메뉴 건너뛰기




Volumn 31, Issue 10, 2011, Pages 1071-1088

Project portfolio selection in continuous improvement

Author keywords

Decision processes; Lean; Literature review; Project management; Six Sigma

Indexed keywords


EID: 80053082295     PISSN: 01443577     EISSN: None     Source Type: Journal    
DOI: 10.1108/01443571111172435     Document Type: Review
Times cited : (50)

References (135)
  • 1
    • 0027654294 scopus 로고
    • A systematic simulation approach for the design of JIT manufacturing systems
    • Abdou, G. and Dutta, S.P. (1993), "A systematic simulation approach for the design of JIT manufacturing systems" in Journal of Operations Management, Vol. 11, pp. 225-38.
    • (1993) Journal of Operations Management , vol.11 , pp. 225-238
    • Abdou, G.1    Dutta, S.P.2
  • 2
    • 33846919290 scopus 로고    scopus 로고
    • Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study
    • Abdulmalek, F.A. and Rajgopal, J. (2007), "Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study" in International Journal of Production Economics, Vol. 107, pp. 223-36.
    • (2007) International Journal of Production Economics , vol.107 , pp. 223-236
    • Abdulmalek, F.A.1    Rajgopal, J.2
  • 5
    • 73349127083 scopus 로고    scopus 로고
    • An organization development framework in decision making: Implications for practice
    • Akdere, M. and Altman, B.A. (2009), "An organization development framework in decision making: implications for practice" in Organization Development Journal, Vol. 27, pp. 47-56.
    • (2009) Organization Development Journal , vol.27 , pp. 47-56
    • Akdere, M.1    Altman, B.A.2
  • 6
    • 59349113588 scopus 로고    scopus 로고
    • Selection of lean manufacturing systems using the analytic network process - a case study
    • Anand, G. and Kodali, R. (2008a), "Selection of lean manufacturing systems using the analytic network process - a case study" in Journal of Manufacturing Technology Management, Vol. 20, pp. 258-89.
    • (2008) Journal of Manufacturing Technology Management , vol.20 , pp. 258-289
    • Anand, G.1    Kodali, R.2
  • 7
    • 69249230602 scopus 로고    scopus 로고
    • Selection of lean manufacturing systems using the PROMETHEE
    • Anand, G. and Kodali, R. (2008b), "Selection of lean manufacturing systems using the PROMETHEE" in Journal of Modelling in Management, Vol. 3, pp. 40-70.
    • (2008) Journal of Modelling in Management , vol.3 , pp. 40-70
    • Anand, G.1    Kodali, R.2
  • 8
    • 84986159807 scopus 로고    scopus 로고
    • Key ingredients for the effective implementation of Six Sigma program
    • Antony, J. and Banuelas, R. (2002), "Key ingredients for the effective implementation of Six Sigma program" in Measuring Business Excellence, Vol. 6, pp. 20-7.
    • (2002) Measuring Business Excellence , vol.6 , pp. 20-27
    • Antony, J.1    Banuelas, R.2
  • 9
    • 41149092905 scopus 로고    scopus 로고
    • Gearing Six Sigma into UK manufacturing SMEs: Results from a pilot study
    • Antony, J., Kumar, M. and Labib, A. (2008), "Gearing Six Sigma into UK manufacturing SMEs: results from a pilot study" in Journal of the Operational Research Society, Vol. 59, pp. 482-93.
    • (2008) Journal of the Operational Research Society , vol.59 , pp. 482-493
    • Antony, J.1    Kumar, M.2    Labib, A.3
  • 12
    • 54349112086 scopus 로고    scopus 로고
    • Strategy maps as improvement paths of enterprises
    • Barad, M. and Dror, S. (2008), "Strategy maps as improvement paths of enterprises" in International Journal of Production Research, Vol. 46, pp. 6627-47.
    • (2008) International Journal of Production Research , vol.46 , pp. 6627-6647
    • Barad, M.1    Dror, S.2
  • 15
    • 0022328021 scopus 로고
    • A comparison of the analytic hierarchy process and a simple multi-attribute value function
    • Belton, V. (1986), "A comparison of the analytic hierarchy process and a simple multi-attribute value function" in European Journal of Operational Research, Vol. 26, pp. 7-21.
