메뉴 건너뛰기




Volumn 3, Issue 1, 2008, Pages 40-70

Selection of lean manufacturing systems using the PROMETHEE

Author keywords

Decision making; Lean production; Strategic choices

Indexed keywords


EID: 69249230602     PISSN: 17465664     EISSN: 17465672     Source Type: Journal    
DOI: 10.1108/17465660810860372     Document Type: Article
Times cited : (127)

References (64)
  • 1
    • 0029270848 scopus 로고
    • Water resources planning in the Middle East: application of the PROMETHEE V multicriteria method
    • ()“”-
    • Abu-Taleb, M.F. and Mareschal, B. (1995), “Water resources planning in the Middle East: application of the PROMETHEE V multicriteria method”, European Journal of Operational Research, Vol. 81, pp. 500-11.
    • (1995) European Journal of Operational Research , vol.81 , pp. 500-511
    • Abu-Taleb, M.F.1    Mareschal, B.2
  • 2
    • 0242364093 scopus 로고    scopus 로고
    • Formulating national information technology strategies: a preference ranking model using PROMETHEE method
    • ()“”-
    • Albadvi, A. (2004), “Formulating national information technology strategies: a preference ranking model using PROMETHEE method”, European Journal of Operational Research, Vol. 153, pp. 290-6.
    • (2004) European Journal of Operational Research , vol.153 , pp. 290-296
    • Albadvi, A.1
  • 6
    • 33846428465 scopus 로고    scopus 로고
    • Supplier evaluation and management system for strategic sourcing based on a new multicriteria sorting procedure
    • ()“”-
    • Araz, C. and Ozkarahan, I. (2007), “Supplier evaluation and management system for strategic sourcing based on a new multicriteria sorting procedure”, International Journal of Production Economics, Vol. 106, pp. 585-606.
    • (2007) International Journal of Production Economics , vol.106 , pp. 585-606
    • Araz, C.1    Ozkarahan, I.2
  • 7
    • 0030685016 scopus 로고    scopus 로고
    • CIM: getting set for implementation
    • ()“”-
    • Attaran, M. (1997), “CIM: getting set for implementation”, Industrial Management & Data Systems, Vol. 97 No. 1, pp. 3-9.
    • (1997) Industrial Management & Data Systems , vol.97 , Issue.1 , pp. 3-9
    • Attaran, M.1
  • 8
    • 0032158077 scopus 로고    scopus 로고
    • Ranking of enterprises based on multicriteria analysis
    • ()“”-
    • Babic, Z. and Plazibat, N. (1998), “Ranking of enterprises based on multicriteria analysis”, International Journal of Production Economics, Vol. 56/57, pp. 29-35.
    • (1998) International Journal of Production Economics , vol.57 , pp. 29-35
    • Babic, Z.1    Plazibat, N.2
  • 9
    • 0025519351 scopus 로고
    • Justification of computer-integrated manufacturing: some insights into the practice
    • ()“”-
    • Boaden, R.J. and Dale, B. (1990), “Justification of computer-integrated manufacturing: some insights into the practice”, IEEE Transactions on Engineering Management, Vol. 37 No. 4, pp. 291-6.
    • (1990) IEEE Transactions on Engineering Management , vol.37 , Issue.4 , pp. 291-296
    • Boaden, R.J.1    Dale, B.2
  • 10
    • 33645503310 scopus 로고    scopus 로고
    • An empirical study of lean production in the ceramic tile industry in Spain
    • ()“”-
    • Bonavia, T. and Marin, J.A. (2006), “An empirical study of lean production in the ceramic tile industry in Spain”, International Journal of Operations & Production Management, Vol. 26 No. 5, pp. 505-31.
