Project micromanagement: practical site planning and management of work flow
-
Bertelsen S., and Formoso C.T. (Eds), Helsingor, Denmark
-
Kenley R. Project micromanagement: practical site planning and management of work flow. In: Bertelsen S., and Formoso C.T. (Eds). IGLC-12, 12th Conference of the International Group for Lean Construction (2004), Helsingor, Denmark 194-205
-
(2004)
IGLC-12, 12th Conference of the International Group for Lean Construction
, pp. 194-205
-
-
Kenley, R.1
-
3
-
-
67349244749
-
An update on last planner
-
Martinez J.C., and Formoso C.T. (Eds), Virginia Tech, Virginia, USA
-
Ballard G., and Howell G. An update on last planner. In: Martinez J.C., and Formoso C.T. (Eds). 11th International Group for Lean Construction Conference (2003), Virginia Tech, Virginia, USA
-
(2003)
11th International Group for Lean Construction Conference
-
-
Ballard, G.1
Howell, G.2
-
4
-
-
33845999537
-
The marriage of CPM and lean construction
-
Martinez J.C., and Formoso C.T. (Eds), Virginia Tech, Virginia, USA
-
Huber B., and Reiser P. The marriage of CPM and lean construction. In: Martinez J.C., and Formoso C.T. (Eds). 11th International Group for Lean Construction Conference (2003), Virginia Tech, Virginia, USA
-
(2003)
11th International Group for Lean Construction Conference
-
-
Huber, B.1
Reiser, P.2
-
5
-
-
33846017624
-
-
R. Akbas, Geometry-based modeling and simulation of construction processes, PhD Thesis, Department of Civil and Environmental Engineering, Stanford University, 2004.
-
-
-
-
6
-
-
0034227635
-
Feasibility study of 4D CAD in commercial construction
-
Koo B., and Fischer M. Feasibility study of 4D CAD in commercial construction. J. Constr. Eng. Manag. 126 (2000) 251-260
-
(2000)
J. Constr. Eng. Manag.
, vol.126
, pp. 251-260
-
-
Koo, B.1
Fischer, M.2
-
7
-
-
33746369824
-
Registering space requirements of construction operations using site-PECASO model
-
Agger K., Christiansson P., and Howard R. (Eds), Aarhus School of Architecture, Denmark
-
Mallasi Z., and Dawood N. Registering space requirements of construction operations using site-PECASO model. In: Agger K., Christiansson P., and Howard R. (Eds). CIB w78 conference 2002 - Distributing Knowledge in Building (2002), Aarhus School of Architecture, Denmark 1-8
-
(2002)
CIB w78 conference 2002 - Distributing Knowledge in Building
, pp. 1-8
-
-
Mallasi, Z.1
Dawood, N.2
-
8
-
-
21344467993
-
Combining different project modelling approaches for effective support of multi-disciplinary engineering tasks
-
Brandon P., Li H., Shaffii N., and Shen Q. (Eds), Langkawi, Malaysia
-
Fischer M., Hartmann T., Rank E., Neuberg F., Schreyer M., Liston K., and Kunz J. Combining different project modelling approaches for effective support of multi-disciplinary engineering tasks. In: Brandon P., Li H., Shaffii N., and Shen Q. (Eds). INCITE 2004 - International Conference on Information Technology in Design and Construction (2004), Langkawi, Malaysia 167-182
-
(2004)
INCITE 2004 - International Conference on Information Technology in Design and Construction
, pp. 167-182
-
-
Fischer, M.1
Hartmann, T.2
Rank, E.3
Neuberg, F.4
Schreyer, M.5
Liston, K.6
Kunz, J.7
-
9
-
-
1842832075
-
Trends of 4D CAD applications for construction planning
-
Heesom D., and Mahdjoubi L. Trends of 4D CAD applications for construction planning. Constr. Manag. Econ. 22 (February 2004) 171-182
-
(2004)
Constr. Manag. Econ.
