메뉴 건너뛰기




Volumn 111, Issue 1, 1998, Pages 129-141

Using tabu search to schedule activities of stochastic resource-constrained projects

Author keywords

Project management; Scheduling theory; Tabu search

Indexed keywords

HEURISTIC METHODS; RANDOM PROCESSES; RESOURCE ALLOCATION;

EID: 0032210453     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(97)00311-1     Document Type: Article
Times cited : (88)

References (17)
  • 2
    • 0029393209 scopus 로고
    • A survey on the resource-constrained project scheduling problem
    • L. Ozdamar, G. Ulusoy, A survey on the resource-constrained project scheduling problem, IIE Transactions 27 (1995) 574-586.
    • (1995) IIE Transactions , vol.27 , pp. 574-586
    • Ozdamar, L.1    Ulusoy, G.2
  • 3
    • 84970257715 scopus 로고
    • A simulation approach to PERT network analysis
    • A.B. Badiru, A simulation approach to PERT network analysis, Simulation 57 (1991) 245-255.
    • (1991) Simulation , vol.57 , pp. 245-255
    • Badiru, A.B.1
  • 5
    • 0026822242 scopus 로고
    • An iterative scheduling technique for resource constrained project scheduling
    • K.Y. Li, R.J. Willis, An iterative scheduling technique for resource constrained project scheduling, European Journal of Operational Research 56 (1992) 370-379.
    • (1992) European Journal of Operational Research , vol.56 , pp. 370-379
    • Li, K.Y.1    Willis, R.J.2
  • 6
    • 0009596408 scopus 로고    scopus 로고
    • Using combinations of heuristics to schedule activities of constrained multiple resource projects
    • L.C. Morse, J.O. McIntosh, G.E. Whitehouse, Using combinations of heuristics to schedule activities of constrained multiple resource projects, Project Management Journal (1996) 34-40.
    • (1996) Project Management Journal , pp. 34-40
    • Morse, L.C.1    McIntosh, J.O.2    Whitehouse, G.E.3
  • 7
    • 0021460636 scopus 로고
    • A comparison of exact procedures for solving the multiple constrained resource project scheduling problem
    • J. Patterson, A comparison of exact procedures for solving the multiple constrained resource project scheduling problem, Management Science 30 (1984) 854-867.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.1
  • 10
    • 0002703574 scopus 로고
    • Tabu search: A tutorial
    • F. Glover, Tabu search: a tutorial, Interfaces 20 (1990) 74-94.
    • (1990) Interfaces , vol.20 , pp. 74-94
    • Glover, F.1
  • 11
    • 0029252988 scopus 로고
    • A tabu search algorithm for the resource constrained assignment problem
    • A.P. Punnen, Y.P. Aneja, A tabu search algorithm for the resource constrained assignment problem, Journal of the Operational Research Society 46 (1995) 214-220.
    • (1995) Journal of the Operational Research Society , vol.46 , pp. 214-220
    • Punnen, A.P.1    Aneja, Y.P.2
  • 12
    • 0001997908 scopus 로고
    • Tabu search applied to quadratic assignment problem
    • F. Skorin-Kapov, Tabu search applied to quadratic assignment problem, ORSA Journal of Computing 2 (1990) 33-45.
    • (1990) ORSA Journal of Computing , vol.2 , pp. 33-45
    • Skorin-Kapov, F.1
  • 13
    • 0022883022 scopus 로고
    • The general employee scheduling problem: An integration of management science and artificial intelligence
    • F. Glover, C. McMillan, The general employee scheduling problem: an integration of management science and artificial intelligence, Computer and Operations Research 13 (1986) 563-593.
    • (1986) Computer and Operations Research , vol.13 , pp. 563-593
    • Glover, F.1    McMillan, C.2
  • 16
    • 85033912983 scopus 로고    scopus 로고
    • Working Paper No. 96-131, Department of Industrial and Manufacturing Systems Engineering, Iowa State University, IA
    • Y. Tsai, D.D. Gemmill, Identifying the critical path in resource constrained projects, Working Paper No. 96-131, Department of Industrial and Manufacturing Systems Engineering, Iowa State University, IA, 1996.
    • (1996) Identifying the Critical Path in Resource Constrained Projects
    • Tsai, Y.1    Gemmill, D.D.2
  • 17
    • 85033923834 scopus 로고    scopus 로고
    • Using a simulated annealing algorithm to schedule activities of resource-constrained projects
    • Working Paper No. 96-124, Department of Industrial and Manufacturing Systems Engineering, Iowa State University, IA, to appear
    • Y. Tsai, D.D. Gemmill, Using a simulated annealing algorithm to schedule activities of resource-constrained projects, Working Paper No. 96-124, Department of Industrial and Manufacturing Systems Engineering, Iowa State University, IA, 1996, Project Management Journal, to appear.
    • (1996) Project Management Journal
    • Tsai, Y.1    Gemmill, D.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.