    • (1986) European Journal of Operational Research , vol.26 , pp. 7-21
    • Belton, V.1
  • 17
    • 20444502167 scopus 로고    scopus 로고
    • An overview of continuous improvement: From the past to the present
    • Bhuiyan, N. and Baghel, A. (2005), "An overview of continuous improvement: from the past to the present" in Management Decision, Vol. 43, pp. 761-71.
    • (2005) Management Decision , vol.43 , pp. 761-771
    • Bhuiyan, N.1    Baghel, A.2
  • 21
    • 33846694414 scopus 로고    scopus 로고
    • How managers' everyday decisions create or destroy your company's strategy
    • Bower, J.L. and Gilbert, C.G. (2007), "How managers' everyday decisions create or destroy your company's strategy" in Harvard Business Review, Vol. 85, pp. 72-9.
    • (2007) Harvard Business Review , vol.85 , pp. 72-79
    • Bower, J.L.1    Gilbert, C.G.2
  • 22
  • 24
    • 0000372281 scopus 로고
    • A preference ranking organisation method: (the PROMETHEE method for multiple criteria decision-making)
    • Brans, J.P. and Vincke, P. (1985), "A preference ranking organisation method: (the PROMETHEE method for multiple criteria decision-making)" in Management Science, Vol. 31, pp. 647-56.
    • (1985) Management Science , vol.31 , pp. 647-656
    • Brans, J.P.1    Vincke, P.2
  • 28
    • 35448982246 scopus 로고    scopus 로고
    • Using attributes to predict objectives in preference models
    • Butler, J.C., Dyer, J.S. and Jia, J. (2006), "Using attributes to predict objectives in preference models" in Decision Analysis, Vol. 3, pp. 100-16.
    • (2006) Decision Analysis , vol.3 , pp. 100-116
    • Butler, J.C.1    Dyer, J.S.2    Jia, J.3
  • 29
    • 0034392313 scopus 로고    scopus 로고
    • How improvement programmes of manufacturing are selected: The role of strategic priorities and past experience
    • Cagliano, R. and Spina, G. (2000), "How improvement programmes of manufacturing are selected: the role of strategic priorities and past experience" in International Journal of Operations & Production Management, Vol. 20, pp. 772-91.
    • (2000) International Journal of Operations & Production Management , vol.20 , pp. 772-791
    • Cagliano, R.1    Spina, G.2
  • 31
    • 0027654294 scopus 로고
    • A systematic simulation approach for the design of JIT manufacturing systems
    • Carlson, J.G. and Yao, S.P. (1993), "A systematic simulation approach for the design of JIT manufacturing systems" in Journal of Operations Management, Vol. 11, pp. 225-38.
    • (1993) Journal of Operations Management , vol.11 , pp. 225-238
    • Carlson, J.G.1    Yao, S.P.2
  • 32
    • 71249120027 scopus 로고    scopus 로고
    • Six Sigma failures: An escalation model
    • Chakravorty, S.S. (2009a), "Six Sigma failures: an escalation model" in Operations Management Research, Vol. 2, pp. 44-55.
    • (2009) Operations Management Research , vol.2 , pp. 44-55
    • Chakravorty, S.S.1
  • 34
    • 70349557351 scopus 로고    scopus 로고
    • Strategic selection of suitable projects for hybrid solar-wind power generation systems
    • Chen, H.H., Kang, H.-Y. and Lee, A.H.I. (2010), "Strategic selection of suitable projects for hybrid solar-wind power generation systems" in Renewable and Sustainable Energy Reviews, Vol. 14, pp. 413-21.
    • (2010) Renewable and Sustainable Energy Reviews , vol.14 , pp. 413-421
    • Chen, H.H.1    Kang, H.-Y.2    Lee, A.H.I.3
  • 35
    • 52049102073 scopus 로고    scopus 로고
    • Project selection, scheduling and resource allocation with time dependent returns
    • Chen, J. and Askin, R.G. (2009), "Project selection, scheduling and resource allocation with time dependent returns" in European Journal of Operational Research, Vol. 193, pp. 23-34.
    • (2009) European Journal of Operational Research , vol.193 , pp. 23-34
    • Chen, J.1    Askin, R.G.2
  • 36
    • 77952277603 scopus 로고    scopus 로고
    • TOPSIS approach to project selection in Six-Sigma management
    • Chen, Y., Chen, W.-D., Peng, J. and Wang, J.-Y. (2005), "TOPSIS approach to project selection in Six-Sigma management" in Industrial Engineering Journal, Vol. 8, pp. 90-2.