    • (2006) International Journal of Operations & Production Management , vol.26 , Issue.5 , pp. 505-531
    • Bonavia, T.1    Marin, J.A.2
  • 11
    • 0028542026 scopus 로고
    • The PROMCALC & GAIA decision support system for multicriteria decision aid
    • ()“”-
    • Brans, J.P. and Mareschal, B. (1994), “The PROMCALC & GAIA decision support system for multicriteria decision aid”, Decision Support Systems, Vol. 12, pp. 297-310.
    • (1994) Decision Support Systems , vol.12 , pp. 297-310
    • Brans, J.P.1    Mareschal, B.2
  • 12
    • 0000372281 scopus 로고
    • A preference ranking organization method (the PROMETHEE method for multiple criteria decision making)
    • ()“”-
    • Brans, J.P. and Vinke, P.H. (1985), “A preference ranking organization method (the PROMETHEE method for multiple criteria decision making)”, Management Science, Vol. 31, pp. 647-56.
    • (1985) Management Science , vol.31 , pp. 647-656
    • Brans, J.P.1    Vinke, P.H.2
  • 14
    • 0025700102 scopus 로고
    • Nuclear waste management: an application of the multicriteria PROMETHEE methods
    • ()“”-
    • Briggs, Th., Kunsch, P.L. and Mareschal, B. (1990), “Nuclear waste management: an application of the multicriteria PROMETHEE methods”, European Journal of Operational Research, Vol. 44, pp. 1-10.
    • (1990) European Journal of Operational Research , vol.44 , pp. 1-10
    • Briggs, T.1    Kunsch, P.L.2    Mareschal, B.3
  • 17
    • 0036035970 scopus 로고    scopus 로고
    • Is ‘lean’ a universal production system?-Batch production in the automotive industry
    • ()“”-
    • Cooney, R. (2002), “Is ‘lean’ a universal production system?-Batch production in the automotive industry”, International Journal of Operations & Production Management, Vol. 22 No. 10, pp. 1130-47.
    • (2002) International Journal of Operations & Production Management , vol.22 , Issue.10 , pp. 1130-1147
    • Cooney, R.1
  • 19
    • 0030110025 scopus 로고    scopus 로고
    • A note on the use of PROMETHEE multicriteria methods
    • ()“”-
    • De Keyser, W. and Peeters, P. (1996), “A note on the use of PROMETHEE multicriteria methods”, European Journal of Operational Research, Vol. 89 No. 3, pp. 457-61.
    • (1996) European Journal of Operational Research , vol.89 , Issue.3 , pp. 457-461
    • De Keyser, W.1    Peeters, P.2
  • 20
    • 0034688387 scopus 로고    scopus 로고
    • Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study
    • ()“”-
    • Detty, R.B. and Yingling, J.C. (2000), “Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study”, International Journal of Production Research, Vol. 38 No. 2, pp. 429-45.
    • (2000) International Journal of Production Research , vol.38 , Issue.2 , pp. 429-445
    • Detty, R.B.1    Yingling, J.C.2
  • 22
    • 0026205016 scopus 로고
    • Cardinal ranking of alternative actions: extension of the PROMETHEE method
    • ()“”-
    • Diakoulaki, D. and Koumoutsos, N. (1991), “Cardinal ranking of alternative actions: extension of the PROMETHEE method”, European Journal of Operational Research, Vol. 53, pp. 337-47.
    • (1991) European Journal of Operational Research , vol.53 , pp. 337-347
    • Diakoulaki, D.1    Koumoutsos, N.2
  • 24
    • 0033745917 scopus 로고    scopus 로고
    • An extension of the PROMETHEE method for decision making in fuzzy environment: ranking of alternative energy exploitation projects
    • ()“”-
    • Goumas, M. and Lygerou, V. (2000), “An extension of the PROMETHEE method for decision making in fuzzy environment: ranking of alternative energy exploitation projects”, European Journal of Operational Research, Vol. 123, pp. 606-13.
