메뉴 건너뛰기




Volumn 37, Issue 4, 2010, Pages 630-639

Solving a comprehensive model for multiobjective project portfolio selection

Author keywords

Metaheuristic methods; Multiobjective decision making; Nonlinear binary models; Portfolio project selection; Scheduling

Indexed keywords

APRIORI; BINARY PROGRAMMING MODELS; COMPREHENSIVE MODEL; COMPUTATIONAL EXPERIMENT; DECISION MAKERS; EFFICIENT PORTFOLIO; HEURISTIC APPROACH; IN-LINE; METAHEURISTIC; METAHEURISTIC METHODS; MULTI OBJECTIVE; MULTIOBJECTIVE DECISION-MAKING; MULTIPLE OBJECTIVES; NONLINEAR BINARY MODELS; PORTFOLIO PROJECT SELECTION; PROJECT PORTFOLIO; PROJECT PORTFOLIO SELECTION; RESOURCE AVAILABILITY; RESOURCE CONSTRAINT; SCATTER SEARCH;

EID: 70350571119     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2009.06.012     Document Type: Article
Times cited : (155)

References (38)
  • 1
    • 0032627750 scopus 로고    scopus 로고
    • A zero-one model for project portfolio selection and scheduling
    • Ghasemzadeh F., Archer N., and Iyogun P. A zero-one model for project portfolio selection and scheduling. J Oper Res Soc 50 7 (1999) 745-755
    • (1999) J Oper Res Soc , vol.50 , Issue.7 , pp. 745-755
    • Ghasemzadeh, F.1    Archer, N.2    Iyogun, P.3
  • 4
    • 0021458579 scopus 로고
    • Economic models for R and D project selection in the presence of project interactions
    • Fox G.E., Baker N.R., and Bryant J.L. Economic models for R and D project selection in the presence of project interactions. Manage Sci 30 (1984) 890-902
    • (1984) Manage Sci , vol.30 , pp. 890-902
    • Fox, G.E.1    Baker, N.R.2    Bryant, J.L.3
  • 5
    • 0035994941 scopus 로고    scopus 로고
    • A portfolio-evaluation framework for selecting R&D projects
    • Chien C. A portfolio-evaluation framework for selecting R&D projects. R&D Manage 32 4 (2002) 359-368
    • (2002) R&D Manage , vol.32 , Issue.4 , pp. 359-368
    • Chien, C.1
  • 6
    • 0033423721 scopus 로고    scopus 로고
    • Research and development project selection and resource allocation: a review of quantitative modelling approaches
    • Heidenberger K., and Stummer C. Research and development project selection and resource allocation: a review of quantitative modelling approaches. Int J Manage Rev 1 (1999) 197-224
    • (1999) Int J Manage Rev , vol.1 , pp. 197-224
    • Heidenberger, K.1    Stummer, C.2
  • 7
    • 0032637622 scopus 로고    scopus 로고
    • A practical R&D project-selection scoring tool
    • DePiante A., and Jensen A. A practical R&D project-selection scoring tool. IEEE Trans Eng Manage 46 2 (1999) 158-170
    • (1999) IEEE Trans Eng Manage , vol.46 , Issue.2 , pp. 158-170
    • DePiante, A.1    Jensen, A.2
  • 8
    • 10844287885 scopus 로고    scopus 로고
    • An R&D options selection model for investment decisions
    • Coldrick S., Longhurst P., Ivey P.C., and Hannis J. An R&D options selection model for investment decisions. Technovation 25 3 (2005) 185-193
    • (2005) Technovation , vol.25 , Issue.3 , pp. 185-193
    • Coldrick, S.1    Longhurst, P.2    Ivey, P.C.3    Hannis, J.4
  • 9
    • 26444479147 scopus 로고    scopus 로고
    • Developing a project evaluation system based on multiple attribute value theory
    • Duarte B.P.M., and Reis A. Developing a project evaluation system based on multiple attribute value theory. Comput Oper Res 33 5 (2006) 1488-1504