    • (2005) Industrial Engineering Journal , vol.8 , pp. 90-92
    • Chen, Y.1    Chen, W.-D.2    Peng, J.3    Wang, J.-Y.4
  • 37
    • 33845353123 scopus 로고    scopus 로고
    • Strategic management: The project linkages
    • Wiley, New York, NY
    • Cleland, D.I. (2004), "Strategic management: the project linkages", The Wiley Guide to Managing Projects, Wiley, New York, NY.
    • (2004) The Wiley Guide to Managing Projects
    • Cleland, D.I.1
  • 38
    • 0346195171 scopus 로고
    • Models and methods in multiple objectives decision making
    • Colson, G. and Bruyn, C.D. (1989), "Models and methods in multiple objectives decision making" in Mathematical Computer Modelling, Vol. 12, pp. 1201-11.
    • (1989) Mathematical Computer Modelling , vol.12 , pp. 1201-1211
    • Colson, G.1    Bruyn, C.D.2
  • 39
    • 70349138829 scopus 로고    scopus 로고
    • Overdosed management: How excess of excellence begets failure
    • Coman, A. and Ronen, B. (2009), "Overdosed management: how excess of excellence begets failure" in Human Systems Management, Vol. 28, pp. 93-9.
    • (2009) Human Systems Management , vol.28 , pp. 93-99
    • Coman, A.1    Ronen, B.2
  • 40
    • 76749147400 scopus 로고    scopus 로고
    • Icarus' predicament: Managing the pathologies of overspecification and overdesign
    • Coman, A. and Ronen, B. (2010), "Icarus' predicament: managing the pathologies of overspecification and overdesign" in International Journal of Project Management, Vol. 28, pp. 237-44.
    • (2010) International Journal of Project Management , vol.28 , pp. 237-244
    • Coman, A.1    Ronen, B.2
  • 41
    • 0035501405 scopus 로고    scopus 로고
    • Relationships between implementation of TQM, JIT, and TPM and manufacturing performance
    • Cua, K.O., Mckone, K.E. and Schroeder, R.G. (2001), "Relationships between implementation of TQM, JIT, and TPM and manufacturing performance" in Journal of Operations Management, Vol. 19, pp. 675-94.
    • (2001) Journal of Operations Management , vol.19 , pp. 675-694
    • Cua, K.O.1    Mckone, K.E.2    Schroeder, R.G.3
  • 42
    • 2942552574 scopus 로고    scopus 로고
    • Balanced scorecards for strategic and sustainable continuous improvement capability
    • Dabhilkar, M. and Bengtsson, L. (2004), "Balanced scorecards for strategic and sustainable continuous improvement capability" in Journal of Manufacturing Technology Management, Vol. 15, pp. 350-9.
    • (2004) Journal of Manufacturing Technology Management , vol.15 , pp. 350-359
    • Dabhilkar, M.1    Bengtsson, L.2
  • 43
    • 0034688387 scopus 로고    scopus 로고
    • Quantifying benefits of conversion to lean manufacturing with discrete event simulation: A case study
    • Detty, R.B. and Yingling, J.C. (2000), "Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study" in International Journal of Production Research, Vol. 38, pp. 429-45.
    • (2000) International Journal of Production Research , vol.38 , pp. 429-445
    • Detty, R.B.1    Yingling, J.C.2
  • 44
    • 33746788053 scopus 로고    scopus 로고
    • House of strategy (HOS): From strategic objectives to competitve priorities
    • Dror, S. and Barad, M. (2006), "House of strategy (HOS): from strategic objectives to competitve priorities" in International Journal of Production Research, Vol. 44, pp. 3879-95.
    • (2006) International Journal of Production Research , vol.44 , pp. 3879-3895
    • Dror, S.1    Barad, M.2
  • 45
    • 79958857223 scopus 로고    scopus 로고
    • Lean manufacturing measurement: The relationship between lean activities and lean metrics
    • Duque, D.F.M. and Cadavid, L.R. (2007), "Lean manufacturing measurement: the relationship between lean activities and lean metrics" in Estudios Gerenciales, Vol. 23, pp. 69-83.
    • (2007) Estudios Gerenciales , vol.23 , pp. 69-83
    • Duque, D.F.M.1    Cadavid, L.R.2
  • 46
    • 84933493212 scopus 로고
    • Multiple criteria decision making, multiattribute utility theory: The next ten years
    • Dyer, J.S., Fishburn, P.C., Steuer, R.E., Wallenius, J. and Zionts, S. (1992), "Multiple criteria decision making, multiattribute utility theory: the next ten years" in Management Science, Vol. 38, pp. 645-54.