    • (2000) European Journal of Operational Research , vol.123 , pp. 606-613
    • Goumas, M.1    Lygerou, V.2
  • 26
    • 0032685944 scopus 로고    scopus 로고
    • Implications of computer-integrated manufacturing in small and medium enterprises: an empirical investigation
    • ()“”-
    • Gunasekaran, A. and Thevarajah, K. (1999), “Implications of computer-integrated manufacturing in small and medium enterprises: an empirical investigation”, The International Journal of Advanced Manufacturing Technology, Vol. 15, pp. 251-60.
    • (1999) The International Journal of Advanced Manufacturing Technology , vol.15 , pp. 251-260
    • Gunasekaran, A.1    Thevarajah, K.2
  • 27
    • 0033887561 scopus 로고    scopus 로고
    • Design and implementation of computer integrated manufacturing in small and medium-sized enterprises: a case study
    • ()“”-
    • Gunasekaran, A., Marri, H.B. and Lee, B. (2000), “Design and implementation of computer integrated manufacturing in small and medium-sized enterprises: a case study”, The International Journal of Advanced Manufacturing Technology, Vol. 16, pp. 46-54.
    • (2000) The International Journal of Advanced Manufacturing Technology , vol.16 , pp. 46-54
    • Gunasekaran, A.1    Marri, H.B.2    Lee, B.3
  • 28
    • 0011663976 scopus 로고    scopus 로고
    • Implications of organization and human behaviour on the implementation of CIM in SMEs: an empirical analysis
    • ()“”-
    • Gunasekaran, A., Marri, H.B., McGaughey, R. and Grieve, R.J. (2001), “Implications of organization and human behaviour on the implementation of CIM in SMEs: an empirical analysis”, International Journal of Computer Integrated Manufacturing, Vol. 14 No. 2, pp. 175-85.
    • (2001) International Journal of Computer Integrated Manufacturing , vol.14 , Issue.2 , pp. 175-185
    • Gunasekaran, A.1    Marri, H.B.2    McGaughey, R.3    Grieve, R.J.4
  • 29
  • 30
    • 33746512815 scopus 로고    scopus 로고
    • Incorporating uncertainty in the PROMETHEE MCDA method
    • ()“”-
    • Hyde, K., Maier, H.R. and Colby, C. (2005), “Incorporating uncertainty in the PROMETHEE MCDA method”, Journal of Multi-Criteria Decision Analysis, Vol. 12 Nos 4/5, pp. 245-59.
    • (2005) Journal of Multi-Criteria Decision Analysis , vol.12 , Issue.4 , pp. 245-259
    • Hyde, K.1    Maier, H.R.2    Colby, C.3
  • 31
    • 0033349536 scopus 로고    scopus 로고
    • Total quality management in India: perspective and analysis
    • ()“”-
    • Jagadeesh, R. (1999), “Total quality management in India: perspective and analysis”, The TQM Magazine, Vol. 11 No. 5, pp. 321-7.
    • (1999) The TQM Magazine , vol.11 , Issue.5 , pp. 321-327
    • Jagadeesh, R.1
  • 33
    • 0026943986 scopus 로고
    • Multi-criteria analysis in the evaluation of advanced manufacturing technology using PROMETHEE
    • ()“”-
    • Kolli, S. and Parsaei, H.R. (1992), “Multi-criteria analysis in the evaluation of advanced manufacturing technology using PROMETHEE”, Computers & Industrial Engineering, Vol. 23 Nos 1/4, pp. 455-8.
    • (1992) Computers & Industrial Engineering , vol.23 , Issue.4 , pp. 455-458
    • Kolli, S.1    Parsaei, H.R.2
  • 36
    • 0345759911 scopus 로고    scopus 로고
    • Lean manufacturing in temperature dependent processes with interruptions
    • ()“”-
    • Lee, W.L. and Allwood, J.M. (2003), “Lean manufacturing in temperature dependent processes with interruptions”, International Journal of Operations & Production Management, Vol. 23 No. 11, pp. 1377-400.
