-
1
-
-
0041805006
-
Automated generation of work spaces required by construction activities
-
DOI 10.1061/(ASCE)0733-9364(2002)128:4(306)
-
Akinci, B., Fischer, M., and Kunz, J. (2002). " Automated generation of work spaces required by construction activities.." J. Constr. Eng. Manage. 0733-9364, 128 (4), 306-315. 10.1061/(ASCE)0733-9364(2002)128:4(306) (Pubitemid 40265535)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 306-315
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
-
2
-
-
33746350454
-
Integrating 3D visualization and simulation for tower crane operations on construction sites
-
DOI 10.1016/j.autcon.2005.07.007, PII S0926580505000993
-
Al-Hussein, M., Niazm, M. A., Yu, H., and Kim, H. (2006). " Integrating 3D visualization and simulation for tower crane operations on construction sites.." Autom. Constr. 0926-5805, 15, 554-562. 10.1016/j.autcon.2005.07.007 (Pubitemid 44118725)
-
(2006)
Automation in Construction
, vol.15
, Issue.5
, pp. 554-562
-
-
Al-Hussein, M.1
Athar Niaz, M.2
Yu, H.3
Kim, H.4
-
3
-
-
34250616754
-
Georeferenced registration of construction graphics in mobile outdoor augmented reality
-
DOI 10.1061/(ASCE)0887-3801(2007)21:4(247)
-
Behzadan, A. H., and Kamat, V. R. (2007). " Georeferenced registration of construction graphics in mobile outdoor augmented reality.." J. Comput. Civ. Eng. 0887-3801, 21 (4), 247-258. 10.1061/(ASCE)0887-3801(2007)21:4(247) (Pubitemid 46935006)
-
(2007)
Journal of Computing in Civil Engineering
, vol.21
, Issue.4
, pp. 247-258
-
-
Behzadan, A.H.1
Kamat, V.R.2
-
4
-
-
29044433033
-
Mixed reality-based visualization interfaces for architecture, engineering, and construction industry
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(2005)131:12(1301)
-
Dunston, P. S., and Wang, X. (2005). " Mixed reality-based visualization interfaces for architecture, engineering, and construction industry.." J. Constr. Eng. Manage. 0733-9364, 131 (12), 1301-1309. 10.1061/(ASCE)0733-9364(2005)131:12(1301)
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.12
, pp. 1301-1309
-
-
Dunston, P.S.1
Wang, X.2
-
5
-
-
26644436472
-
Diffusion of computer aided design technology in architectural design practice
-
DOI 10.1061/(ASCE)0733-9364(2005)131:10(1135)
-
Kale, S., and Arditi, D. (2005). " Diffusion of computer aided design technology in architectural design practice.." J. Constr. Eng. Manage. 0733-9364, 131 (10), 1135-1141. 10.1061/(ASCE)0733-9364(2005)131: 10(1135) (Pubitemid 41441437)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.10
, pp. 1135-1141
-
-
Kale, S.1
Arditi, D.2
-
6
-
-
34250680574
-
Evaluation of augmented reality for rapid assessment of earthquake-induced building damage
-
DOI 10.1061/(ASCE)0887-3801(2007)21:5(303)
-
Kamat, V. R., and El-Tawil, S. (2007). " Evaluation of augmented reality for rapid assessment of earthquake-induced building damage.." J. Comput. Civ. Eng. 0887-3801, 21 (5), 303-310. 10.1061/(ASCE)0887-3801(2007)21: 5(303) (Pubitemid 47258905)
-
(2007)
Journal of Computing in Civil Engineering
, vol.21
, Issue.5
, pp. 303-310
-
-
Kamat, V.R.1
El-Tawil, S.2
-
7
-
-
0034227635
-
Feasibility study of 4D CAD in commercial construction
-
DOI 10.1061/(ASCE)0733-9364(2000)126:4(251)
-
Koo, B., and Fisher, M. (2000). " Feasibility study of 4D CAD in commercial construction.." J. Constr. Eng. Manage. 0733-9364, 126 (4), 251-260. 10.1061/(ASCE)0733-9364(2000)126:4(251) (Pubitemid 30897449)
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.4
, pp. 251-260
-
-
Koo, B.1
Fischer, M.2
-
8
-
-
33847127363
-
Constructing a complex precast tilt-up-panel structure utilizing an optimization model, 3D CAD, and animation
-
DOI 10.1061/(ASCE)0733-9364(2007)133:3(199)
-
Manrique, J. D., Al-Hussein, M., Telyas, A., and Funston, G. (2007). " Constructing a complex precast tilt-up-panel structure utilizing an optimization model, 3D CAD, and animation.." J. Constr. Eng. Manage. 0733-9364, 133 (3), 199-207. 10.1061/(ASCE)0733-9364(2007)133:3(199) (Pubitemid 46280985)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.3
, pp. 199-207
-
-
Manrique, J.D.1
Al-Hussein, M.2
Telyas, A.3
Funston, G.4
-
9
-
-
42649131324
-
Linear scheduling and 4D visualization
-
DOI 10.1061/(ASCE)0887-3801(2008)22:3(192)
-
Staub-French, S., Russell, A., and Tran, N. (2008). " Linear scheduling and 4D visualization.." J. Comput. Civ. Eng. 0887-3801, 22 (3), 192-205. 10.1061/(ASCE)0887-3801(2008)22:3(192) (Pubitemid 351598726)
-
(2008)
Journal of Computing in Civil Engineering
, vol.22
, Issue.3
, pp. 192-205
-
-
Staub-French, S.1
Russell, A.2
Tran, N.3
-
10
-
-
0028494558
-
Case study of Burlington cable-stayed bridge
-
" 0733-9364, (),. 10.1061/(ASCE)0733-9364(1994)120:3(649)
-
Swiggum, K. E., Anderson, S. D., and Russell, J. S. (1994). " Case study of Burlington cable-stayed bridge.." J. Constr. Eng. Manage. 0733-9364, 120 (3), 649-666. 10.1061/(ASCE)0733-9364(1994)120:3(649)
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.3
, pp. 649-666
-
-
Swiggum, K.E.1
Anderson, S.D.2
Russell, J.S.3
|