    • (1992) Management Science , vol.38 , pp. 645-654
    • Dyer, J.S.1    Fishburn, P.C.2    Steuer, R.E.3    Wallenius, J.4    Zionts, S.5
  • 47
    • 21344455488 scopus 로고    scopus 로고
    • Integrating Six Sigma and theory of constraints for continuous improvement: A case study
    • Ehie, I. and Chwen, S. (2005), "Integrating Six Sigma and theory of constraints for continuous improvement: a case study" in Journal of Manufacturing Technology Management, Vol. 16, pp. 542-53.
    • (2005) Journal of Manufacturing Technology Management , vol.16 , pp. 542-553
    • Ehie, I.1    Chwen, S.2
  • 48
    • 49749087953 scopus 로고    scopus 로고
    • Using multi-criteria modeling and simulation to achieve lean goals
    • Wasingdon, DC, Henderson, S.G., Biller, B., Hsieh, M.-H., Shortle, J., Tew, J.D., Barton, R.R. (Eds.)
    • Evans, G.W. and Alexander, S.M. (2007), "Using multi-criteria modeling and simulation to achieve lean goals" Henderson, S.G., Biller, B., Hsieh, M.-H., Shortle, J., Tew, J.D. and Barton, R.R. (Eds.), proceeding of the 2007 Winter Simulation Conference, Wasingdon, DC.
    • (2007) Proceeding of the 2007 Winter Simulation Conference
    • Evans, G.W.1    Alexander, S.M.2
  • 49
    • 28244481889 scopus 로고    scopus 로고
    • Improving project selection using expected net present value analysis
    • Flaig, J.J. (2005), "Improving project selection using expected net present value analysis" in Quality Engineering, Vol. 17, pp. 535-8.
    • (2005) Quality Engineering , vol.17 , pp. 535-538
    • Flaig, J.J.1
  • 54
    • 0037804616 scopus 로고    scopus 로고
    • An examination of the relationships between JIT and financial performance
    • Fullerton, R.R., Mcwatters, C.S. and Fawson, C. (2003), "An examination of the relationships between JIT and financial performance" in Journal of Operations Management, Vol. 21, pp. 383-404.
    • (2003) Journal of Operations Management , vol.21 , pp. 383-404
    • Fullerton, R.R.1    Mcwatters, C.S.2    Fawson, C.3
  • 55
    • 0028755280 scopus 로고
    • Analysis in manufacturing systems simulation: A case study
    • Galbraith, L. and Standridge, C.R. (1994), "Analysis in manufacturing systems simulation: a case study" in Simulation, Vol. 63, pp. 368-75.
    • (1994) Simulation , vol.63 , pp. 368-375
    • Galbraith, L.1    Standridge, C.R.2
  • 56
    • 21344492901 scopus 로고
    • Manufacturing strategic planning
    • Garvin, D.A. (1993), "Manufacturing strategic planning" in California Management Review, Vol. 35, pp. 85-106.
    • (1993) California Management Review , vol.35 , pp. 85-106
    • Garvin, D.A.1
  • 59
    • 34047167424 scopus 로고    scopus 로고
    • A comparison of multiple criteria analysis and unaided approaches to environmental decision making
    • Hajkowicz, S. (2007), "A comparison of multiple criteria analysis and unaided approaches to environmental decision making" in Environmental Science and Policy, Vol. 10, pp. 177-84.
    • (2007) Environmental Science and Policy , vol.10 , pp. 177-184
    • Hajkowicz, S.1
  • 61
    • 0030548543 scopus 로고    scopus 로고
    • New wave manufacturing strategies: Operational, organizational and human dimensions
    • Harrison, A. and Storey, J. (1996), "New wave manufacturing strategies: operational, organizational and human dimensions" in International Journal of Operations & Production Management, Vol. 16, pp. 63-76.
    • (1996) International Journal of Operations & Production Management , vol.16 , pp. 63-76
    • Harrison, A.1    Storey, J.2
  • 64
    • 54349083556 scopus 로고    scopus 로고
    • A multi-objective model for project portfolio selection to implement lean and Six Sigma concepts
    • Hu, G., Wang, L., Fetch, S. and Bidanda, B. (2008), "A multi-objective model for project portfolio selection to implement lean and Six Sigma concepts" in International Journal of Production Research, Vol. 46, pp. 6611-25.
