scopus 로고    scopus 로고
    • Determinants of budget overruns on IT projects
    • Calisir, F. and Gumussoy, C. (2005), "Determinants of budget overruns on IT projects", Technovation, Vol. 25 No. 6, pp. 631-40.
    • (2005) Technovation , vol.25 , Issue.6 , pp. 631-40
    • Calisir, F.1    Gumussoy, C.2
  • 9
    • 0242434228 scopus 로고    scopus 로고
    • Framework of success criteria for design/build projects
    • Chan, A., Scott, D. and Lam, E. (2002), "Framework of success criteria for design/build projects", Journal of Management in Engineering, Vol. 18 No. 3, pp. 120-8.
    • (2002) Journal of Management in Engineering , vol.18 , Issue.3 , pp. 120-8
    • Chan, A.1    Scott, D.2    Lam, E.3
  • 10
    • 84986132004 scopus 로고    scopus 로고
    • Planning for ERP systems: Analysis and future trends
    • Chen, I. (2001), "Planning for ERP systems: analysis and future trends", Business Process Management Journal, Vol. 7 No. 5, pp. 374-86.
    • (2001) Business Process Management Journal , vol.7 , Issue.5 , pp. 374-86
    • Chen, I.1
  • 11
    • 0042622417 scopus 로고    scopus 로고
    • The maturity of project management in different industries: An investigation into variations between project management models
    • Cooke-Davies, T. and Arzymanow, A. (2003), "The maturity of project management in different industries: an investigation into variations between project management models", International Journal of Project Management, Vol. 21, pp. 471-8.
    • (2003) International Journal of Project Management , vol.21 , pp. 471-8
    • Cooke-Davies, T.1    Arzymanow, A.2
  • 12
    • 11944272395 scopus 로고    scopus 로고
    • Senior management perceptions of project management competence
    • Crawford, L. (2005), "Senior management perceptions of project management competence", International Journal of Project Management, Vol. 23 No. 1, pp. 7-16.
    • (2005) International Journal of Project Management , vol.23 , Issue.1 , pp. 7-16
    • Crawford, L.1
  • 13
    • 33749569777 scopus 로고
    • Measurement of project management success
    • de Wit (1988), "Measurement of project management success", International Journal of Project Management, Vol. 6 No. 3, pp. 164-70.
    • (1988) International Journal of Project Management , vol.6 , Issue.3 , pp. 164-70
    • De Wit1
  • 15
    • 40749122771 scopus 로고    scopus 로고
    • Industrialization and economic development in Nigeria: A case study of the iron and steel sector
    • available at: www.eurojournals.com/EJSR%207%203.pdf (accessed 11 October 2007)
    • Duru, E. and Sunday, A. (2005), "Industrialization and economic development in Nigeria: a case study of the iron and steel sector", European Journal of Scientific Research, Vol. 7 No. 3, pp. 68-84, available at: www.eurojournals.com/EJSR%207%203.pdf (accessed 11 October 2007).
    • (2005) European Journal of Scientific Research , vol.7 , Issue.3 , pp. 68-84
    • Duru, E.1    Sunday, A.2
  • 16
    • 0347269141 scopus 로고    scopus 로고
    • Plans are nothing, changing plans is everything: The impact of changes on project success
    • Dvir, D. and Lechler, T. (2004), "Plans are nothing, changing plans is everything: the impact of changes on project success", Research Policy, Vol. 33 No. 1, pp. 1-15.
    • (2004) Research Policy , vol.33 , Issue.1 , pp. 1-15
    • Dvir, D.1    Lechler, T.2
  • 18
    • 0142163032 scopus 로고    scopus 로고
    • Learning from corporate mistakes: The rise and fall of iridium
    • Finkelstein, S. and Sanford, S.H. (2000), "Learning from corporate mistakes: the rise and fall of iridium", Organizational Dynamics, Vol. 29 No. 2, pp. 138-48.
    • (2000) Organizational Dynamics , vol.29 , Issue.2 , pp. 138-48
    • Finkelstein, S.1    Sanford, S.H.2
  • 19
    • 34547216864 scopus 로고    scopus 로고
    • Policy and planning for large-infrastructure projects: Problems, causes, cure. environment and planning B
    • Flyvbjerg, B. (2007), "Policy and planning for large-infrastructure projects: problems, causes, cure. environment and planning B", Planning and Design, Vol. 34 No. 4, pp. 578-97.