    • (2003) International Journal of Operations & Production Management , vol.23 , Issue.11 , pp. 1377-1400
    • Lee, W.L.1    Allwood, J.M.2
  • 37
    • 0032168250 scopus 로고    scopus 로고
    • An interval version of PROMETHEE for the comparison of building products’ design with ill-defined data on environmental quality
    • ()“”-
    • Le Teno, J.F. and Mareschal, B. (1998), “An interval version of PROMETHEE for the comparison of building products’ design with ill-defined data on environmental quality”, European Journal of Operational Research, Vol. 109, pp. 522-9.
    • (1998) European Journal of Operational Research , vol.109 , pp. 522-529
    • Le Teno, J.F.1    Mareschal, B.2
  • 38
    • 0242269345 scopus 로고    scopus 로고
    • PROMETHEE and AHP: the design of operational synergies in multicriteria analysis. Strengthening PROMETHEE with ideas of AHP
    • ()“”-
    • Macharis, C. and Springael, J. (2004), “PROMETHEE and AHP: the design of operational synergies in multicriteria analysis. Strengthening PROMETHEE with ideas of AHP”, European Journal of Operational Research, Vol. 153, pp. 307-17.
    • (2004) European Journal of Operational Research , vol.153 , pp. 307-317
    • Macharis, C.1    Springael, J.2
  • 39
    • 30844441010 scopus 로고    scopus 로고
    • A discussion on the computational limitations of outranking methods for land-use suitability assessment
    • ()“”-
    • Marinoni, O. (2006), “A discussion on the computational limitations of outranking methods for land-use suitability assessment”, International Journal of Geographical Information Science, Vol. 20 No. 1, pp. 69-87.
    • (2006) International Journal of Geographical Information Science , vol.20 , Issue.1 , pp. 69-87
    • Marinoni, O.1
  • 40
    • 0032293153 scopus 로고    scopus 로고
    • An investigation into the implementation of computer integrated manufacturing in small and medium enterprises
    • ()“”-
    • Marri, H.B., Gunasekaran, A. and Grieve, R.J. (1998), “An investigation into the implementation of computer integrated manufacturing in small and medium enterprises”, The International Journal of Advanced manufacturing Technology, Vol. 14, pp. 935-42.
    • (1998) The International Journal of Advanced manufacturing Technology , vol.14 , pp. 935-942
    • Marri, H.B.1    Gunasekaran, A.2    Grieve, R.J.3
  • 41
    • 28044468662 scopus 로고    scopus 로고
    • Project prioritization under policy restrictions: a combination of MCDA with 0-1 programming
    • ()“”-
    • Mavrotas, G., Diakoulaki, D. and Caloghirou, Y. (2006), “Project prioritization under policy restrictions: a combination of MCDA with 0-1 programming”, European Journal of Operational Research, Vol. 171, pp. 296-308.
    • (2006) European Journal of Operational Research , vol.171 , pp. 296-308
    • Mavrotas, G.1    Diakoulaki, D.2    Caloghirou, Y.3
  • 42
    • 3543102692 scopus 로고    scopus 로고
    • Computer integrated manufacturing in German industry: aspirations and achievements
    • ()“”-
    • Milling, P.M. (1997), “Computer integrated manufacturing in German industry: aspirations and achievements”, International Journal of Operations & Production Management, Vol. 17 No. 10, pp. 1034-45.
    • (1997) International Journal of Operations & Production Management , vol.17 , Issue.10 , pp. 1034-1045
    • Milling, P.M.1
  • 44
    • 31444436530 scopus 로고    scopus 로고
    • Incorporating multiple criteria into the design of conservation area networks: a minireview with recommendations
    • ()“”-
    • Moffett, A. and Sarkar, S. (2006), “Incorporating multiple criteria into the design of conservation area networks: a minireview with recommendations”, Diversity and Distributions, Vol. 12 No. 2, pp. 125-37.