    • (2008) International Journal of Production Research , vol.46 , pp. 6611-6625
    • Hu, G.1    Wang, L.2    Fetch, S.3    Bidanda, B.4
  • 65
    • 70449659156 scopus 로고    scopus 로고
    • A fuzzy AHP-based performance evaluation model for implementing SPC in the Taiwanese LCD industry
    • Huang, C.-T., Yeh, T.-M., Lin, W.-T. and Lee, B.-T. (2009), "A fuzzy AHP-based performance evaluation model for implementing SPC in the Taiwanese LCD industry" in International Journal of Production Research, Vol. 47, pp. 5163-83.
    • (2009) International Journal of Production Research , vol.47 , pp. 5163-5183
    • Huang, C.-T.1    Yeh, T.-M.2    Lin, W.-T.3    Lee, B.-T.4
  • 67
    • 39449115187 scopus 로고    scopus 로고
    • Hoshin kanri and hoshin process: A review and literature survey
    • Jolayemi, J.K. (2008), "Hoshin kanri and hoshin process: a review and literature survey" in Total Quality Management and Business Excellence, Vol. 19, pp. 295-320.
    • (2008) Total Quality Management and Business Excellence , vol.19 , pp. 295-320
    • Jolayemi, J.K.1
  • 68
    • 70449579940 scopus 로고    scopus 로고
    • Project categorization, prioritization, and execution based on Six Sigma concept: A case study of operational improvement project
    • Jung, J.Y. and Lim, S.-G. (2007), "Project categorization, prioritization, and execution based on Six Sigma concept: a case study of operational improvement project" in Project Management Journal, Vol. 38, pp. 55-60.
    • (2007) Project Management Journal , vol.38 , pp. 55-60
    • Jung, J.Y.1    Lim, S.-G.2
  • 69
    • 52249113127 scopus 로고    scopus 로고
    • A combined fuzzy AHP and fuzzy goal programming approach for effective Six-Sigma project selection
    • Kahraman, C. and Buyukozkan, G. (2008), "A combined fuzzy AHP and fuzzy goal programming approach for effective Six-Sigma project selection" in Journal of Multiple-Valued Logic and Soft Computing, Vol. 14, pp. 599-615.
    • (2008) Journal of Multiple-Valued Logic and Soft Computing , vol.14 , pp. 599-615
    • Kahraman, C.1    Buyukozkan, G.2
  • 73
    • 38349151656 scopus 로고    scopus 로고
    • Mastering the management system
    • Kaplan, R.S. and Norton, D.P. (2008b), "Mastering the management system" in Harvard Business Review, Vol. 86, pp. 62-77.
    • (2008) Harvard Business Review , vol.86 , pp. 62-77
    • Kaplan, R.S.1    Norton, D.P.2
  • 74
    • 2942562928 scopus 로고    scopus 로고
    • Perspective on decision analysis applications, 1990-2001
    • Keefer, D.L., Kirkwood, C.W. and Corner, J.L. (2004), "Perspective on decision analysis applications, 1990-2001" in Decision Analysis, Vol. 1, pp. 4-22.
    • (2004) Decision Analysis , vol.1 , pp. 4-22
    • Keefer, D.L.1    Kirkwood, C.W.2    Corner, J.L.3
  • 75
    • 3943104494 scopus 로고    scopus 로고
    • Three steps to project selection
    • Kelly, W.M. (2002), "Three steps to project selection" in Six Sigma Forum Magazine, Vol. 2, pp. 29-32.
    • (2002) Six Sigma Forum Magazine , vol.2 , pp. 29-32
    • Kelly, W.M.1
  • 76
    • 2542463229 scopus 로고    scopus 로고
    • Perceptual meausres of performance: Fact or fiction?
    • Ketokivi, M.A. and Schroeder, R.G. (2004), "Perceptual meausres of performance: fact or fiction?" in Journal of Operations Management, Vol. 22, pp. 247-64.
    • (2004) Journal of Operations Management , vol.22 , pp. 247-264
    • Ketokivi, M.A.1    Schroeder, R.G.2
  • 77
    • 33845605382 scopus 로고    scopus 로고
    • Strategy deployment: Linking lean to business strategy
    • Koenigsaecker, G. (2006), "Strategy deployment: linking lean to business strategy" in Manufacturing Engineering, Vol. 136, pp. 163-71.