, vol.22
, pp. 171-182
-
-
Heesom, D.1
Mahdjoubi, L.2
-
10
-
-
33846006512
-
-
Department of Architecture and Building, University of Melbourne, Melbourne, Australia
-
Mohr W.E. Project Management and Control. 5th edition (1991), Department of Architecture and Building, University of Melbourne, Melbourne, Australia
-
(1991)
Project Management and Control. 5th edition
-
-
Mohr, W.E.1
-
11
-
-
0000674566
-
Scheduling projects with repeating activities
-
Harris R.B., and Ioannou P.G. Scheduling projects with repeating activities. J. Constr. Eng. Manag. 124 (1998) 269-278
-
(1998)
J. Constr. Eng. Manag.
, vol.124
, pp. 269-278
-
-
Harris, R.B.1
Ioannou, P.G.2
-
12
-
-
33845972597
-
Empirical research on deviations in production and current state of project control
-
Bertelsen S., and Formoso C.T. (Eds), Helsingor, Denmark
-
Seppänen O., and Kankainen J. Empirical research on deviations in production and current state of project control. In: Bertelsen S., and Formoso C.T. (Eds). IGLC-12, 12th Conference of the International Group for Lean Construction (2004), Helsingor, Denmark 206-219
-
(2004)
IGLC-12, 12th Conference of the International Group for Lean Construction
, pp. 206-219
-
-
Seppänen, O.1
Kankainen, J.2
-
13
-
-
33845991472
-
A Line-of-Balance based schedule planning and control system
-
Martinez J.C., and Formoso C.T. (Eds), Virginia Tech, Virginia, USA
-
Kankainen J., and Seppänen O. A Line-of-Balance based schedule planning and control system. In: Martinez J.C., and Formoso C.T. (Eds). 11th International Group for Lean Construction Conference (2003), Virginia Tech, Virginia, USA
-
(2003)
11th International Group for Lean Construction Conference
-
-
Kankainen, J.1
Seppänen, O.2
-
14
-
-
33846001287
-
-
IAI, "International alliance for interoperability", [online] Available at:, [Accessed August 29, 2005].
-
-
-
-
15
-
-
10444242643
-
Moving beyond the fourth dimension with an IFC-based single project database
-
Tanyer A.M., and Aouad G. Moving beyond the fourth dimension with an IFC-based single project database. Autom. Constr. 14 (2005) 15-32
-
(2005)
Autom. Constr.
, vol.14
, pp. 15-32
-
-
Tanyer, A.M.1
Aouad, G.2
-
16
-
-
33845982165
-
Quantitative analysis using 4D models - an explorative study
-
Park C. (Ed), Korea Institute of Construction Engineering and Management, Seoul, Korea
-
Jongeling R., Kim J., Mourgues C., Fischer M., and Olofsson T. Quantitative analysis using 4D models - an explorative study. In: Park C. (Ed). First International Conference on Construction Engineering and Management (2005), Korea Institute of Construction Engineering and Management, Seoul, Korea
-
(2005)
First International Conference on Construction Engineering and Management
-
-
Jongeling, R.1
Kim, J.2
Mourgues, C.3
Fischer, M.4
Olofsson, T.5
-
17
-
-
0000718046
-
Management of production in construction: a theoretical view
-
Tommelein I.D., and Ballard G. (Eds), University of California, Berkeley, CA, USA
-
Koskela L. Management of production in construction: a theoretical view. In: Tommelein I.D., and Ballard G. (Eds). IGLC 7: Proceedings of the Annual Conference of the International Group for Lean Construction (1999), University of California, Berkeley, CA, USA 241-252
-
(1999)
IGLC 7: Proceedings of the Annual Conference of the International Group for Lean Construction
, pp. 241-252
-
-
Koskela, L.1
-
18
-
-
0041805006
-
Automated generation of work spaces required by construction activities
-
Akinci B., Fischer M., and Kunz J. Automated generation of work spaces required by construction activities. J. Constr. Eng. Manag. 128 (2002) 10
-
(2002)
J. Constr. Eng. Manag.
, vol.128
, pp. 10
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
|