    • (2006) Diversity and Distributions , vol.12 , Issue.2 , pp. 125-137
    • Moffett, A.1    Sarkar, S.2
  • 46
    • 25444432301 scopus 로고    scopus 로고
    • Investment projects evaluation by simulation and multiple criteria decision aiding procedure
    • ()“”-
    • Nowak, M. (2005), “Investment projects evaluation by simulation and multiple criteria decision aiding procedure”, Journal of Civil Engineering and Management, Vol. XI No. 3, pp. 193-202.
    • (2005) Journal of Civil Engineering and Management , vol.XI , Issue.3 , pp. 193-202
    • Nowak, M.1
  • 47
    • 0004774101 scopus 로고
    • Selection of an automated inspection system using multiattribute decision analysis
    • ()“”-
    • Pandey, P.C. and Kengpol, A. (1995), “Selection of an automated inspection system using multiattribute decision analysis”, International Journal of Production Economics, Vol. 39, pp. 289-98.
    • (1995) International Journal of Production Economics , vol.39 , pp. 289-298
    • Pandey, P.C.1    Kengpol, A.2
  • 48
    • 33645151641 scopus 로고    scopus 로고
    • The a posteriori decision in multiobjective optimization problems with smarts, Promethee II, and a fuzzy algorithm
    • ()“”-
    • Parreiras, R.O., Maciel, J.H.R.D. and Vasconcelos, J.A. (2006), “The a posteriori decision in multiobjective optimization problems with smarts, Promethee II, and a fuzzy algorithm”, IEEE Transactions on Magnetics, Vol. 42 No. 4, pp. 1139-42.
    • (2006) IEEE Transactions on Magnetics , vol.42 , Issue.4 , pp. 1139-1142
    • Parreiras, R.O.1    Maciel, J.H.R.D.2    Vasconcelos, J.A.3
  • 49
    • 31444438368 scopus 로고    scopus 로고
    • Application of lean visual process management tools
    • ()“”-
    • Parry, G.C. and Turner, C.E. (2006), “Application of lean visual process management tools”, Production Planning & Control, Vol. 17 No. 1, pp. 77-86.
    • (2006) Production Planning & Control , vol.17 , Issue.1 , pp. 77-86
    • Parry, G.C.1    Turner, C.E.2
  • 50
    • 84954479566 scopus 로고    scopus 로고
    • PROMETHEE-i selecting the best simulation model configuration based on multiple performance measures
    • VerbraeckA.HlupicV.()“”in(Eds) www-lih.univ-lehavre.fr/Intranet/proceedings/ESS2003/PDF/METH03.pdf (accessed 15 June 2007).
    • Pastijn, H., van Utterbeeck, F. and van Loock, R. (2003), “PROMETHEE-i selecting the best simulation model configuration based on multiple performance measures”, in Verbraeck, A. and Hlupic, V. (Eds), Proceedings of 15th European Simulation Symposium, available at: www-lih.univ-lehavre.fr/Intranet/proceedings/ESS2003/PDF/METH03.pdf (accessed 15 June 2007).
    • (2003) Proceedings of 15th European Simulation Symposium
    • Pastijn, H.1    van Utterbeeck, F.2    van Loock, R.3
  • 51
    • 0026242657 scopus 로고
    • The use of the PROMETHEE method in the location choice of a production system
    • ()“”-
    • Pavic, I. and Babic, Z. (1991), “The use of the PROMETHEE method in the location choice of a production system”, International Journal of Production Economics, Vol. 23, pp. 165-74.
    • (1991) International Journal of Production Economics , vol.23 , pp. 165-174
    • Pavic, I.1    Babic, Z.2
  • 52
    • 0032710005 scopus 로고    scopus 로고
    • Multicriterion decision making in river basin planning and development
    • ()“”-
    • Raju, K.S. and Pillai, C.R.S. (1999), “Multicriterion decision making in river basin planning and development”, European Journal of Operational Research, Vol. 112, pp. 249-57.