    • (2006) Manufacturing Engineering , vol.136 , pp. 163-171
    • Koenigsaecker, G.1
  • 78
    • 41749122902 scopus 로고    scopus 로고
    • The CTQ flowdown as a conceptual model of project objectives
    • Koning, H.D. and Mast, J.D. (2007), "The CTQ flowdown as a conceptual model of project objectives" in The Quality Management Journal, Vol. 14, pp. 19-29.
    • (2007) The Quality Management Journal , vol.14 , pp. 19-29
    • Koning, H.D.1    Mast, J.D.2
  • 79
    • 80053058419 scopus 로고    scopus 로고
    • working paper: Selection of continuous improvement projects in industry
    • School of Mechanical and Manufacturing Engineering, University of New South Wales, Sydney
    • Kornfeld, B.J. (2010), "working paper: selection of continuous improvement projects in industry", School of Mechanical and Manufacturing Engineering, University of New South Wales, Sydney.
    • (2010)
    • Kornfeld, B.J.1
  • 81
    • 34548205730 scopus 로고    scopus 로고
    • Six Sigma project selection using data envelopment analysis
    • Kumar, U.D., Saranga, H., Ramirez-Marquez, J.E. and Nowicki, D. (2007), "Six Sigma project selection using data envelopment analysis" in TQM Magazine, Vol. 19, pp. 419-41.
    • (2007) TQM Magazine , vol.19 , pp. 419-441
    • Kumar, U.D.1    Saranga, H.2    Ramirez-Marquez, J.E.3    Nowicki, D.4
  • 83
    • 80053070453 scopus 로고    scopus 로고
    • Quantitative analysis and optimization of the effectiveness of lean methods in small batch production
    • Weimarer Optimierungs- und Stochastiktage
    • Lanza, G., Peter, K. and Broos, A. (2008), "Quantitative analysis and optimization of the effectiveness of lean methods in small batch production", Weimarer Optimierungs- und Stochastiktage.
    • (2008)
    • Lanza, G.1    Peter, K.2    Broos, A.3
  • 85
    • 0035254107 scopus 로고    scopus 로고
    • An integrated approach for interdependent information system project selection
    • Lee, J.W. and Kim, S.H. (2001), "An integrated approach for interdependent information system project selection" in International Journal of Project Management, Vol. 19, pp. 111-18.
    • (2001) International Journal of Project Management , vol.19 , pp. 111-118
    • Lee, J.W.1    Kim, S.H.2
  • 86
    • 34249113269 scopus 로고    scopus 로고
    • An application of simulation and value stream mapping in lean manufacturing
    • Dresden, Verbraeck, A., Krug, W. (Eds.)
    • Lian, Y.-H. and Landeghem, H.V. (2002), "An application of simulation and value stream mapping in lean manufacturing" Verbraeck, A. and Krug, W. (Eds.), paper presented at 14th European Simulation Symposium, Dresden.
    • (2002) Paper presented at 14th European Simulation Symposium
    • Lian, Y.-H.1    Landeghem, H.V.2
  • 87
    • 34249027911 scopus 로고    scopus 로고
    • Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator
    • Lian, Y.H. and Landeghem, H.V. (2007), "Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator" in International Journal of Production Research, Vol. 45, pp. 3037-58.
    • (2007) International Journal of Production Research , vol.45 , pp. 3037-3058
    • Lian, Y.H.1    Landeghem, H.V.2
  • 89
    • 0029387149 scopus 로고
    • A simulation analysis of sequencing alternatives for JIT lines using kanbans
    • Lummus, R. (1995), "A simulation analysis of sequencing alternatives for JIT lines using kanbans" in Journal of Operations Management, Vol. 13, pp. 183-91.
    • (1995) Journal of Operations Management , vol.13 , pp. 183-191
    • Lummus, R.1
  • 92
    • 0242269345 scopus 로고    scopus 로고
    • PROMETHEE and AHP: The design of operational synergies in multicriteria analysis: Strengthening PROMETHEE with ideas of AHP
    • Macharis, C., Springael, J., De Brucker, K. and Verbeke, A. (2004), "PROMETHEE and AHP: the design of operational synergies in multicriteria analysis: strengthening PROMETHEE with ideas of AHP" in European Journal of Operational Research, Vol. 153, pp. 307-17.
    • (2004) European Journal of Operational Research , vol.153 , pp. 307-317
    • Macharis, C.1    Springael, J.2    de Brucker, K.3    Verbeke, A.4
  • 95
    • 0000150757 scopus 로고
    • Patterns in strategy formation
    • Mintzberg, H. (1978), "Patterns in strategy formation" in Management Science, Vol. 24, pp. 934-48.