    • (2007) Planning and Design , vol.34 , Issue.4 , pp. 578-97
    • Flyvbjerg, B.1
  • 21
    • 33845206037 scopus 로고    scopus 로고
    • Public sector information system project failures: Lessons from a New Zealand hospital organization
    • Gauld, R. (2007), "Public sector information system project failures: lessons from a New Zealand hospital organization", Government Information Quarterly, Vol. 24 No. 1, pp. 102-14.
    • (2007) Government Information Quarterly , vol.24 , Issue.1 , pp. 102-14
    • Gauld, R.1
  • 22
    • 33748145662 scopus 로고    scopus 로고
    • A cross-industry comparison of customer satisfaction
    • Gilbert, G. and Veloutsou, C. (2006), "A cross-industry comparison of customer satisfaction", Journal of Services Marketing, Vol. 20 No. 5, pp. 298-308.
    • (2006) Journal of Services Marketing , vol.20 , Issue.5 , pp. 298-308
    • Gilbert, G.1    Veloutsou, C.2
  • 25
    • 2442472498 scopus 로고    scopus 로고
    • Project management in the information systems and information technologies industries
    • September
    • Hartman, F. and Ashrafi, R. (2002), "Project management in the information systems and information technologies industries", Project Management Journal, September, pp. 5-16.
    • (2002) Project Management Journal , pp. 5-16
    • Hartman, F.1    Ashrafi, R.2
  • 26
    • 75649089345 scopus 로고    scopus 로고
    • Baltic Journal of Management. IS projects and implementation
    • Johs, K., Hennestad, B. and Gronhaug, K. (2007), "Baltic Journal of Management. IS projects and implementation", Baltic Journal of Management, Vol. 2 No. 3, pp. 235-50.
    • (2007) Baltic Journal of Management , vol.2 , Issue.3 , pp. 235-50
    • Johs, K.1    Hennestad, B.2    Gronhaug, K.3
  • 27
    • 1442336404 scopus 로고    scopus 로고
    • Understanding the project planning process: Requirements capture for the virtual construction site
    • No.15. ISSN 13522507 Research Report The Bartlett School of Graduate Studies, University College London London
    • Kelsey, J., Winch, G.M. and Penn, A. (2001), "Understanding the project planning process: requirements capture for the virtual construction site", Bartlett Research Papers, No.15. ISSN 13522507 Research Report, The Bartlett School of Graduate Studies, University College London, London.
    • (2001) Bartlett Research Papers
    • Kelsey, J.1    Winch, G.M.2    Penn, A.3
  • 28
    • 40749137964 scopus 로고    scopus 로고
    • KPMG's International 2002-2003 Programme Management Survey available at: www.kpmg.com.au/content/Services/Services/AuditandRiskAdvisory/Information RiskManagement/docs/irmprmpm-survey2003.pdf (accessed 27 November 2004)
    • KPMG (2003) KPMG's International 2002-2003 Programme Management Survey, available at: www.kpmg.com.au/content/Services/Services/AuditandRiskAdvisory/ Information RiskManagement/docs/irmprmpm-survey2003.pdf (accessed 27 November 2004).
    • (2003)
    • Kpmg1
  • 29
    • 0033177685 scopus 로고    scopus 로고
    • Criteria of project success: An exploratory re-examination
    • Lim, C. and Mohamed, M. (1999), "Criteria of project success: an exploratory re-examination", International Journal of Project Management, Vol. 17 No. 4, pp. 243-8.
    • (1999) International Journal of Project Management , vol.17 , Issue.4 , pp. 243-8
    • Lim, C.1    Mohamed, M.2
  • 30
    • 33847288749 scopus 로고    scopus 로고
    • Clients' goals and the construction project management process
    • Lindahl, G. and Ryd, N. (2007), "Clients' goals and the construction project management process", Facilities, Vol. 25 Nos 3/4, pp. 147-56.
    • (2007) Facilities , vol.25 , Issue.34 , pp. 147-56
    • Lindahl, G.1    Ryd, N.2
  • 31
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • Love, P. and Li, H. (2000), "Quantifying the causes and costs of rework in construction", Construction Management and Economics, Vol. 18, pp. 479-90.
    • (2000) Construction Management and Economics , vol.18 , pp. 479-90
    • Love, P.1    Li, H.2
  • 34
    • 0037208764 scopus 로고    scopus 로고
    • An empirical investigation of users' perceptions of web-based communication on a construction project
    • Mohamed, S. and Stewart, R. (2003), "An empirical investigation of users' perceptions of web-based communication on a construction project", Automation in Construction, Vol. 12 No. 1, pp. 43-53.
