-
1
-
-
0041805006
-
Automated generation of work spaces required by construction activities
-
DOI 10.1061/(ASCE)0733-9364(2002)128:4(306)
-
Akinci, B., Fischer, M., and Kunz, J. (2002). " Automated generation of work spaces required by construction activities." J. Constr. Eng. Manage. 0733-9364, 128 (4), 306-315. 10.1061/(ASCE)0733-9364(2002)128:4(306) (Pubitemid 40265535)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 306-315
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
-
2
-
-
33746350454
-
Integrating 3D visualization and simulation for tower crane operations on construction sites
-
DOI 10.1016/j.autcon.2005.07.007, PII S0926580505000993
-
Al-Hussein, M., Niaz, M. A., Yu, H., and Kim, H. (2006). " Integrating 3D visualization and simulation for tower crane operations on construction sites." Autom. Constr. 0926-5805, 15 (5), 554-562. 10.1016/j.autcon.2005.07.007 (Pubitemid 44118725)
-
(2006)
Automation in Construction
, vol.15
, Issue.5
, pp. 554-562
-
-
Al-Hussein, M.1
Athar Niaz, M.2
Yu, H.3
Kim, H.4
-
3
-
-
45749120776
-
Generating, evaluating, and visualizing construction schedule with geographic information systems
-
0887-3801, 10.1061/(ASCE)0887-3801(2008)22:4(233)
-
Bansal, V. K., and Pal, M. (2008). " Generating, evaluating, and visualizing construction schedule with geographic information systems." J. Comput. Civ. Eng. 0887-3801, 22 (4), 233-242. 10.1061/(ASCE)0887-3801(2008)22: 4(233)
-
(2008)
J. Comput. Civ. Eng.
, vol.22
, Issue.4
, pp. 233-242
-
-
Bansal, V.K.1
Pal, M.2
-
4
-
-
13944251393
-
Four-dimensional visualization of construction scheduling and site utilization
-
DOI 10.1061/(ASCE)0733-9364(2004)130:4(598)
-
Chau, K. W., Anson, M., and Zhang, J. P. (2004). " Four-dimensional visualization of construction scheduling and site utilization." J. Constr. Eng. Manage. 0733-9364, 130 (4), 598-606. 10.1061/(ASCE)0733-9364(2004)130: 4(598) (Pubitemid 40265357)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.4
, pp. 598-606
-
-
Chau, K.W.1
Anson, M.2
Zhang, J.P.3
-
5
-
-
39349114541
-
RFID+4D CAD for progress management of structural steel works in high-rise buildings
-
DOI 10.1061/(ASCE)0887-3801(2008)22:2(74)
-
Chin, S., Yoon, S., Choi, C., and Cho, C. (2008). " RFID+4D CAD for progress management of structural steel works in high-rise buildings." J. Comput. Civ. Eng. 0887-3801, 22 (2), 74-89. 10.1061/(ASCE)0887-3801(2008)22: 2(74) (Pubitemid 351264006)
-
(2008)
Journal of Computing in Civil Engineering
, vol.22
, Issue.2
, pp. 74-89
-
-
Chin, S.1
Yoon, S.2
Choi, C.3
Cho, C.4
-
6
-
-
33746778753
-
Construction workspace planning: Assignment and analysis utilizing 4D visualization technologies
-
DOI 10.1111/j.1467-8667.2006.00454.x
-
Dawood, N., and Mallasi, Z. (2006). " Construction workspace planning: Assignment and analysis utilizing 4D visualization technologies." Comput. Aided Civ. Infrastruct. Eng. 1093-9687, 21 (7), 498-513. 10.1111/j.1467-8667.2006.00454.x (Pubitemid 44165263)
-
(2006)
Computer-Aided Civil and Infrastructure Engineering
, vol.21
, Issue.7
, pp. 498-513
-
-
Dawood, N.1
Mallasi, Z.2
-
7
-
-
0037332742
-
Development of an integrated information resource base for 4D/VR construction processes simulation
-
DOI 10.1016/S0926-5805(02)00045-6, PII S0926580502000456
-
Dawood, N., Sriprasert, E., Mallasi, Z., and Hobbs, B. (2003). " Development of an integrated information resource base for 4D/VR construction processes simulation." Autom. Constr. 0926-5805, 12 (2), 123-131. 10.1016/S0926-5805(02)00045-6 (Pubitemid 35349796)
-
(2003)
Automation in Construction
, vol.12
, Issue.2
, pp. 123-131
-
-
Dawood, N.1
Sriprasert, E.2
Mallasi, Z.3
Hobbs, B.4
-
8
-
-
85103590248
-
A kinematic notation for lower-pair mechanism based on matrices
-
0021-8936.