    • (1978) Management Science , vol.24 , pp. 934-948
    • Mintzberg, H.1
  • 96
    • 0032067774 scopus 로고    scopus 로고
    • An empirical investigation of the antecedents and consequences of manufacturing goal achievement in North American
    • Narasimhan, R. and Jayaram, J. (1998), "An empirical investigation of the antecedents and consequences of manufacturing goal achievement in North American" in European and Pan Pacific firms. Journal of Operations Management, Vol. 16, pp. 159-76.
    • (1998) European and Pan Pacific Firms. Journal of Operations Management , vol.16 , pp. 159-176
    • Narasimhan, R.1    Jayaram, J.2
  • 97
    • 34047156890 scopus 로고    scopus 로고
    • A balanced scorecard approach to project management leadership
    • Norrie, D.H. and Walker, D.H.T. (2004), "A balanced scorecard approach to project management leadership" in Project Management Journal, Vol. 35, pp. 47-56.
    • (2004) Project Management Journal , vol.35 , pp. 47-56
    • Norrie, D.H.1    Walker, D.H.T.2
  • 99
    • 0029368368 scopus 로고
    • Review of modelling techniques and tools for decision making in manufacturing management
    • Pandya, K.V. (1995), "Review of modelling techniques and tools for decision making in manufacturing management" in IEE Proceedings: Science, Measurement and Technology, Vol. 142, pp. 371-7.
    • (1995) IEE Proceedings: Science, Measurement and Technology , vol.142 , pp. 371-377
    • Pandya, K.V.1
  • 101
    • 34548124537 scopus 로고    scopus 로고
    • Criteria for evaluating group decision-making methods
    • Peniwati, K. (2007), "Criteria for evaluating group decision-making methods" in Mathematical and Computer Modelling, Vol. 46, pp. 935-47.
    • (2007) Mathematical and Computer Modelling , vol.46 , pp. 935-947
    • Peniwati, K.1
  • 102
    • 0023310442 scopus 로고
    • An investigation of the factors influencing the number of kanbans required in the implementation of JIT technique with kanbans
    • Philipoom, P.R., Rees, L., Taylor, B. and Huang, P. (1987), "An investigation of the factors influencing the number of kanbans required in the implementation of JIT technique with kanbans" in International Journal of Production Research, Vol. 26, pp. 457-72.
    • (1987) International Journal of Production Research , vol.26 , pp. 457-472
    • Philipoom, P.R.1    Rees, L.2    Taylor, B.3    Huang, P.4
  • 106
    • 9144238291 scopus 로고    scopus 로고
    • Exploring influencing factors on rationality: A literature review of dynamic decision-making studies in system dynamics
    • Rouwette, E.A.J.A., Großler, A. and Vennix, J.A.M. (2004), "Exploring influencing factors on rationality: a literature review of dynamic decision-making studies in system dynamics" in Systems Research and Behavioral Science, Vol. 21, pp. 351-70.
    • (2004) Systems Research and Behavioral Science , vol.21 , pp. 351-370
    • Rouwette, E.A.J.A.1    Großler, A.2    Vennix, J.A.M.3
  • 107
    • 0025700933 scopus 로고
    • How to make a decision: The analytic hierarchy process
    • Saaty, T.L. (1990), "How to make a decision: the analytic hierarchy process" in European Journal of Operational Research, Vol. 48, pp. 9-26.
    • (1990) European Journal of Operational Research , vol.48 , pp. 9-26
    • Saaty, T.L.1
  • 112
    • 34248550363 scopus 로고    scopus 로고
    • Defining and developing measures of lean production
    • Shah, R. and Ward, P.T. (2007), "Defining and developing measures of lean production" in Journal of Operations Management, Vol. 25, pp. 785-805.
    • (2007) Journal of Operations Management , vol.25 , pp. 785-805
    • Shah, R.1    Ward, P.T.2
  • 113
    • 23844433862 scopus 로고    scopus 로고
    • The project selection process
    • Snee, R.D. and Rodenbaugh, W.F. (2002), "The project selection process" in Quality Progress, Vol. 35, pp. 78-80.
    • (2002) Quality Progress , vol.35 , pp. 78-80
    • Snee, R.D.1    Rodenbaugh, W.F.2
  • 114
    • 0036190151 scopus 로고    scopus 로고
    • A model for evaluating the degree of leanness in manufacturing firms
    • Soriano-Meier, H. and Forrester, P.L. (2002), "A model for evaluating the degree of leanness in manufacturing firms" in Integrated Manufacturing Systems, Vol. 13, pp. 104-9.