    • (2006) Comput Oper Res , vol.33 , Issue.5 , pp. 1488-1504
    • Duarte, B.P.M.1    Reis, A.2
  • 10
    • 0028483367 scopus 로고
    • Prioritizing telecommunications technologies for long-range R&D scheduling to the year 2006
    • Suh C., Suh E., and Baek K. Prioritizing telecommunications technologies for long-range R&D scheduling to the year 2006. IEEE Trans Eng Manage 41 3 (1994) 264-275
    • (1994) IEEE Trans Eng Manage , vol.41 , Issue.3 , pp. 264-275
    • Suh, C.1    Suh, E.2    Baek, K.3
  • 11
    • 0027694293 scopus 로고
    • A model for R&D project selection with combined benefit, outcome and resource interactions
    • Schmidt R.T. A model for R&D project selection with combined benefit, outcome and resource interactions. IEEE Trans Eng Manage 40 4 (1993) 403-410
    • (1993) IEEE Trans Eng Manage , vol.40 , Issue.4 , pp. 403-410
    • Schmidt, R.T.1
  • 12
    • 0035517620 scopus 로고    scopus 로고
    • Technology portfolio management: optimizing interdependent projects over multiple time periods
    • Dickinson M.W., Thornton A.C., and Graves S. Technology portfolio management: optimizing interdependent projects over multiple time periods. IEEE Trans Eng Manage 48 4 (2001) 518-527
    • (2001) IEEE Trans Eng Manage , vol.48 , Issue.4 , pp. 518-527
    • Dickinson, M.W.1    Thornton, A.C.2    Graves, S.3
  • 13
    • 28044468662 scopus 로고    scopus 로고
    • Project priorization under policy constraints. A combination of MCDA with 0-1 programming
    • Mavrotas G., Diakoulaki D., and Caloghirou Y. Project priorization under policy constraints. A combination of MCDA with 0-1 programming. Eur J Oper Res 171 (2006) 296-308
    • (2006) Eur J Oper Res , vol.171 , pp. 296-308
    • Mavrotas, G.1    Diakoulaki, D.2    Caloghirou, Y.3
  • 14
    • 0025480934 scopus 로고
    • Scheduling models for research and development
    • Weber R., Werners B., and Zimmermann H.J. Scheduling models for research and development. Eur J Oper Res 48 (1990) 175-188
    • (1990) Eur J Oper Res , vol.48 , pp. 175-188
    • Weber, R.1    Werners, B.2    Zimmermann, H.J.3
  • 15
    • 0030574822 scopus 로고    scopus 로고
    • A decision model for interdependent information system project selection
    • Santhanam R., and Kyparisis J. A decision model for interdependent information system project selection. Eur J Oper Res 89 2 (1996) 380-399
    • (1996) Eur J Oper Res , vol.89 , Issue.2 , pp. 380-399
    • Santhanam, R.1    Kyparisis, J.2
  • 16
    • 0034060740 scopus 로고    scopus 로고
    • Using analytic network process and goal programming for interdependent information system project selection
    • Lee J.W., and Kim S.H. Using analytic network process and goal programming for interdependent information system project selection. Comput Oper Res 27 4 (2000) 367-382
    • (2000) Comput Oper Res , vol.27 , Issue.4 , pp. 367-382
    • Lee, J.W.1    Kim, S.H.2
  • 17
    • 0035254107 scopus 로고    scopus 로고
    • An integrated approach for interdependent information system project selection
    • Lee J.W., and Kim S.H. An integrated approach for interdependent information system project selection. Int J Project Manage 19 2 (2001) 111-118
    • (2001) Int J Project Manage , vol.19 , Issue.2 , pp. 111-118
    • Lee, J.W.1    Kim, S.H.2
  • 18
    • 0037118778 scopus 로고    scopus 로고
    • Decision support system for multicriterial R&D and information systems projects selection