-
Denavit, J., and Hartenberg, R. S. (1955). " A kinematic notation for lower-pair mechanism based on matrices." J. Appl. Mech. 0021-8936, 22, 215-221.
-
(1955)
J. Appl. Mech.
, vol.22
, pp. 215-221
-
-
Denavit, J.1
Hartenberg, R.S.2
-
9
-
-
70350060197
-
Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs
-
0887-3801, 10.1061/(ASCE)0887-3801(2009)23:6(391)
-
Golparvar-Fard, M., Pea-Mora, F., Arboleda, C. A., and Lee, S. (2009). " Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs." J. Comput. Civ. Eng. 0887-3801, 23 (6), 391-404. 10.1061/(ASCE)0887-3801(2009)23:6(391)
-
(2009)
J. Comput. Civ. Eng.
, vol.23
, Issue.6
, pp. 391-404
-
-
Golparvar-Fard, M.1
Pea-Mora, F.2
Arboleda, C.A.3
Lee, S.4
-
10
-
-
0004172988
-
-
2nd Ed., Wiley, New York.
-
Halpin, D. W., and Woodhead, R. W. (1998). Construction management, 2nd Ed., Wiley, New York.
-
(1998)
Construction Management
-
-
Halpin, D.W.1
Woodhead, R.W.2
-
11
-
-
51849088974
-
Areas of application for 3D and 4D models on construction projects
-
0733-9364, 10.1061/(ASCE)0733-9364(2008)134:10(776)
-
Hartman, T., Gao, J., and Fischer, M. (2008). " Areas of application for 3D and 4D models on construction projects." J. Constr. Eng. Manage. 0733-9364, 134 (10), 776-785. 10.1061/(ASCE)0733-9364(2008)134:10(776)
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.10
, pp. 776-785
-
-
Hartman, T.1
Gao, J.2
Fischer, M.3
-
12
-
-
33846023352
-
A method for planning of work-flow by combined use of location-based scheduling and 4D CAD
-
DOI 10.1016/j.autcon.2006.04.001, PII S0926580506000161
-
Jongeling, R., and Olofsson, T. (2007). " A method for planning of work-flow by combined use of location-based scheduling and 4D CAD." Autom. Constr. 0926-5805, 16 (2), 189-198. 10.1016/j.autcon.2006.04.001 (Pubitemid 46053762)
-
(2007)
Automation in Construction
, vol.16
, Issue.2
, pp. 189-198
-
-
Jongeling, R.1
Olofsson, T.2
-
13
-
-
34848867519
-
Generic representation of 3D motion paths in dynamic animations of simulated construction processes
-
DOI 10.1016/j.autcon.2007.04.002, PII S092658050700060X
-
Kamat, V. R., and Martinez, J. C. (2008). " Generic representation of 3D motion paths in dynamic animations of simulated construction processes." Autom. Constr. 0926-5805, 17 (2), 188-200. 10.1016/j.autcon. 2007.04.002 (Pubitemid 47489769)
-
(2008)
Automation in Construction
, vol.17
, Issue.2
, pp. 188-200
-
-
Kamat, V.R.1
Martinez, J.C.2
-
14
-
-
34248575853
-
Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling
-
DOI 10.1061/(ASCE)0733-9364(2007)133:6(447)
-
Kang, J. H., Anderson, S. D., and Clayton, M. J. (2007a). " Empirical study on the merit of web-based 3D visualization in collaborative construction planning and scheduling." J. Constr. Eng. Manage. 0733-9364, 133 (6), 447-461. 10.1061/(ASCE)0733-9364(2007)133:6(447) (Pubitemid 46753484)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.6
, pp. 447-461
-
-
Kang, J.H.1
Anderson, S.D.2
Clayton, M.J.3
-
15
-
-
78650357656
-
Development of virtual reality functions for visualizing concept design information for civil engineering projects
-
Kang, L. S., Moon, J. S., and Kwon, J. H. (2007b). " Development of virtual reality functions for visualizing concept design information for civil engineering projects." Korean Journal of Civil Engineering, 27, 759-765.