    • (2003) Automation in Construction , vol.12 , Issue.1 , pp. 43-53
    • Mohamed, S.1    Stewart, R.2
  • 36
    • 40749140122 scopus 로고    scopus 로고
    • Department of Health: National Programme for IT in the NHS Report by the Comptroller and Auditor General. available at: www.nao.org.uk/publications/ naoreports/05-06/05061173.pdf (accessed 17 May 2006)
    • National Audit Office (2006) Department of Health: National Programme for IT in the NHS, Report by the Comptroller and Auditor General. available at: www.nao.org.uk/publications/naoreports/05-06/05061173.pdf (accessed 17 May 2006).
    • (2006)
    • Audit Office, N.1
  • 38
    • 0012786625 scopus 로고
    • Can project management be defined?
    • Oisen, R. (1971), "Can project management be defined?", Project Management Quarterly, Vol. 2 No. 1, pp. 12-14.
    • (1971) Project Management Quarterly , vol.2 , Issue.1 , pp. 12-14
    • Oisen, R.1
  • 39
    • 0031393217 scopus 로고    scopus 로고
    • Programme management: Organising project-based change
    • Pellegrinelli, S. (1997), "Programme management: organising project-based change", International Journal of Project Management, Vol. 11 No. 3, pp. 141-9.
    • (1997) International Journal of Project Management , vol.11 , Issue.3 , pp. 141-9
    • Pellegrinelli, S.1
  • 40
    • 0035283456 scopus 로고    scopus 로고
    • Critical success factors revisited: Success and failure cases of information systems for senior executives
    • Poon, P. and Wagner, C. (2001), "Critical success factors revisited: success and failure cases of information systems for senior executives", Decision Support Systems, Vol. 30 No. 4, pp. 393-418.
    • (2001) Decision Support Systems , vol.30 , Issue.4 , pp. 393-418
    • Poon, P.1    Wagner, C.2
  • 41
    • 29944436552 scopus 로고    scopus 로고
    • The progress of user requirements through a software development project
    • Rexfelt, O. and Rosenblad, E. (2006), "The progress of user requirements through a software development project", International Journal of Industrial Ergonomics, Vol. 36 No. 1, pp. 73-81.
    • (2006) International Journal of Industrial Ergonomics , vol.36 , Issue.1 , pp. 73-81
    • Rexfelt, O.1    Rosenblad, E.2
  • 42
    • 40749145889 scopus 로고    scopus 로고
    • (The) Royal Academy of Engineering The Royal Academy of Engineering and The British Computer Society London available at: www.bcs.org/upload/pdf/ complexity.pdf (accessed 20 October 2007)
    • (The) Royal Academy of Engineering (2004), The Challenges of Complex IT Projects, Report of a Working Group, The Royal Academy of Engineering and The British Computer Society, London, available at: www.bcs.org/upload/pdf/ complexity.pdf (accessed 20 October 2007).
    • (2004) The Challenges of Complex IT Projects, Report of A Working Group
  • 43
    • 0039821691 scopus 로고
    • Experience as a factor in the selection and performance of project managers
    • Rubin, I. and Seeling, W. (1967), "Experience as a factor in the selection and performance of project managers", IEEE Transactions on Engineering Management, Vol. 3 No. 14, pp. 131-4.
    • (1967) IEEE Transactions on Engineering Management , vol.3 , Issue.14 , pp. 131-4
    • Rubin, I.1    Seeling, W.2
  • 45
    • 18844430775 scopus 로고    scopus 로고
    • An alternative model for measuring the success of IS projects: The GPIS model
    • Saleh, Y. and Alshawi, M. (2005), "An alternative model for measuring the success of IS projects: the GPIS model", Journal of Enterprise Information Management, Vol. 18 No. 1, pp. 47-63.
    • (2005) Journal of Enterprise Information Management , vol.18 , Issue.1 , pp. 47-63
    • Saleh, Y.1    Alshawi, M.2
  • 46
    • 1842832074 scopus 로고    scopus 로고
    • A framework for identification and representation of client requirements in the briefing process
    • Shen, Q., Li, H., Chung, J. and Hui, P. (2004), "A framework for identification and representation of client requirements in the briefing process", Construction Management and Economics, Vol. 22 No. 2, pp. 213-21.