    • (2002) Integrated Manufacturing Systems , vol.13 , pp. 104-109
    • Soriano-Meier, H.1    Forrester, P.L.2
  • 116
    • 38649123669 scopus 로고    scopus 로고
    • A systematic methodology for the creation of Six Sigma projects: A case study of semiconductor foundry
    • Su, C.-T. and Chou, C.-J. (2008), "A systematic methodology for the creation of Six Sigma projects: a case study of semiconductor foundry" in Expert Systems with Applications, Vol. 34, pp. 2693-703.
    • (2008) Expert Systems with Applications , vol.34 , pp. 2693-2703
    • Su, C.-T.1    Chou, C.-J.2
  • 120
    • 33746643367 scopus 로고    scopus 로고
    • Program management: A strategic decision management process
    • Wiley, New York, NY
    • Thiry, M. (2004), "Program management: a strategic decision management process", The Wiley Guide to Managing Projects, Wiley, New York, NY.
    • (2004) The Wiley Guide to Managing Projects
    • Thiry, M.1
  • 122
    • 44949288762 scopus 로고
    • An overview of the analytic hierarchy process and its applications
    • Vargas, L.G. (1990), "An overview of the analytic hierarchy process and its applications" in European Journal of Operational Research, Vol. 48, pp. 2-8.
    • (1990) European Journal of Operational Research , vol.48 , pp. 2-8
    • Vargas, L.G.1
  • 123
    • 0000030687 scopus 로고
    • The concept of fit in strategy research: Toward verbal and statistical correspondence
    • Venkataraman, N. (1989), "The concept of fit in strategy research: toward verbal and statistical correspondence" in The Academy of Management Review, Vol. 14, pp. 423-44.
    • (1989) The Academy of Management Review , vol.14 , pp. 423-444
    • Venkataraman, N.1
  • 124
    • 0036722563 scopus 로고    scopus 로고
    • Toward a theory of project interdependencies in high tech environments
    • Verma, D. and Sinha, K.K. (2002), "Toward a theory of project interdependencies in high tech environments" in Journal of Operations Management, Vol. 20, pp. 451-68.
    • (2002) Journal of Operations Management , vol.20 , pp. 451-468
    • Verma, D.1    Sinha, K.K.2
  • 126
    • 0034555899 scopus 로고    scopus 로고
    • Fuzzy multicriteria decision making - an overview
    • Wang, H.F. (2000), "Fuzzy multicriteria decision making - an overview" in Journal of Intelligent and Fuzzy Systems, Vol. 9, pp. 61-83.
    • (2000) Journal of Intelligent and Fuzzy Systems , vol.9 , pp. 61-83
    • Wang, H.F.1
  • 128
    • 0023138922 scopus 로고
    • Decision making with incomplete information
    • Weber, M. (1987), "Decision making with incomplete information" in European Journal of Operational Research, Vol. 28, pp. 44-57.
    • (1987) European Journal of Operational Research , vol.28 , pp. 44-57
    • Weber, M.1
  • 133
    • 0002425683 scopus 로고
    • The analytic hierarchy process: A survey of the method and its applications
    • Zahedi, F. (1986), "The analytic hierarchy process: a survey of the method and its applications" in Interfaces, Vol. 16, pp. 96-108.
    • (1986) Interfaces , vol.16 , pp. 96-108
    • Zahedi, F.1
  • 134
    • 70449586682 scopus 로고    scopus 로고
    • Project management infrastructure: The key to operational performance improvement
    • Zhang, W., Hill, A.V., Schroeder, R.G. and Linderman, K.W. (2008), "Project management infrastructure: the key to operational performance improvement" in Operations Management Research, Vol. 1, pp. 40-52.
    • (2008) Operations Management Research , vol.1 , pp. 40-52
    • Zhang, W.1    Hill, A.V.2    Schroeder, R.G.3    Linderman, K.W.4
  • 135
    • 33746791541 scopus 로고    scopus 로고
    • Decision analysis in energy and environmental modeling: An update
    • Zhou, P., Ang, B.W. and Poh, K.L. (2006), "Decision analysis in energy and environmental modeling: an update" in Energy, Vol. 31, pp. 2604-22.
    • (2006) Energy , vol.31 , pp. 2604-2622
    • Zhou, P.1    Ang, B.W.2    Poh, K.L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.