    • (1999) European Journal of Operational Research , vol.112 , pp. 249-257
    • Raju, K.S.1    Pillai, C.R.S.2
  • 53
    • 77954221293 scopus 로고    scopus 로고
    • Promethee II for selection of carrier in supply chain
    • ()“”-
    • Routroy, S. and Kodali, R. (2007), “Promethee II for selection of carrier in supply chain”, Icfai Journal of Supply Chain Management, Vol. 4 No. 1, pp. 29-39.
    • (2007) Icfai Journal of Supply Chain Management , vol.4 , Issue.1 , pp. 29-39
    • Routroy, S.1    Kodali, R.2
  • 54
    • 0002965657 scopus 로고
    • How outranking relation helps multiple criteria decision making
    • CochraneJ.L.ZelenyM.()“”in(Eds)University of South Carolina PressColumbiaSC:
    • Roy, B. (1973), “How outranking relation helps multiple criteria decision making”, in Cochrane, J.L. and Zeleny, M. (Eds), Multiple Criteria Decision Making, University of South Carolina Press, Columbia, SC.
    • (1973) Multiple Criteria Decision Making
    • Roy, B.1
  • 56
    • 27844589388 scopus 로고    scopus 로고
    • Application of value stream mapping for lean operations and cycle time reduction: an Indian case study
    • ()“”-
    • Seth, D. and Gupta, N. (2005), “Application of value stream mapping for lean operations and cycle time reduction: an Indian case study”, Production Planning & Control, Vol. 16 No. 1, pp. 44-59.
    • (2005) Production Planning & Control , vol.16 , Issue.1 , pp. 44-59
    • Seth, D.1    Gupta, N.2
  • 57
    • 0037357671 scopus 로고    scopus 로고
    • Lean manufacturing: context, practice bundles, and performance
    • ()“”-
    • Shah, R. and Ward, P.T. (2003), “Lean manufacturing: context, practice bundles, and performance”, Journal of Operations Management, Vol. 21, pp. 129-49.
    • (2003) Journal of Operations Management , vol.21 , pp. 129-149
    • Shah, R.1    Ward, P.T.2
  • 58
    • 33644598208 scopus 로고    scopus 로고
    • Manufacturing excellence through TPM implementation: a practical analysis
    • ()“”-
    • Sharma, R.K., Kumar, D. and Kumar, P. (2006), “Manufacturing excellence through TPM implementation: a practical analysis”, Industrial Management & Data Systems, Vol. 106 No. 2, pp. 256-80.
    • (2006) Industrial Management & Data Systems , vol.106 , Issue.2 , pp. 256-280
    • Sharma, R.K.1    Kumar, D.2    Kumar, P.3
  • 61
    • 29144481648 scopus 로고    scopus 로고
    • Could lean production job design be intrinsically motivating? Contextual, configurational and levels-of analysis issues
    • ()“”-
    • Treville, S.D. and Antonakis, J. (2006), “Could lean production job design be intrinsically motivating? Contextual, configurational and levels-of analysis issues”, Journal of Operations Management, Vol. 24, pp. 99-123.
    • (2006) Journal of Operations Management , vol.24 , pp. 99-123
    • Treville, S.D.1    Antonakis, J.2
  • 62
    • 2342650302 scopus 로고    scopus 로고
    • A model to determine the cleanliness measurement interval in an automotive paint shop
    • ()“”-
    • Waeyenbergh, G., Vannieuwenhuyse, B. and Pintelon, L. (2004), “A model to determine the cleanliness measurement interval in an automotive paint shop”, Journal of Quality in Maintenance Engineering, Vol. 10 No. 1, pp. 37-46.
    • (2004) Journal of Quality in Maintenance Engineering , vol.10 , Issue.1 , pp. 37-46
    • Waeyenbergh, G.1    Vannieuwenhuyse, B.2    Pintelon, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.