    • (2004) Construction Management and Economics , vol.22 , Issue.2 , pp. 213-21
    • Shen, Q.1    Li, H.2    Chung, J.3    Hui, P.4
  • 48
    • 0035735411 scopus 로고    scopus 로고
    • Project success: A multidimensional strategic concept
    • Shenhar, A., Dvir, D., Levy, O. and Maltz, A. (2001), "Project success: a multidimensional strategic concept", Long Range Planning, Vol. 34 No. 6, pp. 699-725.
    • (2001) Long Range Planning , vol.34 , Issue.6 , pp. 699-725
    • Shenhar, A.1    Dvir, D.2    Levy, O.3    Maltz, A.4
  • 49
    • 1542634803 scopus 로고    scopus 로고
    • The meaning of success: Network position and the social construction of project outcomes in an R&D lab
    • Smith-Doerr, L., Manev, I. and Rizova, P. (2004), "The meaning of success: network position and the social construction of project outcomes in an R&D lab", Journal of Engineering & Technology Management, Vol. 21 Nos 1/2, pp. 51-81.
    • (2004) Journal of Engineering & Technology Management , vol.21 , Issue.12 , pp. 51-81
    • Smith-Doerr, L.1    Manev, I.2    Rizova, P.3
  • 50
    • 2642541838 scopus 로고    scopus 로고
    • Evaluating web-based project information management in construction: Capturing the long-term value creation process
    • Stewart, R. and Mohamed, S. (2004), "Evaluating web-based project information management in construction: capturing the long-term value creation process", Automation in Construction, Vol. 13 No. 4, pp. 469-79.
    • (2004) Automation in Construction , vol.13 , Issue.4 , pp. 469-79
    • Stewart, R.1    Mohamed, S.2
  • 53
    • 40749119917 scopus 로고    scopus 로고
    • (The) Standish Group (2001) The Chaos Report
    • (The) Standish Group (2001) The Chaos Report.
  • 54
    • 40749097912 scopus 로고    scopus 로고
    • The Chaos Report
    • The Standish Group (2004) The Chaos Report.
    • (2004)
    • Standish Group, T.1
  • 55
    • 0036532671 scopus 로고    scopus 로고
    • Combining value and project management into an effective programme management model
    • Thiry, M. (2002), "Combining value and project management into an effective programme management model", International Journal of Project Management, Vol. 20 No. 3, pp. 221-7.
    • (2002) International Journal of Project Management , vol.20 , Issue.3 , pp. 221-7
    • Thiry, M.1
  • 56
    • 19344363085 scopus 로고    scopus 로고
    • In-house software development: What project management practices lead to success?
    • Verner, J. and Evanco, W. (2005), "In-house software development: what project management practices lead to success?", IEE Software, Vol. 22 No. 1, pp. 86-93.
    • (2005) IEE Software , vol.22 , Issue.1 , pp. 86-93
    • Verner, J.1    Evanco, W.2
  • 58
    • 0031996797 scopus 로고    scopus 로고
    • How can IS/IT projects be measured for success
    • Wateridge, J. (1998), "How can IS/IT projects be measured for success", International Journal of Project Management, Vol. 16 No. 1, pp. 59-63.
    • (1998) International Journal of Project Management , vol.16 , Issue.1 , pp. 59-63
    • Wateridge, J.1
  • 59
    • 0042121333 scopus 로고    scopus 로고
    • The project excellence model: Linking success criteria and critical success factors
    • Westerveld, E. (2003), "The project excellence model: linking success criteria and critical success factors", International Journal of Project Management, Vol. 21 No. 6, pp. 411-8.
    • (2003) International Journal of Project Management , vol.21 , Issue.6 , pp. 411-8
    • Westerveld, E.1
  • 61
    • 0346560135 scopus 로고    scopus 로고
    • available at: www.maxwideman.com/papers/principles/principles.pdf (accessed 24 November 2004)
    • Wideman, M. (2000), "First principles of project management", available at: www.maxwideman.com/papers/principles/principles.pdf (accessed 24 November 2004).
    • (2000) First Principles of Project Management
    • Wideman, M.1
  • 62
    • 33750933987 scopus 로고    scopus 로고
    • Focusing on business projects as an area for future research: An exploratory discussion of four different perspectives
    • Winter, M., Andersen, E., Elvin, R. and Levene, R. (2006a), "Focusing on business projects as an area for future research: an exploratory discussion of four different perspectives", International Journal of Project Management, Vol. 24 No. 8, pp. 699-709.