    • Klapka J., and Piños P. Decision support system for multicriterial R&D and information systems projects selection. Eur J Oper Res 140 2 (2002) 434-446
    • (2002) Eur J Oper Res , vol.140 , Issue.2 , pp. 434-446
    • Klapka, J.1    Piños, P.2
  • 19
    • 0037934558 scopus 로고    scopus 로고
    • Interactive R&D portfolio analysis with project interdependencies and time profiles of multiple objectives
    • Stummer C., and Heidenberger K. Interactive R&D portfolio analysis with project interdependencies and time profiles of multiple objectives. IEEE Trans Eng Manage 50 2 (2003) 175-183
    • (2003) IEEE Trans Eng Manage , vol.50 , Issue.2 , pp. 175-183
    • Stummer, C.1    Heidenberger, K.2
  • 20
    • 0029394681 scopus 로고
    • A multiple criteria decision model for information system project selection
    • Santhanam R., and Kyparisis J. A multiple criteria decision model for information system project selection. Comput Oper Res 22 8 (1995) 807-818
    • (1995) Comput Oper Res , vol.22 , Issue.8 , pp. 807-818
    • Santhanam, R.1    Kyparisis, J.2
  • 21
    • 14544305571 scopus 로고    scopus 로고
    • A packing-multiple-boxes model for R&D project selection and scheduling
    • Sun H., and Ma T. A packing-multiple-boxes model for R&D project selection and scheduling. Technovation 25 11 (2005) 1355-1361
    • (2005) Technovation , vol.25 , Issue.11 , pp. 1355-1361
    • Sun, H.1    Ma, T.2
  • 22
    • 38449095077 scopus 로고    scopus 로고
    • A multiobjective model for the selection and timing of public enterprise projects
    • Medaglia A.L., Hueth D., Mendieta J.C., and Sefair J.A. A multiobjective model for the selection and timing of public enterprise projects. Soc-Econ Sched Sci 42 1 (2008) 31-45
    • (2008) Soc-Econ Sched Sci , vol.42 , Issue.1 , pp. 31-45
    • Medaglia, A.L.1    Hueth, D.2    Mendieta, J.C.3    Sefair, J.A.4
  • 23
    • 0037310147 scopus 로고    scopus 로고
    • Optimising strategic information system development
    • Wainwright C., Reynolds K., and Argument L. Optimising strategic information system development. J Bus Res 56 (2003) 127-134
    • (2003) J Bus Res , vol.56 , pp. 127-134
    • Wainwright, C.1    Reynolds, K.2    Argument, L.3
  • 25
    • 31144478297 scopus 로고    scopus 로고
    • Pareto ant colony optimization with ILP preprocessing in multiobjetive project portfolio selection
    • Doerner K.F., Gutjahr W.J., Hartl R.F., Strauss C., and Stummer C. Pareto ant colony optimization with ILP preprocessing in multiobjetive project portfolio selection. Eur J Oper Res 171 3 (2006) 830-841
    • (2006) Eur J Oper Res , vol.171 , Issue.3 , pp. 830-841
    • Doerner, K.F.1    Gutjahr, W.J.2    Hartl, R.F.3    Strauss, C.4    Stummer, C.5
  • 26
    • 0033177631 scopus 로고    scopus 로고
    • An integrated framework for project selection
    • Archer N.P., and Ghasemzadeh F. An integrated framework for project selection. Int J Project Manage 17 4 (1999) 207-216
    • (1999) Int J Project Manage , vol.17 , Issue.4 , pp. 207-216
    • Archer, N.P.1    Ghasemzadeh, F.2
  • 27
    • 0001322778 scopus 로고    scopus 로고
    • A survey and annotated bibliography of multiobjective combinatorial optimization
    • Ehrgott M., and Gandibleux X. A survey and annotated bibliography of multiobjective combinatorial optimization. OR Spektrum 22 (2000) 425-460