-
(2007)
Korean Journal of Civil Engineering
, vol.27
, pp. 759-765
-
-
Kang, L.S.1
Moon, J.S.2
Kwon, J.H.3
-
16
-
-
33744547057
-
Planning and visualization for automated robotic crane erection processes in construction
-
DOI 10.1016/j.autcon.2005.06.008, PII S0926580505000713
-
Kang, S., and Miranda, E. (2006). " Planning and visualization for automated robotic crane erection processes in construction." Autom. Constr. 0926-5805, 15 (4), 398-414. 10.1016/j.autcon.2005.06.008 (Pubitemid 43817503)
-
(2006)
Automation in Construction
, vol.15
, Issue.4
, pp. 398-414
-
-
Kang, S.1
Miranda, E.2
-
17
-
-
0034227635
-
Feasibility study of 4D CAD in commercial construction
-
0733-9364, 10.1061/(ASCE)0733-9364(2000)126:4(251)
-
Koo, B., and Fischer, M. (2000). " Feasibility study of 4D CAD in commercial construction." J. Constr. Eng. Manage. 0733-9364, 126 (4), 251-260. 10.1061/(ASCE)0733-9364(2000)126:4(251)
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.4
, pp. 251-260
-
-
Koo, B.1
Fischer, M.2
-
18
-
-
67449135877
-
Collision detection strategies for virtual construction simulation
-
0926-5805, 10.1016/j.autcon.2009.02.006
-
Lai, K.-C., and Kang, S.-C. (2009). " Collision detection strategies for virtual construction simulation." Autom. Constr. 0926-5805, 18 (6), 724-736. 10.1016/j.autcon.2009.02.006
-
(2009)
Autom. Constr.
, vol.18
, Issue.6
, pp. 724-736
-
-
Lai, K.-C.1
Kang, S.-C.2
-
19
-
-
13244275240
-
Application of 4D for dynamic site layout and management of construction projects
-
DOI 10.1016/j.autcon.2004.08.011, PII S0926580504001104, International Conference for Construction Information Technology
-
Ma, Z., Shen, Q., and Zhang, J. (2005). " Application of 4D for dynamic site layout and management of construction projects." Autom. Constr. 0926-5805, 14 (3), 369-381. 10.1016/j.autcon.2004.08.011 (Pubitemid 40183428)
-
(2005)
Automation in Construction
, vol.14
, Issue.3
, pp. 369-381
-
-
Ma, Z.1
Shen, Q.2
Zhang, J.3
-
20
-
-
70350053404
-
Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction
-
0733-9364, 10.1061/(ASCE)CO.1943-7862.0000101
-
Park, T., Kim, M. K., Kim, C., and Kim, H. (2009). " Interactive 3D CAD for effective derrick crane operation in a cable-stayed bridge construction." J. Constr. Eng. Manage. 0733-9364, 135 (11), 1261-1274. 10.1061/(ASCE)CO.1943-7862.0000101
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.11
, pp. 1261-1274
-
-
Park, T.1
Kim, M.K.2
Kim, C.3
Kim, H.4
-
21
-
-
57649149304
-
Visualizing high-rise building construction strategies using linear scheduling and 4D CAD
-
0926-5805, 10.1016/j.autcon.2008.08.001
-
Russell, A., Staub-French, S., Tran, N., and Wong, W. (2009). " Visualizing high-rise building construction strategies using linear scheduling and 4D CAD." Autom. Constr. 0926-5805, 18 (2), 219-236. 10.1016/j.autcon.2008.08.001
-
(2009)
Autom. Constr.
, vol.18
, Issue.2
, pp. 219-236
-
-
Russell, A.1
Staub-French, S.2
Tran, N.3
Wong, W.4
-
22
-
-
42649131324
-
Linear scheduling and 4D visualization
-
DOI 10.1061/(ASCE)0887-3801(2008)22:3(192)
-
Staub-French, S., Russell, A., and Tran, N. (2008). " Linear scheduling and 4D visualization." J. Comput. Civ. Eng. 0887-3801, 22 (3), 192-205. 10.1061/(ASCE)0887-3801(2008)22:3(192) (Pubitemid 351598726)
-
(2008)
Journal of Computing in Civil Engineering
, vol.22
, Issue.3
, pp. 192-205
-
-
Staub-French, S.1
Russell, A.2
Tran, N.3
-
23
-
-
63649124542
-
Transformation of a 4D product and process model to generate motion of mobile cranes
-
0926-5805, 10.1016/j.autcon.2008.10.008
-
Tantisevi, K., and Akinci, B. (2009). " Transformation of a 4D product and process model to generate motion of mobile cranes." Autom. Constr. 0926-5805, 18 (4), 458-468. 10.1016/j.autcon.2008.10.008
-
(2009)
Autom. Constr.
, vol.18
, Issue.4
, pp. 458-468
-
-
Tantisevi, K.1
Akinci, B.2
|