    • (2006) International Journal of Project Management , vol.24 , Issue.8 , pp. 699-709
    • Winter, M.1    Andersen, E.2    Elvin, R.3    Levene, R.4
  • 63
    • 33750953605 scopus 로고    scopus 로고
    • The importance of 'process' in rethinking project management: The story of a UK government-funded research network
    • Winter, M., Smith, C., Cooke-Davies, T. and Cicmil, S. (2006b), "The importance of 'process' in rethinking project management: the story of a UK government-funded research network", International Journal of Project Management, Vol. 24, pp. 650-62.
    • (2006) International Journal of Project Management , vol.24 , pp. 650-62
    • Winter, M.1    Smith, C.2    Cooke-Davies, T.3    Cicmil, S.4
  • 64
    • 33845938257 scopus 로고    scopus 로고
    • Top executive audits: Strategic reviews of operational activities
    • Witcher, B., Chau, V. and Harding, P. (2007), "Top executive audits: strategic reviews of operational activities", Managerial Auditing Journal, Vol. 22 No. 1, pp. 95-105.
    • (2007) Managerial Auditing Journal , vol.22 , Issue.1 , pp. 95-105
    • Witcher, B.1    Chau, V.2    Harding, P.3
  • 66
    • 4243137230 scopus 로고    scopus 로고
    • Grasping the complexity of IS development projects
    • Xia, W. and Lee, G. (2004), "Grasping the complexity of IS development projects", Communications of the ACM, Vol. 47 No. 5, pp. 68-74.
    • (2004) Communications of the ACM , vol.47 , Issue.5 , pp. 68-74
    • Xia, W.1    Lee, G.2
  • 67
    • 34047113838 scopus 로고    scopus 로고
    • A new framework for understanding organisational project management through the PMO
    • Aubry, M., Hobbs, B. and Thuillier, D. (2007), "A new framework for understanding organisational project management through the PMO", International Journal of Project Management, Vol. 25 No. 4, pp. 328-36.
    • (2007) International Journal of Project Management , vol.25 , Issue.4 , pp. 328-36
    • Aubry, M.1    Hobbs, B.2    Thuillier, D.3
  • 68
    • 0029772743 scopus 로고    scopus 로고
    • Project management with time, cost, and quality considerations
    • Babu, A. and Suresh, N. (1996), "Project management with time, cost, and quality considerations", European Journal of Operational Research, Vol. 88 Nos 2/20, pp. 320-7.
    • (1996) European Journal of Operational Research , vol.88 , Issue.220 , pp. 320-7
    • Babu, A.1    Suresh, N.2
  • 70
    • 34548595240 scopus 로고    scopus 로고
    • Recent developments in project-based organisations
    • Deguire, M. (2007), "Recent developments in project-based organisations", International Journal of Project Management, Vol. 25 No. 7, pp. 649-58.
    • (2007) International Journal of Project Management , vol.25 , Issue.7 , pp. 649-58
    • Deguire, M.1
  • 71
    • 84859081930 scopus 로고    scopus 로고
    • Application of social network analysis: An approach towards project success and client satisfaction
    • available at: www.rics.org/NR/rdonlyres/AAC59D24-6028-44D0-83A3- 34399AC5AF46/0/COB06Elsheik.pdf (accessed 11 October 2007)
    • El-Sheikh, A. (2006), "Application of social network analysis: an approach towards project success and client satisfaction", Proceeding of the Annual Research Conference of the RICS, available at: www.rics.org/NR/ rdonlyres/AAC59D24-6028-44D0-83A3-34399AC5AF46/0/COB06Elsheik.pdf (accessed 11 October 2007).
    • (2006) Proceeding of the Annual Research Conference of the RICS
    • El-Sheikh, A.1
  • 72
    • 0033177842 scopus 로고    scopus 로고
    • Time, cost and quality trade-off in project management: A case study
    • Khang, D. and Myint, Y. (1999), "Time, cost and quality trade-off in project management: a case study", International Journal of Project Management, Vol. 17 No. 4, pp. 249-56.
    • (1999) International Journal of Project Management , vol.17 , Issue.4 , pp. 249-56
    • Khang, D.1    Myint, Y.2
  • 73
    • 40749159404 scopus 로고    scopus 로고
    • Project failures are less common than you think
    • available at: www.asia.cnet.com/itmanager/project
    • Mochal, T. (2003), "Project failures are less common than you think", CNET Asia, available at: www.asia.cnet.com/itmanager/project.
    • (2003) CNET Asia
    • Mochal, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.