    • (2000) OR Spektrum , vol.22 , pp. 425-460
    • Ehrgott, M.1    Gandibleux, X.2
  • 28
    • 0030081775 scopus 로고    scopus 로고
    • R&D project selection and scheduling with a filtered beam search approach
    • Coffin M.A., and Taylor B.W. R&D project selection and scheduling with a filtered beam search approach. IIE Trans 28 2 (1996) 167-176
    • (1996) IIE Trans , vol.28 , Issue.2 , pp. 167-176
    • Coffin, M.A.1    Taylor, B.W.2
  • 29
    • 1842484493 scopus 로고    scopus 로고
    • Genetic algorithm for optimization of infrastructure investment under time-resource constraints
    • Hsieh T., and Liu H. Genetic algorithm for optimization of infrastructure investment under time-resource constraints. Comput-Aided Civil Infrastruct Eng 19 (2004) 203-212
    • (2004) Comput-Aided Civil Infrastruct Eng , vol.19 , pp. 203-212
    • Hsieh, T.1    Liu, H.2
  • 30
    • 33846027145 scopus 로고    scopus 로고
    • A multiobjective evolutionary approach for linearly constrained project selection under uncertainty
    • Medaglia A.L., Graves B.S., and Ringuest J.L. A multiobjective evolutionary approach for linearly constrained project selection under uncertainty. Eur J Oper Res 179 3 (2007) 869-894
    • (2007) Eur J Oper Res , vol.179 , Issue.3 , pp. 869-894
    • Medaglia, A.L.1    Graves, B.S.2    Ringuest, J.L.3
  • 31
    • 24644495446 scopus 로고    scopus 로고
    • Approximative solution methods for multiobjective combinatorial optimization
    • Ehrgott M., and Gandibleux X. Approximative solution methods for multiobjective combinatorial optimization. T.O.P. 12 1 (2004) 1-63
    • (2004) T.O.P. , vol.12 , Issue.1 , pp. 1-63
    • Ehrgott, M.1    Gandibleux, X.2
  • 32
    • 43649104172 scopus 로고    scopus 로고
    • SSPMO: a scatter Tabu Search procedure for non-linear multiobjective optimization
    • Molina J., Laguna M., Martí R., and Caballero R. SSPMO: a scatter Tabu Search procedure for non-linear multiobjective optimization. INFORMS Journal on Computing 19 1 (2007) 91-100
    • (2007) INFORMS Journal on Computing , vol.19 , Issue.1 , pp. 91-100
    • Molina, J.1    Laguna, M.2    Martí, R.3    Caballero, R.4
  • 34
    • 0037116761 scopus 로고    scopus 로고
    • Multiobjective metaheuristics: an overview of the current state of the art
    • Jones D.F., Mirrazavi S.K., and Tamiz M. Multiobjective metaheuristics: an overview of the current state of the art. Eur J Oper Res 137 (2002) 1-9
    • (2002) Eur J Oper Res , vol.137 , pp. 1-9
    • Jones, D.F.1    Mirrazavi, S.K.2    Tamiz, M.3
  • 37
    • 0004140075 scopus 로고    scopus 로고
    • SPEA2: Improving the strength pareto evolutionary algorithm
    • Technical report 103, Computer Engineering and Networks Laboratory (TIK, Swiss Federal Institute of Technology ETH, Zurich, Switzerland
    • Zitzler E, Laumanns M, Thiele L. SPEA2: improving the strength pareto evolutionary algorithm. Technical report 103, Computer Engineering and Networks Laboratory (TIK), Swiss Federal Institute of Technology (ETH), Zurich, Switzerland, 2001.
    • (2001)
    • Zitzler, E.1    Laumanns, M.2    Thiele, L.3
  • 38
    • 0004215426 scopus 로고    scopus 로고
    • Kluwer Academic Publishers, Boston
    • Glover F., and Laguna M. Tabú search (1997), Kluwer Academic Publishers, Boston
    • (1997) Tabú search
    • Glover, F.1    Laguna, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.